867 resultados para Safety, Construction management, Statistics


Relevância:

100.00% 100.00%

Publicador:

Resumo:

We explore the contribution of socio-technical networks approaches to construction management research. These approaches are distinctive for their analysis of actors and objects as mutually constituted within socio-technical networks. They raise questions about the ways in which the content, meaning and use of technology is negotiated in practice, how particular technical configurations are elaborated in response to specific problems and why certain paths or solutions are adopted rather than others. We illustrate this general approach with three case studies: a historical study of the development of reinforced concrete in France, the UK and the US, the recent introduction of 3D-CAD software into four firms and an analysis of the uptake of environmental assessment technologies in the UK since 1990. In each we draw out the ways in which various technologies shaped and were shaped by different socio-technical networks. We conclude with a reflection on the contributions of socio-technical network analysis for more general issues including the study of innovation and analyses of context and power.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has become a truly global network of interconnected stakeholders making demands which require the involvement of skilled workforces from all over the world. Construction Management Strategies sets the foundations for understanding and managing construction’s inherent complexity and uniqueness. It establishes clear definitions of commonly accepted terms like built environment, construction, civil engineering, etc. which are often given confusing and conflicting interpretations. It cuts through the plethora of overlapping role titles currently used in the construction sector that make it difficult to establish how projects are actually managed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Individual-level constructs are seldom taken into consideration in construction management research relating to project performance. This is antithetical to the objectives of properly conceptualizing and contextualizing the research we do because many project performance outcomes, such as the extent of cooperation and level of communication or teamwork are influenced and moderated by individuals’ perceptions, values and behaviour. A brief review of the literature in organizational studies centred on culture, identity, empowerment and trust is offered. These constructs are then explored in relation to project performance issues and outcomes, and it is noted that they are predominantly studied at the project and industry levels. We argue that focusing these constructs at the individual unit of analysis has significant implications for project performance and therefore their effects need to be systematically accounted for in explanations of the success and failure of projects. Far from being prescriptive, the aim is to generate interest and awareness for more focused research at the individual level of analysis in order to add new insights and perspectives to critical performance questions in construction management. To this end, a research agenda is outlined, arguing that construction management research integrating individual-level constructs and broader, macro-contextual issues will help define and enhance the legitimacy of the field.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the development of the Virtual Construction Simulator (VCS) 3 - a simulation game-based educational tool for teaching construction schedule planning and management. The VCS3 simulation game engages students in learning the concepts of planning and managing construction schedules through goal driven exploration, employed strategies, and immediate feedback. Through the planning and simulation mode, students learn the difference between the as-planned and as-built schedules resulting from varying factors such as resource availability, weather and labor productivity. This paper focuses on the development of the VCS3 and its construction physics model. Challenges inherent in the process of identifying variables and their relationships to reliably represent and simulate the dynamic nature of planning and managing of construction projects are also addressed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the project, managers encounter numerous contingencies and are faced with the challenging task of making decisions that will effectively keep the project on track. This task is very challenging because construction projects are non-prototypical and the processes are irreversible. Therefore, it is critical to apply a methodological approach to develop a few alternative management decision strategies during the planning phase, which can be deployed to manage alternative scenarios resulting from expected and unexpected disruptions in the as-planned schedule. Such a methodology should have the following features but are missing in the existing research: (1) looking at the effects of local decisions on the global project outcomes, (2) studying how a schedule responds to decisions and disruptive events because the risk in a schedule is a function of the decisions made, (3) establishing a method to assess and improve the management decision strategies, and (4) developing project specific decision strategies because each construction project is unique and the lessons from a particular project cannot be easily applied to projects that have different contexts. The objective of this dissertation is to develop a schedule-based simulation framework to design, assess, and improve sequences of decisions for the execution stage. The contribution of this research is the introduction of applying decision strategies to manage a project and the establishment of iterative methodology to continuously assess and improve decision strategies and schedules. The project managers or schedulers can implement the methodology to develop and identify schedules accompanied by suitable decision strategies to manage a project at the planning stage. The developed methodology also lays the foundation for an algorithm towards continuously automatically generating satisfactory schedule and strategies through the construction life of a project. Different from studying isolated daily decisions, the proposed framework introduces the notion of {em decision strategies} to manage construction process. A decision strategy is a sequence of interdependent decisions determined by resource allocation policies such as labor, material, equipment, and space policies. The schedule-based simulation framework consists of two parts, experiment design and result assessment. The core of the experiment design is the establishment of an iterative method to test and improve decision strategies and schedules, which is based on the introduction of decision strategies and the development of a schedule-based simulation testbed. The simulation testbed used is Interactive Construction Decision Making Aid (ICDMA). ICDMA has an emulator to duplicate the construction process that has been previously developed and a random event generator that allows the decision-maker to respond to disruptions in the emulation. It is used to study how the schedule responds to these disruptions and the corresponding decisions made over the duration of the project while accounting for cascading impacts and dependencies between activities. The dissertation is organized into two parts. The first part presents the existing research, identifies the departure points of this work, and develops a schedule-based simulation framework to design, assess, and improve decision strategies. In the second part, the proposed schedule-based simulation framework is applied to investigate specific research problems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma), together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc.).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Safety Bureau, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Safety Bureau, Washington, D.C.