961 resultados para Small wind power plants


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study focuses on two effects of the presence of a noncondensable gas on the thermal-hydraulic behavior of thecoolant of the primary circuit of a nuclear reactor in the VVER-440 geometry inabnormal situations. First, steam condensation with the presence of air was studied in the horizontal tubes of the steam generator (SG) of the PACTEL test facility. The French thermal-hydraulic CATHARE code was used to study the heat transfer between the primary and secondary side in conditions derived from preliminary experiments performed by VTT using PACTEL. In natural circulation and single-phase vapor conditions, the injection of a volume of air, equivalent to the totalvolume of the primary side of the SG at the entrance of the hot collector, did not stop the heat transfer from the primary to the secondary side. The calculated results indicate that air is located in the second half-length (from the mid-length of the tubes to the cold collector) in all the tubes of the steam generator The hot collector remained full of steam during the transient. Secondly, the potential release of the nitrogen gas dissolved in the water of the accumulators of the emergency core coolant system of the Loviisa nuclear power plant (NPP) was investigated. The author implemented a model of the dissolution and release ofnitrogen gas in the CATHARE code; the model created by the CATHARE developers. In collaboration with VTT, an analytical experiment was performed with some components of PACTEL to determine, in particular, the value of the release time constant of the nitrogen gas in the depressurization conditions representative of the small and intermediate break transients postulated for the Loviisa NPP. Such transients, with simplified operating procedures, were calculated using the modified CATHARE code for various values of the release time constant used in the dissolution and release model. For the small breaks, nitrogen gas is trapped in thecollectors of the SGs in rather large proportions. There, the levels oscillate until the actuation of the low-pressure injection pumps (LPIS) that refill the primary circuit. In the case of the intermediate breaks, most of the nitrogen gas is expelled at the break and almost no nitrogen gas is trapped in the SGs. In comparison with the cases calculated without taking into account the release of nitrogen gas, the start of the LPIS is delayed by between 1 and 1.75 h. Applicability of the obtained results to the real safety conditions must take into accountthe real operating procedures used in the nuclear power plant.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The subject of this master’s thesis is to research grounding in a particular wind power application. The aim is to define how the grounding from different points effects to the function of the whole system. The investigated subjects are generator voltage spikes, ground currents and system fault situations. The first part of this thesis represents power electronics, which is commonly used in wind power systems. The second part concentrates more to the grounding, electrical safety demands and potential fault situations. The object of the simulations is to investigate voltage spikes and fault situations. Measurements will be made with small-scale setup and in the last part simulation and measurement results are compared to each other and to a full-scale system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

ABSTRACT The successful in the implementation of wind turbines depends on several factors, including: the wind resource at the installation site, the equipment used, project acquisition and operational costs. In this paper, the production of electricity from two small wind turbines was compared through simulation using the computer software HOMER - a national model of 6kW and an imported one of 5kW. The wind resources in three different cities were considered: Campinas (SP/BR), Cubatão (São Paulo/BR) and Roscoe (Texas/ USA). A wind power system connected to the grid and a wind isolated system - batteries were evaluated. The results showed that the energy cost ($/kWh) is strongly dependent on the windmill characteristics and local wind resource. Regarding the isolated wind system – batteries, the full supply guarantee to the simulated electrical load is only achieved with a battery bank with many units and high number of wind turbines, due to the intermittency of wind power.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by darns established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the analysis of some usual MPPT (Maximum Power Point Tracking) strategies intended for small wind energy conversion (up to 1kW) based on permanent magnet synchronous generators (PMSG), considering the stand-alone application for a novel buck-boost integrated inverter. Each MPPT method is analytically introduced and then it is simulated using MatLab/Simulink considering standard conditions of wind and also commercially available turbines and generators. The extracted power in each case is compared with the maximum available power, so the tracking factor is calculated for each method. Thus, the focus is on the application to improve the efficiency of stand-alone wind energy conversion systems (WECS) with battery chargers and AC load supplied by inverter. Therefore, for this purpose a novel single phase buck-boost integrated inverter is introduced. Finally, the main experimental results for the introduced inverter are presented. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hybrid system micro-generation integration of PV-wind power is presented by a form of energy in which problems resulting from variability in the intensity of wind and solar intensity are possible mitigation either by complementation between one source to another or the largest stability configured by the generate the system. Based on this context, this work aims to assessing the performance of a hybrid system PV-wind power energy small of a rural property for their electrification. The study has been developed at the Rural Laboratory Powering from Engineering Department of UNESP. In order to present this research, a hybrid system has been installed PV-wind power, composed of one 400Wp windmill and a 300 Wp PV-system. The results obtained allowed us to evaluate the solar and wind energy supplied ranked among 285 and 360 kWh electric power generated by the PV-wind power hybrid system stood between 25,5 and 31 kWh. At is to say achieving yield of approximately than 10% during one year observation period, i.e., it was concluded that the performance of the hybrid system depended essentially the energy received and generated by the PV-system and that there was complementation between generating wind power and PV-systems with regard to time of day and the annual seasons by confirming the technical feasibility of this kind system of micro-generation in small rural properties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In October 2008, the Brazilian Government announced plans to invest US$212 billion in the construction of nuclear power plants, totaling a joint capacity of 60,000 MW. Apart from this program, officials had already announced the completion of the construction of the nuclear plant Angra III; the construction of large-scale hydroelectric plans in the Amazon and the implantation of natural gas, biomass and coal thermoelectric plants in other regions throughout the country. Each of these projects has its proponents and its opponents, who bring forth concerns and create heated debates in the specialized forums. In this article, some of these concerns are explained, especially under the perspective of the comparative analysis of costs involved. Under such merit figures, the nuclear option, when compared to hydro plants, combined with conventional thermal and biomass-fueled plants, and even wind, to expand Brazilian power-generation capacity, does not appear as a priority. (C) 2009 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trigeneration systems have been used with advantage in the last years in distributed electricity generation systems as a function of a growth of natural gas pipeline network distribution system, tax incentives, and energy regulation policies. Typically, a trigeneration system is used to produce electrical power simultaneously with supplying heating and cooling load by recovering the combustion products thermal power content that otherwise would be driven to atmosphere. Concerning that, two small scale trigeneration plants have been tested for overall efficiency evaluation and operational comparison. The first system is based on a 30 kW (ISO) natural gas powered microturbine, and the second one uses a 26 kW natural gas powered internal combustion engine coupled to an electrical generator as a prime mover. The stack gases from both machines were directed to a 17.6 kW ammonia-water absorption refrigeration chiller for producing chilled water first and next to a water heat recovery boiler in order to produce hot water. Experimental results are presented along with relevant system operational parameters for appropriate operation including natural gas consumption, net electrical and thermal power production, i.e., hot and cold water production rates, primary energy saving index, and the energy utilization factor over total and partial electrical load operational conditions. (c) 2011 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of power systems has increased in recent years due to the operation of existing transmission lines closer to their limits, using flexible AC transmission system (FACTS) devices, and also due to the increased penetration of new types of generators that have more intermittent characteristics and lower inertial response, such as wind generators. This changing nature of a power system has considerable effect on its dynamic behaviors resulting in power swings, dynamic interactions between different power system devices, and less synchronized coupling. This paper presents some analyses of this changing nature of power systems and their dynamic behaviors to identify critical issues that limit the large-scale integration of wind generators and FACTS devices. In addition, this paper addresses some general concerns toward high compensations in different grid topologies. The studies in this paper are conducted on the New England and New York power system model under both small and large disturbances. From the analyses, it can be concluded that high compensation can reduce the security limits under certain operating conditions, and the modes related to operating slip and shaft stiffness are critical as they may limit the large-scale integration of wind generation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"Program opportunity notice (PON) number DE-PN-07-79-ID-12043."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"February 1983."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We assess the feasibility of hybrid solar-biomass power plants for use in India in various applications including tri-generation, electricity generation and process heat. To cover this breadth of scenarios we analyse, with the help of simulation models, case studies with peak thermal capacities ranging from 2 to 10 MW. Evaluations are made against technical, financial and environmental criteria. Suitable solar multiples, based on the trade-offs among the various criteria, range from 1 to 2.5. Compared to conventional energy sources, levelised energy costs are high - but competitive in comparison to other renewables such as photovoltaic and wind. Long payback periods for hybrid plants mean that they cannot compete directly with biomass-only systems. However, a 1.2-3.2 times increase in feedstock price will result in hybrid systems becoming cost competitive. Furthermore, in comparison to biomass-only, hybrid operation saves up to 29% biomass and land with an 8.3-24.8 $/GJ/a and 1.8-5.2 ¢/kWh increase in cost per exergy loss and levelised energy cost. Hybrid plants will become an increasingly attractive option as the cost of solar thermal falls and feedstock, fossil fuel and land prices continue to rise. In the foreseeable future, solar will continue to rely on subsidies and it is recommended to subsidise preferentially tri-generation plants. © 2012 Elsevier Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A grid-connected DFIG for wind power generation can affect power system small-signal angular stability in two ways: by changing the system load flow condition and dynamically interacting with synchronous generators (SGs). This paper presents the application of conventional method of damping torque analysis (DTA) to examine the effect of DFIG’s dynamic interactions with SGs on the small-signal angular stability. It shows that the effect is due to the dynamic variation of power exchange between the DFIG and power system and can be estimated approximately by the DTA. Consequently, if the DFIG is modelled as a constant power source when the effect of zero dynamic interactions is assumed, the impact of change of load flow brought about by the DFIG can be determined. Thus the total effect of DFIG can be estimated from the result of DTA added on that of constant power source model. Applications of the DTA method proposed in the paper are discussed. An example of multi-machine power systems with grid-connected DFIGs are presented to demonstrate and validate the DTA method proposed and conclusions obtained in the paper.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The combined-cycle gas and steam turbine power plant presents three main pieces of equipment: gas turbines, steam turbines and heat recovery steam generator (HRSG). In case of HRSG failure the steam cycle is shut down, reducing the power plant output. Considering that the technology for design, construction and operation of high capacity HRSGs is quite recent its availability should be carefully evaluated in order to foresee the performance of the power plant. This study presents a method for reliability and availability evaluation of HRSGs installed in combined-cycle power plant. The method`s first step consists in the elaboration of the steam generator functional tree and development of failure mode and effects analysis. The next step involves a reliability and availability analysis based on the time to failure and time to repair data recorded during the steam generator operation. The third step, aiming at availability improvement, recommends the fault-tree analysis development to identify components the failure (or combination of failures) of which can cause the HRSG shutdown. Those components maintenance policy can be improved through the use of reliability centered maintenance (RCM) concepts. The method is applied on the analysis of two HRSGs installed in a 500 MW combined-cycle power plant. (C) 2010 Elsevier Ltd. All rights reserved.