971 resultados para Site investigation


Relevância:

60.00% 60.00%

Publicador:

Resumo:

A site investigation was conducted to correlate the relationships between microcystins (MC) concentration and algal growth in Dianchi Lake in China. Laboratory experiments were undertaken to test the effects of sediment adsorption, photoirradiation and biodegradation on microcystins removal. Bioaccumulation of microcystins was also determined using silver carp fish. It was observed that MC concentrations varied in accordance with algae growth in Dianchi Lake. The results obtained in the laboratory demonstrated that the removal of MC with fresh sediments was less than 10%, photoirradiation removed more than 75% MC within two hours, and the biodegradation needed much longer time to produce substantial degradation of MC. The results suggest that bioaccumulation of microcystins in fish was not significant in Dianchi Lake.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

After the excavation of Jinping underground cavern, a strong expansion appears along the unloading direction of the rock mass, mainly in the type of tensile rupture, accompanied by shear destruction, unloading resulted in significant deterioration of mechanical properties of rock. Based on the in-site investigation of rock mass structure, via analyzing the acoustic testing data, we identify the unloading range of the side walls and the division of rock types, and carry out with the solution of rock mechanical parameters about different unloading zone, providing geological foundation for the supporting design of the following design of the side walls, at the same time, providing reference for the selection of mechanical parameters of other underground excavation engineering with similar geological conditions.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Evaluating the mechanical properties of rock masses is the base of rock engineering design and construction. It has great influence on the safety and cost of rock project. The recognition is inevitable consequence of new engineering activities in rock, including high-rise building, super bridge, complex underground installations, hydraulic project and etc. During the constructions, lots of engineering accidents happened, which bring great damage to people. According to the investigation, many failures are due to choosing improper mechanical properties. ‘Can’t give the proper properties’ becomes one of big problems for theoretic analysis and numerical simulation. Selecting the properties reasonably and effectively is very significant for the planning, design and construction of rock engineering works. A multiple method based on site investigation, theoretic analysis, model test, numerical test and back analysis by artificial neural network is conducted to determine and optimize the mechanical properties for engineering design. The following outcomes are obtained: (1) Mapping of the rock mass structure Detailed geological investigation is the soul of the fine structure description. Based on statistical window,geological sketch and digital photography,a new method for rock mass fine structure in-situ mapping is developed. It has already been taken into practice and received good comments in Baihetan Hydropower Station. (2) Theoretic analysis of rock mass containing intermittent joints The shear strength mechanisms of joint and rock bridge are analyzed respectively. And the multiple modes of failure on different stress condition are summarized and supplied. Then, through introducing deformation compatibility equation in normal direction, the direct shear strength formulation and compression shear strength formulation for coplanar intermittent joints, as well as compression shear strength formulation for ladderlike intermittent joints are deducted respectively. In order to apply the deducted formulation conveniently in the real projects, a relationship between these formulations and Mohr-Coulomb hypothesis is built up. (3) Model test of rock mass containing intermittent joints Model tests are adopted to study the mechanical mechanism of joints to rock masses. The failure modes of rock mass containing intermittent joints are summarized from the model test. Six typical failure modes are found in the test, and brittle failures are the main failure mode. The evolvement processes of shear stress, shear displacement, normal stress and normal displacement are monitored by using rigid servo test machine. And the deformation and failure character during the loading process is analyzed. According to the model test, the failure modes quite depend on the joint distribution, connectivity and stress states. According to the contrastive analysis of complete stress strain curve, different failure developing stages are found in the intact rock, across jointed rock mass and intermittent jointed rock mass. There are four typical stages in the stress strain curve of intact rock, namely shear contraction stage, linear elastic stage, failure stage and residual strength stage. There are three typical stages in the across jointed rock mass, namely linear elastic stage, transition zone and sliding failure stage. Correspondingly, five typical stages are found in the intermittent jointed rock mass, namely linear elastic stage, sliding of joint, steady growth of post-crack, joint coalescence failure, and residual strength. According to strength analysis, the failure envelopes of intact rock and across jointed rock mass are the upper bound and lower bound separately. The strength of intermittent jointed rock mass can be evaluated by reducing the bandwidth of the failure envelope with geo-mechanics analysis. (4) Numerical test of rock mass Two sets of methods, i.e. the distinct element method (DEC) based on in-situ geology mapping and the realistic failure process analysis (RFPA) based on high-definition digital imaging, are developed and introduced. The operation process and analysis results are demonstrated detailedly from the research on parameters of rock mass based on numerical test in the Jinping First Stage Hydropower Station and Baihetan Hydropower Station. By comparison,the advantages and disadvantages are discussed. Then the applicable fields are figured out respectively. (5) Intelligent evaluation based on artificial neural network (ANN) The characters of both ANN and parameter evaluation of rock mass are discussed and summarized. According to the investigations, ANN has a bright application future in the field of parameter evaluation of rock mass. Intelligent evaluation of mechanical parameters in the Jinping First Stage Hydropower Station is taken as an example to demonstrate the analysis process. The problems in five aspects, i. e. sample selection, network design, initial value selection, learning rate and expected error, are discussed detailedly.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A 37-m thick layer of stratified clay encountered during a site investigation at Swann's Bridge, near the sea-coast at Limavady, Northern Ireland, is one of the deepest and thickest layers of this type of material recorded in Ireland. A study of the relevant literature and stratigraphic evidence obtained from the site investigation showed that despite being close to the current shoreline, the clay was deposited in a fresh-water glacial lake formed approximately 13 000 BP. The 37-m layer of clay can be divided into two separate zones. The lower zone was deposited as a series of laminated layers of sand, silt, and clay, whereas the upper zone was deposited as a largely homogeneous mixture. A comprehensive series of tests was carried out on carefully selected samples from the full thickness of the deposit. The results obtained from these tests were complex and confusing, particularly the results of tests done on samples from the lower zone. The results of one-dimensional compression tests, unconsolidated undrained triaxial tests, and consolidated undrained triaxial compression tests showed that despite careful sampling, all of the specimens from the lower zone exhibited behaviour similar to that of reconstituted clays. It was immediately clear that the results needed explanation. This paper studies possible causes of the results from tests carried out on the lower Limavady clay. It suggests a possible mechanism based on anisotropic elasticity, yielding, and destructuring that provides an understanding of the observed behaviour.Key words: clay, laminations, disturbance, yielding, destructuring, reconstituted.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Following a thorough site investigation, a biological Sequential Reactive Barrier (SEREBAR), designed to remove Polycyclic Aromatic Hydrocarbons (PAHs) and BTEX compounds, was installed at a Former Manufactured Gas Plant (FMGP) site. The novel design of the barrier comprises, in series, an interceptor and six reactive chambers. The first four chambers (2 nonaerated-2 aerated) were filled with sand to encourage microbial colonization. Sorbant Granular Activated Carbon (GAC) was present in the final two chambers in order to remove any recalcitrant compounds. The SEREBAR has been in continuous operation for 2 years at different operational flow rates (ranging from 320 L/d to 4000 L/d, with corresponding residence times in each chamber of 19 days and 1.5 days, respectively). Under low flow rate conditions (320-520 L/d) the majority of contaminant removal (>93%) occurred biotically within the interceptor and the aerated chambers. Under high flow rates (1000-4000 L/d) and following the installation of a new interceptor to prevent passive aeration, the majority of contaminant removal (>80%) again occurred biotically within the aerated chambers. The sorption zone (GAC) proved to be an effective polishing step, removing any remaining contaminants to acceptable concentrations before discharge down-gradient of the SEREBAR (overall removals >95%).

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Index properties such as the liquid limit and plastic limit are widely used to evaluate certain geotechnical parameters of fine-grained soils. Measurement of the liquid limit is a mechanical process, and the possibility of errors occurring during measurement is not significant. However, this is not the case for plastic limit testing, despite the fact that the current method of measurement is embraced by many standards around the world. The method in question relies on a fairly crude procedure known widely as the ‘thread rolling' test, though it has been the subject of much criticism in recent years. It is essential that a new, more reliable method of measuring the plastic limit is developed using a mechanical process that is both consistent and easily reproducible. The work reported in this paper concerns the development of a new device to measure the plastic limit, based on the existing falling cone apparatus. The force required for the test is equivalent to the application of a 54 N fast-static load acting on the existing cone used in liquid limit measurements. The test is complete when the relevant water content of the soil specimen allows the cone to achieve a penetration of 20 mm. The new technique was used to measure the plastic limit of 16 different clays from around the world. The plastic limit measured using the new method identified reasonably well the water content at which the soil phase changes from the plastic to the semi-solid state. Further evaluation was undertaken by conducting plastic limit tests using the new method on selected samples and comparing the results with values reported by local site investigation laboratories. Again, reasonable agreement was found.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Soil gas emissions of methane and carbon dioxide on brownfield sites are usually attributed to anthropogenic activities; however geogenic sources of soil gas are often not considered during site investigation and risk management strategies. This paper presents a field study at a redeveloped brownfield site on a flood plain to identify accumulations of methane biogas trapped in underlying sediments. The investigation is based on a multidisciplinary approach using direct multi-level sampling measurements and Earth resistivity tomography . Resistivity imaging was applied to evaluate the feasibility of identifying the size and spatial continuity of soil gas accumulations in anthropogenic and naturally occurring deposits. As a result, biogas accumulations are described within both anthropogenic deposits and pristine organic sediments. This result is important to identify the correct approaches to identify and manage risks associated with soil gas emissions on brownfield and pristine sites. The organic-rich sediments in Quaternary fluvial environments of São Paulo Basin in particular the Tietê River, biogas reservoirs can be generated and trapped beneath geogenic and anthropogenic layers, potentially requiring the management of brownfield developments across this region.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes the hydrogeological processes which caused unexpected instability and quick conditions during the excavation of a 25m deep cutting through a drumlin in County Down, Northern Ireland. A conceptual hydrogeological model of the cutting, based on pore pressures monitored during and after the excavation demonstrates how quick conditions at the toe of the cutting caused liquefaction of the till. Stability of the cutting was re-established by draining the highly permeable, weathered Greywacke which underlies the drumlin, through the use of a deep toe drain. In spite of this drainage, the cutting was only marginally stable due to the presence of a low permeability zone in the till above the bedrock which limits the reduction of elevated pore pressures within the upper to mid-depths of the drumlin. The factor of safety has been further improved by the addition of vertical relief drains at the crest and berm of the cutting to relieve the pore-pressures within the upper till by intercepting the weathered bedrock. The paper also highlights the importance of carrying out an adequate site investigation compliant with Eurocode 7 and additional monitoring in excavations in stiff, low permeability till.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A site investigation program was carried out to detect salt-water intrusions in a shallow sedimentary aquifer based on electrical resistivity measurements. The site is located close to Paranaguá harbor, in the Paraná State, Brasil. At this site, high chloride concentration contaminated shallow water wells used to supply water for local industries. The site investigation program included a fieldwork, dipole-dipole electrical profiling, resistivity piezocone tests, physical-chemical analysis of sampled water and interpretation of borehole logs. The resistivity piezocone tests provided two simultaneous information; the soil stratigraphy at a very detailed level and a quasi-continuous resistivity profile. Both information adequately complemented dipole-dipole electrical profiling test data. The integration of all test data allowed identifying the contaminated areas as well as guided the location of new water wells to be installed in this area.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper presents a system for performing down-hole seismic test together with the piezocone test in order to determine the shear wave velocity (Vs) and for calculating the maximum shear modulus (Go); a basic parameter for analyzing the dynamic soil behavior and a reference value of the soil stiffness. The system components are described and tests results for checking the geophone response are also presented, both before and after installation into the probe. The system was used in down-hole tests carried out at three experimental research sites located in the interior of Sao Paulo State, Brazil, where in situ seismic test results are available. The Vs values measured in down-hole tests carried out with this system were consistent with those determined in cross-hole tests and with a commercial seismic piezocone, which enabled to validate the developed system.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

O ensaio de penetração do cone elétrico e do piezocone pertence a um grupo de ensaios de campo, cuja utilização vem sendo cada vez mais difundida. Tanto o avanço da eletrônica como a rápida evolução da informática têm proporcionado equipamentos mais apropriados, menores, mais robustos e mais econômicos, permitindo a incorporação de diversos sensores a essa ferramenta de investigação. Isto contribuiu para que esse ensaio se consagrasse para a descrição contínua do perfil geotécnico, a definição do nível de água e para estimativa de parâmetros mecânicos do solo. Neste artigo faz-se uma breve apresentação do piezocone e do minicone elétrico: o primeiro vem sendo utilizado nos últimos anos, especialmente em geotecnia ambiental, e o segundo, na investigação da infra-estrutura de transportes. Apresentam-se e discutem-se exemplos de emprego do piezocone para identificação de regiões do maciço contaminadas e do minicone para detectar a superfície de ruptura de uma seção de um talude de aterro, para avaliar sua estabilidade através de retroanálises. Concluise o trabalho fazendo-se algumas considerações sobre a utilização dessa tecnologia moderna e recente em solos tropicais que ocorrem no Brasil.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Para hacerse cargo del legado de las Plantas de Gas Manufacturado (MGP) en el Estado de Nueva York, la División de Remediación Medioambiental del Departamento de Conservación Medioambiental, creo las Investigaciones de las áreas afectadas y el Programa de Remediación Medioambiental. Con el paso de los años, la conciencia y entendimiento de la importancia y complejidad de estos proyectos fue creciendo, ya que las investigaciones realizadas daban fe del tamaño y extensión de la contaminación asociada a las plantas de gas manufacturado, propiedad ahora de las diversas compañías de gas que operan a lo largo y ancho del Estado de Nueva York. Tras varios años dentro del Programa de Remediación Medioambiental, muchas de estas compañías han intentado manejar estos vastos y complejos proyectos como han podido, dejándose llevar un poco, subestimando y pasando por alto muchos detalles, ya que al fin y al cabo son proyecto regulados por el estado y que, por tanto, son financiados enteramente por este. Esto ha ido causando en los últimos años grandes problemas a algunas Compañías que a la hora de reportar estos proyectos se han encontrado con una falta total de control y grandes lagunas que resolver. Una técnica para resolver estos problemas es hacer uso de grandes técnicas de gestión empresarial como es el Project Management. En este proyecto se exponen y desarrollan las técnicas que han de utilizarse para integrar la Gestión de Proyectos con el fin de poder gestionar y coordinar las competentes demandas de alcance, tiempo, costes, calidad, recursos, y riesgos con el fin de alcanzar los requerimientos y objetivos del proyecto y de la Compañía. ABSTRACT To address the Manufactured Gas Plant (MGP) legacy in New York State, the Department of Environmental Conservation’s Division of Environmental Remediation has established the MGP Site Investigation and Remediation Programs. With the passage of time the Department’s understanding of the complexity of these sites grew, as investigations identified the extend of the contamination problem associated with many MGPs, property of the Operating Companies in the State. Through many years under the Remediation Programs, some Operating Companies have tried to manage these large and complex projects as they could, underestimating and overlooking them, as they were, in fact, regulated and financed by the Department. This has cause a lot of controlling issues and gaps to solve to the companies. Now the companies are trying to solve this kind of problems using the more innovative management techniques, as Project Management. This project expose and explains how to integrate the project management processes into the MGP Projects under the Remediation Program, to manage and balance the competing demands of scope, time ,cost, quality, resources, and risk to meet the project and company’s requirements and objectives.