944 resultados para Whole-life costing
Resumo:
Façade design is a complex and multi-disciplinary process. One major barrier to devising optimal façade solutions is the lack of a systematic way of evaluating the true social, economic and environmental impacts of a design. Another barrier is the lack of automated design aids to assist decision-making. In this paper, we present our on-going study in developing a whole-life value based multi-objective optimisation model for high-performance façades. The principal outcome of this paper is a multi-objective optimisation model for early-stage façade design. The optimisation technique coupled with other 3rd party software and/or specially developed scripts provide façade designers with an integrated design tool of wide applicability.
Resumo:
Fibre-Reinforced Plastics (FRPs) have been used in civil aerospace vehicles for decades. The current state-of-the-art in airframe design and manufacture results in approximately half the airframe mass attributable to FRP materials. The continual increase in the use of FRP materials over metallic alloys is attributable to the material's superior specific strength and stiffness, fatigue performance and corrosion resistance. However, the full potential of these materials has yet to be exploited as analysis methods to predict physical failure with equal accuracy and robustness are not yet available. The result is a conservative approach to design, but one that can bring benefit via increased inspection intervals and reduced cost over the vehicle life. The challenge is that the methods used in practice are based on empirical tests and real relationships and drivers are difficult to see in this complex process and so the trade-off decision is challenging and uncertain. The aim of this feasibility study was to scope a viable process which could help develop some rules and relationships based on the fundamental mechanics of composite material and the economics of production and operation, which would enhance understanding of the role and impact of design allowables across the life of a composite structure.
Resumo:
A whole life-cycle information management vision is proposed, the organizational requirements for the realization of the scenario is investigated. Preliminary interviews with construction professionals are reported. Discontinuities at information transfer throughout life-cycle of built environments are resulting from lack of coordination and multiple data collection/storage practices. A more coherent history of these activities can improve the work practices of various teams by augmenting decision making processes and creating organizational learning opportunities. Therefore, there is a need for unifying these fragmented bits of data to create a meaningful, semantically rich and standardized information repository for built environment. The proposed vision utilizes embedded technologies and distributed building information models. Two diverse construction project types (large one-off design, small repetitive design) are investigated for the applicability of the vision. A functional prototype software/hardware system for demonstrating the practical use of this vision is developed and discussed. Plans for case-studies for validating the proposed model at a large PFI hospital and housing association projects are discussed.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.
Resumo:
Major construction clients are increasingly looking to procure built facilities on the basis of added value, rather than capital cost. Recent advances in the procurement of construction projects have emphasised a whole-life value approach to meeting the client’s objectives, with strategies put in place to encourage long-term commitment and through-life service provision. Construction firms are therefore increasingly required to take on responsibility for the operation and maintenance of the construction project on the client’s behalf - with the emphasis on value and service. This inevitably throws up a host of challenges, not the least of which is the need for construction firms to manage and accommodate the new emphasis on service. Indeed, these ‘service-led’ projects represent a new realm of construction projects where the rationale for the project is driven by client’s objectives with some aspect of service provision. This vision of downstream service delivery increases the number of stakeholders, adds to project complexity and challenges deeply-ingrained working practices. Ultimately it presents a major challenge for the construction sector. This paper sets out to unravel some of the many implications that this change brings with it. It draws upon ongoing research investigating how construction firms can adapt to a more service-orientated built environment and add value in project-based environments. The conclusions lay bare the challenges that firms face when trying to compete on the basis of added-value and service delivery. In particular, how it affects deeply-ingrained working practices and established relationships in the sector.
Resumo:
Global temperatures are expected to rise by between 1.1 and 6.4oC this century, depending, to a large extent, on the amount of carbon we emit to the atmosphere from now onwards. This warming is expected to have very negative effects on many peoples and ecosystems and, therefore, minimising our carbon emissions is a priority. Buildings are estimated to be responsible for around 50% of carbon emissions in the UK. Potential reductions involve both operational emissions, produced during use, and embodied emissions, produced during manufacture of materials and components, and during construction, refurbishments and demolition. To date the major effort has focused on reducing the, apparently, larger operational element, which is more readily quantifiable and reduction measures are relatively straightforward to identify and implement. Various studies have compared the magnitude of embodied and operational emissions, but have shown considerable variation in the relative values. This illustrates the difficulties in quantifying embodied, as it requires a detailed knowledge of the processes involved in the different life cycle phases, and requires the use of consistent system boundaries. However, other studies have established the interaction between operational and embodied, which demonstrates the importance of considering both elements together in order to maximise potential reductions. This is borne out in statements from both the Intergovernmental Panel on Climate Change and The Low Carbon Construction Innovation and Growth Team of the UK Government. In terms of meeting the 2020 and 2050 timeframes for carbon reductions it appears to be equally, if not more, important to consider early embodied carbon reductions, rather than just future operational reductions. Future decarbonisation of energy supply and more efficient lighting and M&E equipment installed in future refits is likely to significantly reduce operational emissions, lending further weight to this argument. A method of discounting to evaluate the present value of future carbon emissions would allow more realistic comparisons to be made on the relative importance of the embodied and operational elements. This paper describes the results of case studies on carbon emissions over the whole lifecycle of three buildings in the UK, compares four available software packages for determining embodied carbon and suggests a method of carbon discounting to obtain present values for future emissions. These form the initial stages of a research project aimed at producing information on embodied carbon for different types of building, components and forms of construction, in a simplified form, which can be readily used by building designers in optimising building design in terms of minimising overall carbon emissions. Keywords: Embodied carbon; carbon emission; building; operational carbon.
Resumo:
There is potential to reduce both operational and embodied greenhouse gas emission from buildings. To date the focus has been on reducing the operational element, although given the urgency of carbon reductions, it may be more beneficial to consider upfront embodied carbon reductions. This paper describes a case study on the whole life carbon cycle of a warehouse building in Swindon, UK. It examines the relationship between embodied carbon (Ec) and operational carbon (Oc), the proportions of Ec from the structural and non-structural elements, carbon benchmarking of the structure, the value of ‘cradle to site’ or ‘cradle to grave’ assessments and the significance of the timing of emissions during the life of the building. The case study indicates that Ec was dominant for the building and that the structure was responsible for more than half of the Ec. Weighting of future emissions appears to be an important factor to consider. The PAS 2050 reduction factors had only a modest effect but weighting to allow for future decarbonisation of the national grid energy supply had a large effect. This suggests that future operational carbon emissions are being overestimated compared to embodied.