935 resultados para Town and city planning


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper outlines the shift of planning policy in Victoria under Premier Jeff Kennett and canvasses some related theoretical issues.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The most important crises in the planning system is related to the significance of "capitalist state" influences [3]. In the global context, Bengs states that there is a matter partiality between "global capitalism" and "national democracy"[4]. Bengs stresses that planning is closely related to the economy of a country, which is in one side the government wants to reduce taxes, while on the other side there is a dilemma of the global and indefinite solicitation of assets. Hall (2002) discusses the problems of the city; those are city planning, history of planning, and geographical setting. City planning is not only planning in one region but also including the district around the city, such as river basin and a certain regional culture. The urban planner should involve all those aspects in the city planning. Friedmann (2003) distinguishes planning theory into three types. First, planning theory is related to planning in particular fields such as land utilization, transportation, urban design, regional development, environmental planning etc. Second, the type of theory related to planning tout court, and the third type is the theory about planning itself. Sanyal (2002) states that although planners have limited autonomy, their actions affect policy result [5]. Friedman (2003) supports Sanyal's argument stressing that planners learned from their actions not from theories.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The 12 January 2010, an earthquake hit the city of Port-au-Prince, capital of Haiti. The earthquake reached a magnitude Mw 7.0 and the epicenter was located near the town of Léogâne, approximately 25 km west of the capital. The earthquake occurred in the boundary region separating the Caribbean plate and the North American plate. This plate boundary is dominated by left-lateral strike slip motion and compression, and accommodates about 20 mm/y slip, with the Caribbean plate moving eastward with respect to the North American plate (DeMets et al., 2000). Initially the location and focal mechanism of the earthquake seemed to involve straightforward accommodation of oblique relative motion between the Caribbean and North American plates along the Enriquillo-Plantain Garden fault system (EPGFZ), however Hayes et al., (2010) combined seismological observations, geologic field data and space geodetic measurements to show that, instead, the rupture process involved slip on multiple faults. Besides, the authors showed that remaining shallow shear strain will be released in future surface-rupturing earthquakes on the EPGFZ. In December 2010, a Spanish cooperation project financed by the Politechnical University of Madrid started with a clear objective: Evaluation of seismic hazard and risk in Haiti and its application to the seismic design, urban planning, emergency and resource management. One of the tasks of the project was devoted to vulnerability assessment of the current building stock and the estimation of seismic risk scenarios. The study was carried out by following the capacity spectrum method as implemented in the software SELENA (Molina et al., 2010). The method requires a detailed classification of the building stock in predominant building typologies (according to the materials in the structure and walls, number of stories and age of construction) and the use of the building (residential, commercial, etc.). Later, the knowledge of the soil characteristics of the city and the simulation of a scenario earthquake will provide the seismic risk scenarios (damaged buildings). The initial results of the study show that one of the highest sources of uncertainties comes from the difficulty of achieving a precise building typologies classification due to the craft construction without any regulations. Also it is observed that although the occurrence of big earthquakes usually helps to decrease the vulnerability of the cities due to the collapse of low quality buildings and the reconstruction of seismically designed buildings, in the case of Port-au-Prince the seismic risk in most of the districts remains high, showing very vulnerable areas. Therefore the local authorities have to drive their efforts towards the quality control of the new buildings, the reinforcement of the existing building stock, the establishment of seismic normatives and the development of emergency planning also through the education of the population.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project planning and architectural management of a port area should include many variables, it must be in harmony with its environment and its historical development as the key to successful integration. This article explains the elements which should be taken into account when doing such planning by describing the proposal presented on the ?Concurso public internacional de ideas para proyectar la ordenación urbanística y arquitectónica del área central del puerto de Vigo?, with the aim of sharing comprehensive applied design philosofy, it will inspire and help future designers. Creative imagination is great added value to engineering creations, but should not overwhelm functionality and sustainability, but to be in harmony with them. The maximum aesthetic expression in engineering is achieved as the product of the conceptual elegance of the functionality of the structures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Title varies slightly.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Plates printed on both sides.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thesis (Master's)--University of Washington, 2016-06

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT