822 resultados para The malaysian construction industry
Resumo:
Purpose: The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five-day working week from the industry standard six days) was implemented as an attempt to improve the work-life balance of employees. ----- ----- Design/methodology/approach: This paper was based on four case studies with mixed methods. Each case study has a variety of data collection methods which include questionnaires, short and long interviews, and focus groups. ----- ----- Findings: It was found that the complex mix of wage- and salary-earning staff within the construction industry, along with labour market pressures, means that changing to a five-day working week is quite a radical notion within the industry. However, there are some organisations willing to explore opportunities for change with mixed experiences. ----- ----- Practical implications: The practical implications of this research include understanding the complexity within the Australian construction industry, based around hours of work and pay systems. Decision-makers within the construction industry must recognize a range of competing pressures that mean that “preferred” managerial styles might not be appropriate. ----- ----- Originality/value:– This paper shows that construction firms must take an active approach to reducing the culture of long working hours. This can only be achieved by addressing issues of project timelines and budgets and assuring that take-home pay is not reliant on long hours of overtime.
Resumo:
Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
The main aim of this paper is to outline a proposed program of research which will attempt to quantify the extent of the problem of alcohol and other drugs in the Australian construction industry, and furthermore, develop an appropriate industry-wide policy and cultural change management program and implementation plan to address the problem. This paper will also present preliminary results from the study. The study will use qualitative and quantitative methods (in the form of interviews and surveys, respectively) to evaluate the extent of the problem of alcohol and other drug use in this industry, to ascertain the feasibility of an industry-wide policy and cultural change management program, and to develop an appropriate implementation plan. The study will be undertaken in several construction organisations, at selected sites in South Australia, Victoria and Northern Territory. It is anticipated that approximately 500 employees from the participating organisations across Australia will take part in the study. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) will be used to measure the extent of alcohol use in the industry. Illicit drug use, ‘‘readiness to change’’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding workplace AOD impairment, will also be measured through a combination of interviews and surveys. Among the preliminary findings, for 51% (n=127) of respondents, score on the AUDIT indicated alcohol use at hazardous levels. Of the respondents who were using alcohol at hazardous levels, 76% reported (n97) that they do not have a problem with drinking and 54% (n=68) reported that it would be easy to ‘‘cut down’’ or stop drinking. Nearly half (49%) of all respondents (n=122) had used marijuana/cannabis at some time prior to being surveyed. The use of other illicit substances was much less frequently reported. Preliminary interview findings indicated a lack of adequate employee knowledge regarding the physical effects of alcohol and other drugs in the workplace. As for conclusions, the proposed study will address a major gap in the literature with regard to the extent of the problem of alcohol and other drug use in the construction industry in Australia. The study will also develop and implement a national, evidence-based workplace policy, with the aim of mitigating the deleterious effects of alcohol and other drugs in this industry.
Resumo:
Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.
Resumo:
Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.
Resumo:
If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.
Resumo:
Building Information Modelling (BIM) has been regarded as a one stop shop capable of addressing the ills of the construction industry. Yet, while some firms have accepted BIM as a new way to work and gone on to record success, others (which have not so done) have raised such questions as: ‘How is BIM defined? Is it a tool or a process? Which kinds and sizes of organisations stand to benefit from BIM?’ These questions form the basis of this research. Hence, having explored the relevant body of literature, this research investigates three organisations within the UK – described as the earliest adopters of BIM – and considers how they have fared in terms of project performance in the years since adopting BIM; focusing on project cost, delivery time and quality achievement. This investigation also probed two of the leading voices in BIM in the UK in search of the much needed answers. The findings of the research show that successful projects executed in the organisations that have used BIM is predicated on its adoption as a process, rather than as a tool of technology; a process that changes the way work in the construction industry is typically done. Moreover, the successes recorded in the firms researched give credence to project success consequent upon adopting BIM. Nevertheless, the findings of this research show that the cornerstone of this success is leadership-driven innovation.
Resumo:
- Purpose The purpose of this paper is to investigate the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. - Design/methodology/approach An internet-based survey was administered to collect the opinions of construction employees about the workplace-training environment and their perceptions towards training. The survey intended to address the following research questions, specifically in relation to the construction industry. - Findings The survey results reveal that whilst overall participation in workplace training is high, the current workplace training environments do not foster balanced skill development. The study reveals that in the current absence of a formal and well-balanced training mechanism, construction workers generally resort to their own informal self-development initiatives to develop the needed role-specific theoretical knowledge. - Research limitations/implications The findings of the research are based on the data primarily collected in the construction industry in Queensland, Australia. The data are limited to a single Tier 2 construction company. - Practical implications The findings of this study can be utilised to suggest improvements in the current (or develop new) workplace training initiatives. - Social implications The research suggests that workplace training has positive relationship with career growth. The results suggest that in the construction industry, employees are generally well aware of the importance of workplace training in their career development and they largely appreciate training as being a critical factor for developing their capacity to perform their roles successfully, and to maintain their employability. - Originality/value This paper is unique as it investigates the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. So far no work has been undertaken to identify and discusses the main method of workplace learning within the Tier 2 industry in the context of Queensland Australia.
Resumo:
Triggered by the very quick proliferation of Internet connectivity, electronic document management (EDM) systems are now rapidly being adopted for managing the documentation that is produced and exchanged in construction projects. Nevertheless there are still substantial barriers to the efficient use of such systems, mainly of a psychological nature and related to insufficient training. This paper presents the results of empirical studies carried out during 2002 concerning the current usage of EDM systems in the Finnish construction industry. The studies employed three different methods in order to provide a multifaceted view of the problem area, both on the industry and individual project level. In order to provide an accurate measurement of overall usage volume in the industry as a whole telephone interviews with key personnel from 100 randomly chosen construction projects were conducted. The interviews showed that while around 1/3 of big projects already have adopted the use of EDM, very few small projects have adopted this technology. The barriers to introduction were investigated through interviews with representatives for half a dozen of providers of systems and ASP-services. These interviews shed a lot of light on the dynamics of the market for this type of services and illustrated the diversity of business strategies adopted by vendors. In the final study log files from a project which had used an EDM system were analysed in order to determine usage patterns. The results illustrated that use is yet incomplete in coverage and that only a part of the individuals involved in the project used the system efficiently, either as information producers or consumers. The study also provided feedback on the usefulness of the log files.