986 resultados para Property Damage.
Resumo:
An earlier study by the Asian Development Bank (ADB) showed that the annual cost of road traffic accidents in 2001 was S$699.36 million which was 0.5% of the annual GDP. This paper attempts to update of the cost estimates of road traffic accidents. More precise methods of computing the human cost, lost output and property damage are adopted which grew in an annual cost of S$610.3 million or 0.338% of the annual GDP in 2003. A more conservative estimate of S$878,000 for fatal accident is also obtained, compared to the earlier figure of S$1.4 million. This study has shown that it is necessary to update the annual traffic accident costs regularly, as the figures vary with the number of accidents which change with time.
Resumo:
Despite a considerable amount of research on traffic injury severities, relatively little is known about the factors influencing traffic injury severity in developing countries, and in particular in Bangladesh. Road traffic crashes are a common headline in daily newspapers of Bangladesh. It has also recorded one of the highest road fatality rates in the world. This research identifies significant factors contributing to traffic injury severity in Dhaka – a mega city and capital of Bangladesh. Road traffic crash data of 5 years from 2007 to 2011 were collected from the Dhaka Metropolitan Police (DMP), which included about 2714 traffic crashes. The severity level of these crashes was documented in a 4-point ordinal scale: no injury (property damage), minor injury, severe injury, and death. An ordered Probit regression model has been estimated to identify factors contributing to injury severities. Results show that night time influence is associated with a higher level injury severity as is for individuals involved in single vehicle crashes. Crashes on highway sections within the city are found to be more injurious than crashes along the arterial and feeder roads. There is a lower likelihood of injury severity, however, if the road sections are monitored and enforced by the traffic police. The likelihood of injuries is lower on two-way traffic arrangements than one-way, and at four-legged intersections and roundabouts compare to road segments. The findings are compared with those from developed countries and the implications of this research are discussed in terms of policy settings for developing countries.
Resumo:
This paper explores the similarities and differences between bicycle and motorcycle crashes with other motor vehicles. If similar treatments can be effective for both bicycle and motorcycle crashes, then greater benefits in terms crash costs saved may be possible for the same investment in treatments. To reduce the biases associated with under-reporting of these crashes to police, property damage and minor injury crashes were excluded. The most common crash type for both bicycles (31.1%) and motorcycles (24.5%) was intersection from adjacent approaches. Drivers of other vehicles were coded most at fault in the majority of two-unit bicycle (57.0%) and motorcycle crashes (62.7%). The crash types, patterns of fault and factors affecting fault were generally similar for bicycle and motorcycle crashes. This confirms the need to combat the factors contributing to failure of other drivers to yield right of way to two-wheelers, and suggest that some of these actions should prove beneficial to the safety of both motorized and non-motorized two-wheelers. In contrast, child bicyclists were more often at fault, particularly in crashes involving a vehicle leaving the driveway or footpath. The greater reporting of violations by riders and drivers in motorcycle crashes also deserves further investigation.
Resumo:
Case note Apache Energy Ltd v Alcoa of Australia Ltd (No 2) [2013] In 2011, headlines were made when Alcoa sued Apache Energy and its partners for $158 million, a loss it claimed was a consequence of Apache Energy failing to adequately inspect and maintain the gas pipelines that supplied the gas used by Alcoa in its business. As the loss was not a consequence of any property damage or injury to Alcoa, the loss is characterised as pure economic loss...
Resumo:
This research identifies roadway, traffic, and environmental factors that influence the injury severity of road traffic crashes in Dhaka. Dhaka provides a rather unusual driving risk environment to study, since virtually anyone can obtain a drivers’ license and very little traffic enforcement and fines are given when drivers violate traffic rules. To examine this city with presumed heightened crash severity risk, police reported crash data from 2007 to 2011 containing about 2714 road traffic crashes were collected. The injury severity of traffic crashes—recorded as either fatal, serious injury, or property damage only—were modeled using an ordered Probit model. Significant factors increasing the probability of fatal injuries include crashes along highways (65%), absence of a road divider (80%), crashes during night time (54%), and vehicle-pedestrian collisions (367%); whereas two-way traffic configuration (21%), and traffic police controlled schemes (41%) decrease the probability of fatalities. Both similarities and differences of the findings between crash risk in Dhaka and developed countries are discussed in policy relevant terms.
Resumo:
This paper develops a model of short-range ballistic missile defense and uses it to study the performance of Israel’s Iron Dome system. The deterministic base model allows for inaccurate missiles, unsuccessful interceptions, and civil defense. Model enhancements consider the trade-offs in attacking the interception system, the difficulties faced by militants in assembling large salvos, and the effects of imperfect missile classification by the defender. A stochastic model is also developed. Analysis shows that system performance can be highly sensitive to the missile salvo size, and that systems with higher interception rates are more “fragile” when overloaded. The model is calibrated using publically available data about Iron Dome’s use during Operation Pillar of Defense in November 2012. If the systems performed as claimed, they saved Israel an estimated 1778 casualties and $80 million in property damage, and thereby made preemptive strikes on Gaza about 8 times less valuable to Israel. Gaza militants could have inflicted far more damage by grouping their rockets into large salvos, but this may have been difficult given Israel’s suppression efforts. Counter-battery fire by the militants is unlikely to be worthwhile unless they can obtain much more accurate missiles.
Resumo:
The city of Guaratinguetá, SP, presents in its history, several instances of property damage and human losses, conditional on the event of flooding and mass movement of soil, resulting from the development of erosion processes. The extent and severity of these events that affect humans and their properties is the result of the illegal occupation of these areas as potential geohazard. Thus, it is of great importance to physical characterization and identification of such areas within the map of the same city as a way to minimize the effects and mitigate the consequences of these events. Thus, this graduate report presents a series of field campaigns, geotechnical laboratory testing, consultation with maps and satellite images, representative of the physical environment, and the city plan as a means conclusive for the delimitation of risk areas with potential for occurrence of erosion and / or flooding on the map representing the urban area of Guaratinguetá, SP. Also featured are the descriptions of the main characteristics of those areas identified as being at risk, along with proposals to avoid or minimize the impact of problems related to flooding and erosion processes on the local population
Resumo:
Slope failure occurs in many areas throughout the world and it becomes an important problem when it interferes with human activity, in which disasters provoke loss of life and property damage. In this research we investigate the slope failure through the centrifuge modeling, where a reduced-scale model, N times smaller than the full-scale (prototype), is used whereas the acceleration is increased by N times (compared with the gravity acceleration) to preserve the stress and the strain behavior. The aims of this research “Centrifuge modeling of sandy slopes” are in extreme synthesis: 1) test the reliability of the centrifuge modeling as a tool to investigate the behavior of a sandy slope failure; 2) understand how the failure mechanism is affected by changing the slope angle and obtain useful information for the design. In order to achieve this scope we arranged the work as follows: Chapter one: centrifuge modeling of slope failure. In this chapter we provide a general view about the context in which we are working on. Basically we explain what is a slope failure, how it happens and which are the tools available to investigate this phenomenon. Afterwards we introduce the technology used to study this topic, that is the geotechnical centrifuge. Chapter two: testing apparatus. In the first section of this chapter we describe all the procedures and facilities used to perform a test in the centrifuge. Then we explain the characteristics of the soil (Nevada sand), like the dry unit weight, water content, relative density, and its strength parameters (c,φ), which have been calculated in laboratory through the triaxial test. Chapter three: centrifuge tests. In this part of the document are presented all the results from the tests done in centrifuge. When we talk about results we refer to the acceleration at failure for each model tested and its failure surface. In our case study we tested models with the same soil and geometric characteristics but different angles. The angles tested in this research were: 60°, 75° and 90°. Chapter four: slope stability analysis. We introduce the features and the concept of the software: ReSSA (2.0). This software allows us to calculate the theoretical failure surfaces of the prototypes. Then we show in this section the comparisons between the experimental failure surfaces of the prototype, traced in the laboratory, and the one calculated by the software. Chapter five: conclusion. The conclusion of the research presents the results obtained in relation to the two main aims, mentioned above.
Resumo:
Over the last decades the impact of natural disasters to the global environment is becoming more and more severe. The number of disasters has dramatically increased, as well as the cost to the global economy and the number of people affected. Among the natural disaster, flood catastrophes are considered to be the most costly, devastating, broad extent and frequent, because of the tremendous fatalities, injuries, property damage, economic and social disruption they cause to the humankind. In the last thirty years, the World has suffered from severe flooding and the huge impact of floods has caused hundreds of thousands of deaths, destruction of infrastructures, disruption of economic activity and the loss of property for worth billions of dollars. In this context, satellite remote sensing, along with Geographic Information Systems (GIS), has become a key tool in flood risk management analysis. Remote sensing for supporting various aspects of flood risk management was investigated in the present thesis. In particular, the research focused on the use of satellite images for flood mapping and monitoring, damage assessment and risk assessment. The contribution of satellite remote sensing for the delineation of flood prone zones, the identification of damaged areas and the development of hazard maps was explored referring to selected cases of study.
Resumo:
Signs are used extensively in workplaces and on products to identify hazards and provide instructions for appropriate behavior. A fundamental element of these signs is the signal-word panel located at the top of the sign. The colors and words in this panel are intended to convey information about the hazard identified. One type of hazard information concerns the severity of injury/illness associated with the hazard. The standard of the American National Standards Institute (ANSI) for facility signs uses three severity categories: 1) death or serious injury, 2) minor or moderate injury, and 3) property damage. The standard specifies which signal-word panel format, including color, to use based in part on the severity category. The purpose of this study was to determine if college students associate color with severity. The sample population consisted of 59 students tested in nine small groups. Twelve signs were shown to them in random order. Five of the signs had a color for the background of the signal-word panel. The colors were red, orange, yellow, blue, and gray. The signal word was a nonsense word and the text panel contained repetitions of the letter x in sentence format. Subject rated their impressions of the colors using two ordered rating scales for severity. Results indicated that color had a highly significant effect on severity ratings. Median ratings were generally consistent with the ANSI standard, except for orange. Red rated highest on both scales. Blue and gray rated lowest. Yellow and orange were in between red and blue. According to the ANSI standard, orange should indicate the same severity as red. These results indicated that orange was associated with less severity than red. Apparently, the ANSI standard's use of orange to identify a hazard associated with death or a serious injury is questionable.
Resumo:
RESUMEN Su objetivo esencial: Regular el proceso de la edificación, está basado en 3 grandes pilares: 1.- Completar la configuración legal de los agentes que intervienen en el mismo, fijando sus obligaciones para así establecer las responsabilidades. 2.- Fomentar la calidad de los edificios. 3.- Fijar las garantías a los usuarios frente a los posibles daños. Estos tres fundamentos están intensamente relacionados, ya que, las obligaciones y responsabilidades de los agentes son la base de la constitución de las garantías a los usuarios, definidas mediante los requisitos básicos que deben satisfacer los edificios. Partiendo del análisis cualitativo y cuantitativo del grado de cumplimiento del objetivo de la nueva Ley, elaborado a través del estudio de sus tres pilares fundamentales, proponemos medidas tendentes a la plena entrada en vigor de la misma. Para ello se deberá desarrollar el Real Decreto previsto en la Disposición Adicional 2ª, una vez conseguido el grado de madurez de los sectores de la edificación y del seguro. En todo este proceso de estudio hemos podido apreciar que la objetiva identificación de los daños y en especial los que afectan la estabilidad del edificio, constituye una herramienta fundamental para la correcta atribución de responsabilidades a los agentes, basada en la aplicación de los tres grados de responsabilidad “ex lege” por daños materiales y sus plazos de prescripción surgidos del nuevo régimen impuesto por el art. 17 LOE Para avalar esta propuesta hemos analizado: 1.- El entorno económico, general y pormenorizado al sector de la edificación, en Europa y España durante el período comprendido entre los años 1990 y 2013, años previos y posteriores a la entrada en vigor de la Ley, dada la influencia de los ciclos de actividad producidos en la regulación del sector, las responsabilidades atribuidas a los agentes, el fomento de la calidad y las garantías ofrecidas a los adquirentes. 2.- Las diversas legislaciones sobre responsabilidades y garantías de los agentes de la edificación en los países de nuestro entorno económico. 3.- La gestación de la LOE, incidiendo en la evolución de los últimos borradores y su tramitación parlamentaria. 4.- El desarrollo doctrinal de la Transición desde el régimen de responsabilidades, fijado por el art. 1591 de Código Civil, y su Jurisprudencia, hacia el nuevo régimen de responsabilidades establecido por el art. 17 LOE. En esta tarea además de apreciar la asimilación, por parte de los Jueces y Magistrados, de los principios doctrinales de la LOE, hemos observado la labor de los peritos, de cuya experta identificación de las causas de los daños depende la justa y eficaz atribución de responsabilidades. 5 -. El grado de eficacia de la LOE a la vista de la estadística siniestral, de la que ya hay datos consolidados, tras la cancelación de casi 15.000 expedientes de reclamación a Arquitectos. 6 -. También hemos estudiado el grado de cumplimiento con el usuario y propietario de las garantías previstas en el art. 19 de la Ley y en la D.A. 1ª, los efectos reales alcanzados y las tareas pendientes por delante. Analizando la atribución de responsabilidades a los agentes de la edificación, dentro del primer pilar fundamental de la LOE, hemos estudiado las actuaciones de los peritos expertos y su incidencia en este objetivo, previa selección de casos de gran interés y dificultad. Fruto de ello se han formulado propuestas tendentes a la especialización de este colectivo, evitando conductas “irregulares” que tanto daño provocan a los agentes reclamados como a los propietarios afectados. Este daño es evidente pudiendo ocasionar condenas injustas, enriquecimientos ilícitos o bien falsas expectativas de satisfacción de daños mal dictaminados y costosas e ineficaces reparaciones. De cara a la consecución del pilar de la calidad de la edificación, mediante los requisitos básicos planteados por la LOE y desarrollados por el Código Técnico de la Edificación (Real Decreto 314/2006, de 17 de marzo), hemos procesado datos de expedientes de reclamaciones por daños que afectan a edificios ejecutados bajo el nuevo régimen LOE. Con esta base se han analizado las causas generadoras de las diversas lesiones y su frecuencia para que de este análisis puedan establecerse pautas de actuación para su prevención. Finalmente, tras demostrar que las garantías obligatorias impuestas por la LOE sólo abarcan un pequeño porcentaje de los posibles daños a la edificación, insistimos en la necesidad de la plena eficacia de la Ley mediante la aprobación de todas las garantías previstas y para todo tipo de edificaciones. En suma, se ha diseñado la tesis como una matriz abierta en la que podremos continuar incorporando datos de la evolución de la doctrina, la jurisprudencia y la estadística de los daños en la edificación. ABSTRACT The approval of Law 38/1999 on November 5, 1999, (Official Gazette BOE 266/1999 of 11.6.1999, p. 38925), was the culmination of a long period of over 20 years of gestation for which deep agreements were needed between all stakeholders affected. Although several parliamentary groups denounced its incomplete approval, regarding mandatory guarantees to the purchaser, its enactment caused general satisfaction among most of the the building agents. This assessment remains after fourteen years since its partial enactment. Its essential purpose, “to regulate the building process”, is based on 3 pillars: 1.- To complete the legal configuration of the agents involved in it, setting their obligations in order to establish their responsibilities. 2.- To promote the buildings quality. 3.- To specify users´guarantees against possible buildings damage. These three issues are strongly related, since the obligations and responsibilities of the actors are the basis of the users’guarantees constitution, defined by the basic performance required by buildings. Based on the qualitative and quantitative analysis of the fulfillment of the new law’s objectives, made by monitoring the three pillars, we propose measures to the full enactment of this Directive, by the development of the Royal Decree, provided in its Second Additional Provision, once maturity in the sectors of the building and insurance is achieved. Throughout this process of study we have seen that the skill identification of damage, particularly those affecting the stability of the building, is an essential tool for the proper allocation of responsibilities of the new regime installed by the art. 17 LOE, based on the application of the three degrees of responsibility "ex lege" for property damage and limitation periods. To support this proposal, we have analyzed: 1.- The evolution of the building sector in Europe and Spain during the years before and after the enactment of the Law, due to the influence of cycles of activity produced in industry regulation, the responsibilities attributed to agents, promotion of the quality and the assurances given to acquirers. 2.- The scope of various laws on liability and building agents warranties in the countries of our economic environment. 3.- The long period of LOE generation, focusing on the developments in recent drafts and parliamentary procedure. 4.- The doctrinal development in the Transition from the regime of responsibilities, set by art. 1591 of the Civil Code, and its Jurisprudence, to the new liability regime established by art. 17 LOE. In this task, while we have noted assimilation by the Judges and Magistrates of the doctrinal principles of the LOE, we have also analyzed the work of experts, whose skilled identification of the damage causes helps the fair and efficient allocation of responsibilities. 5 - The effectiveness of the LOE based on knowledge of the siniestral statistics, which are already consolidated data, after the cancellation of nearly 15,000 claims to Architects. 6.- We have also studied the degree of compliance with the user and owner guarantees, established in art. 19 and the D.A. 1th of the LOE, exposing the real effects achieved and the pending tasks ahead. Analyzing the allocation of the building agents´ responsibilities, within the first cornerstone of the LOE, we have studied the expert witnesses actions and their impact on this duty, selecting cases of great interest and difficulty in this aim. The result of this enterprise has been to propose the specialization of this group, avoiding "irregular" behaviors that create as much damage as the agents claimed to affected owners. This damage is evident and can cause wrong convictions, illicit enrichment, false expectations and inefficient and costly damage repairs. In order to achieve the pillar of building quality through the basic requirements set by the LOE and developed by the Technical Building Code (Royal Decree 314/ 2006 of 17 March), we have analyzed records of damage claims involving buildings executed under the new regime LOE. On this basis we have analyzed the root causes of various damages and their frequency, from these data it will be easy to propose lines of action for prevention. Finally, after demonstrating that mandatory warranties imposed by LOE cover only a small percentage of the potential building damage, we emphasize the need for the full effectiveness of the Law by the obligation all the guarantees provided in the art. 19 LOE, and for all types of buildings. In conclusion, this thesis is designed as an open matrix in which we will continue including data on the evolution of the doctrine, jurisprudence and the statistics of the damage to the building.
Resumo:
Federal Highway Administration, Washington, D.C.
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Mode of access: Internet.
Resumo:
Both systems were designed and developed by NHTSA's National Center for Statistics and Analysis (NCSA) to provide an overall measure of highway safety, to help identify traffic safety problems, to suggest solutions, and to help provide an objective basis on which to evaluate the effectiveness of motor vehicle safety standards and highway safety initiatives. Data from these systems are used to answer requests for information from the international and national highway traffic safety communities, including state and local governments, the Congress, Federal agencies, research organizations, industry, the media, and private citizens.