854 resultados para Risk and performance
Resumo:
This book analyses the principles underlying the construction and application of a number of boilerplate and other clauses commonly included in commercial contracts. The first Part of the work deals with general principles of interpretation. It then considers clauses which allocate commercial risk; clauses relating to performance; clauses introducing new parties by way of assignment, novation or nomination; clauses such as guarantees and indemnities which create liabilities in third parties; and dispute resolution clauses including governing law. The authors highlight common issues surrounding the application of these clauses in practice and, where appropriate, make drafting recommendations based on their analysis of case law and the operation of relevant statutes. This is a very accessible resource for all commercial practitioners.
Resumo:
With Safe Design and Construction of Machinery, the author presents the results of empirical studies into this significant aspect of safety science in a very readable, well-structured format. The book contains 436 references, 17 tables, one figure and a comprehensive index. Liz Bluff addresses a complex and important, but often neglected domain in OHS – the safety of machinery – in a holistic and profound, yet evidence based analysis; with many applied cases from her studies, which make the book accessible and a pleasant lecture. Although research that led to this remarkable publication might have been primarily focused on the regulators, this book can be highly recommended to all OHS academics and practitioners. It provides an important contribution to the body of knowledge in OHS, and establishes one of the few Australian in-depth insights into the significance of machinery producers, rather than machinery users in the wider framework of risk management. The author bases this fresh perspective on the well-established European Machinery Safety guidelines, and grounds her mixed-methods research predominantly in qualitative analysis of motivation and knowledge, which eventually leads to specific safety outcomes. It should be noted that both European and Australian legal aspects are investigated and considered, as both equally apply to many machinery exporters. A detailed description of the research design and methods can be found in an appendix. Overall, the unique combination of quantitative safety performance data and qualitative analysis of safety behaviours form a valuable addition to the understanding of machinery safety. The author must be congratulated on making these complex relationships transparent to the reader through her meticulous inquiry.
Resumo:
The aim of this paper is to analyse vulnerability and robustness of small and medium size enterprises (SMEs) supply chains and to consider contextual factors that might influence the success of their disturbance management: Risky product and business environment. By using an exploratory case study it is shown how these contextual factors attribute vulnerability sources, contribute to the robustness of a company’s performance and supply chain vulnerability, as well as how a company seeks to manage internal and external vulnerability sources. The exploratory case is based on a fresh food supply chain of a manufacturing SME operating in a developing market.
Case findings suggest that fresh food supply chains of a manufacturing SME in developing markets are prone to disruptions of their logistics and production processes due to ‘riskiness’ of fresh food products, the ‘riskiness’ of developing markets, as well as ‘riskiness’ of SMEs themselves. However, this does not necessarily indicate the vulnerability of an SME and its entire supply chain. Findings indicate that SMEs can be very successful in disturbance management by selective use of redesign strategies that aim to prevent or reduce the impact of disturbances. More precise, it is likely that an SME can achieve robust performance by employing preventive redesign strategies in managing disturbances that result from internal, company related vulnerability sources, while impact reduction strategies are likely to contribute to robust performance of an SME if used to manage disturbances that result from internal, supply chain related vulnerability sources, as well as external vulnerability sources.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.
Resumo:
This paper analyses the Portuguese stock market since it reopened in 1977, with a special focus on the evolution of the statistic and stochastic characteristics of the market return throughout this 36 year period. The market return for the period of time between 1977 and 2012 (September 28th) is estimated and then compared with the return that would have been achieved with Government bonds and treasury bills, which allows us to confirm that the hierarchy of return / risk across the different financial instruments is verified. The market risk premium for this 36 year period is also estimated and a comparison with other markets is performed, suggesting that the Portuguese market’s risk has not been compensated by an adequate return. The study also examines the evolution of the Portuguese market’s volatility in the 1977-2012 period and compares it with other markets, showing the existence of extremely high peaks during the first 11 years, but indicating a downwards trend throughout the whole period under analysis. Finally, the correlation between market returns for Portugal and for other countries and the degree of integration are estimated and their evolution throughout time is assessed, leading to the conclusion that the performance of the Portuguese stock market has become increasingly correlated with major European markets – correlation with some markets close to 0.70 from 2000 onwards-, but that country-specific risk factors are still relevant.
Resumo:
Literature suggests that CEOs of technology firms earn higher pay than CEOs of non-technology firms. I investigate whether compensation risk explains the difference in compensation between technology firms and non-technology firms. Controlling for firm size and performance, I find that CEOs in technology firms have higher pay, but also have much higher compensation risk compared to non-technology firms. Compensation risk explains the major part of the difference in CEO pay. My study is consistent with the labor market economics view that CEOs earn competitive risk-adjusted total compensation.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.
Resumo:
Objective: To assess the effectiveness of absolute risk, relative risk, and number needed to harm formats for medicine side effects, with and without the provision of baseline risk information. Methods: A two factor, risk increase format (relative, absolute and NNH) x baseline (present/absent) between participants design was used. A sample of 268 women was given a scenario about increase in side effect risk with third generation oral contraceptives, and were required to answer written questions to assess their understanding, satisfaction, and likelihood of continuing to take the drug. Results: Provision of baseline information significantly improved risk estimates and increased satisfaction, although the estimates were still considerably higher than the actual risk. No differences between presentation formats were observed when baseline information was presented. Without baseline information, absolute risk led to the most accurate performance. Conclusion: The findings support the importance of informing people about baseline level of risk when describing risk increases. In contrast, they offer no support for using number needed to harm. Practice implications: Health professionals should provide baseline risk information when presenting information about risk increases or decreases. More research is needed before numbers needed to harm (or treat) should be given to members of the general populations. (c) 2005 Elsevier Ireland Ltd. All rights reserved.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
The “case for real estate” in the mixed-asset portfolio is a topic of continuing interest to practitioners and academics. The argument is typically made by comparing efficient frontiers of portfolio with real estate to those that exclude real estate. However, most investors will have held inefficient portfolios. Thus, when analysing the real estate’s place in the mixed-asset portfolio it seems illogical to do so by comparing the difference in risk-adjusted performance between efficient portfolios, which few if any investor would have held. The approach adopted here, therefore, is to compare the risk-adjusted performance of a number of mixed-asset portfolios without real estate (which may or not be efficient) with a very large number of mixed-asset portfolios that include real estate (which again may or may not be efficient), to see the proportion of the time when there is an increase in risk-adjusted performance, significant or otherwise using appraisal-based and de-smoothed annual data from 1952-2003. So to the question how often does the addition of private real estate lead to increases the risk-adjusted performance compared with mixed-asset portfolios without real estate the answer is almost all the time. However, significant increases are harder to find. Additionally, a significant increase in risk-adjusted performance can come from either reductions in portfolio risk or increases in return depending on the investors’ initial portfolio structure. In other words, simply adding real estate to a mixed-asset portfolio is not enough to ensure significant increases in performance as the results are dependent on the percentage added and the proper reallocation of the initial portfolio mix in the expanded portfolio.
Towards an integrated script for risk and value management: insights from the dramaturgical metaphor
Resumo:
It is contended that the current conceptual distinction between risk management and value management is unsustainable. The origins of the two traditions are reviewed and critiqued from a postmodernist perspective. It is concluded that they differ primarily in terms of their rhetoric, rather than their substantive content. Insights into the current practice of risk and value management are provided by considering their enactment in terms of ‘performance’. The scripts for such performances are seen to be provided by the accepted methodologies which determine the language to be used and the roles to be acted out. A coherent integrated script for risk and value management can be provided by the methodology known as strategic choice, which replaces the language of ‘risk’ and ‘value’ with that of ‘uncertainty’. The benefits of adopting this alternative script are illustrated through six case studies.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
CONTEXTO E OBJETIVO: Crianças e adolescentes que vivem em situação de vulnerabilidade social apresentam uma série de problemas de saúde. Apesar disso, ainda é controversa a afirmação sobre a existência de alterações cognitivas e/ou sensoriais. O objetivo deste estudo foi investigar aspectos relacionados ao processamento auditivo, através da aplicação de testes de potencial evocado auditivo de tronco encefálico (PEATE) e avaliação comportamental do processamento auditivo em crianças em situação de rua, comparando a um grupo controle. TIPO DE ESTUDO E LOCAL: Estudo transversal no Laboratório de Processamento Auditivo, Faculdade de Medicina da Universidade de São Paulo. MÉTODOS: Os testes de processamento auditivo foram aplicados em um grupo de 27 indivíduos, subdivididos em grupos de 11 crianças (7 a 10 anos) e 16 adolescentes (11 a 16 anos) de ambos os sexos, em situação de vulnerabilidade social, e comparado a um grupo controle, formado por 21 crianças, subdivididas em grupos de 10 crianças e 11 adolescentes, pareados por idade, sem queixas. Também se aplicou os PEATE para investigação da integridade da via auditiva. RESULTADOS: Para ambas as faixas etárias, foram encontradas diferenças significantes entre grupos estudo e controle para a maioria dos testes aplicados, sendo que o grupo estudo apresentou desempenho estatisticamente pior do que o controle para todos os testes, exceto para o teste pediatric speech intelligibility. Apenas uma criança apresentou resultado alterado para os PEATE. CONCLUSÕES: Os resultados demonstraram pior desempenho do grupo estudo (crianças e adolescentes) para os testes comportamentais de processamento auditivo, apesar de estes apresentarem integridade da via auditiva em nível de tronco encefálico, demonstrada pela normalidade nos resultados do PEATE.
Resumo:
Abstract Background The present article briefly reviews the weight loss processes in combat sports. We aimed to discuss the most relevant aspects of rapid weight loss (RWL) in combat sports. Methods This review was performed in the databases MedLine, Lilacs, PubMed and SciELO, and organized into sub-topics: (1) prevalence, magnitude and procedures, (2) psychological, physiological and performance effects, (3) possible strategies to avoid decreased performance (4) organizational strategies to avoid such practices. Results There was a high prevalence (50%) of RWL, regardless the specific combat discipline. Methods used are harmful to performance and health, such as laxatives, diuretics, use of plastic or rubber suits, and sauna. RWL affects physical and cognitive capacities, and may increase the risk of death. Conclusion Recommendations during different training phases, educational and organizational approaches are presented to deal with or to avoid RWL.
Resumo:
CONTEXT AND OBJECTIVE: Children and adolescents who live in situations of social vulnerability present a series of health problems. Nonetheless, affirmations that sensory and cognitive abnormalities are present are a matter of controversy. The aim of this study was to investigate aspects to auditory processing, through applying the brainstem auditory evoked potential (BAEP) and behavioral auditory processing tests to children living on the streets, and comparison with a control group. DESIGN AND SETTING: Cross-sectional study in the Laboratory of Auditory Processing, School of Medicine, Universidade de São Paulo. METHODS: The auditory processing tests were applied to a group of 27 individuals, subdivided into 11 children (7 to 10 years old) and 16 adolescents (11 to 16 years old), of both sexes, in situations of social vulnerability, compared with an age-matched control group of 10 children and 11 adolescents without complaints. The BAEP test was also applied to investigate the integrity of the auditory pathway. RESULTS: For both children and adolescents, there were significant differences between the study and control groups in most of the tests applied, with significantly worse performance in the study group, except in the pediatric speech intelligibility test. Only one child had an abnormal result in the BAEP test. CONCLUSIONS: The results showed that the study group (children and adolescents) presented poor performance in the behavioral auditory processing tests, despite their unaltered auditory brainstem pathways, as shown by their normal results in the BAEP test.