987 resultados para Program maintenance
Resumo:
We examined the effect of recombinant human growth hormone (rhGH) and/or recombinant human insulin-like growth factor-I (rhIGF-I) on regional fat loss in postmenopausal women undergoing a weight loss regimen of diet plus exercise. Twenty-seven women aged 59-79 years, 20-40% above ideal body weight, completed a 12-week program consisting of resistance training 2 days/week and walking 3 days/week, while consuming a diet that was 500 kcal/day less than that required for weight maintenance, Participants were randomly assigned in a double-blind fashion to receive rhGH (0.025 mg/kg BW/day: n=7), rhIGF-I (0.015 mg/kg BW/day: n=7), rhGH + rhIGF-I (n = 6), or placebo (PL: n = 7). Regional and whole body fat mass were determined by dual X-ray absorptiometry. Body fat distribution was assessed by the ratios of trunk fat-to-limb fat (TrF/LimbF) and trunk fat-to-total fat (TrF/TotF), Limb and trunk fat decreased in all groups (p < 0.01). For both ratios of fat distribution, the rhGH treated group experienced an enhanced loss of truncal compared to peripheral fat (p less than or equal to 0.01), with no significant change for those administered rhIGF-I or FL. There was no association between change in fat distribution and indices of cardiovascular disease risk as determined by serum lipid/lipoprotein levels and maximal aerobic capacity. These results suggest that administration of rhGH facilitates a decrease in central compared to peripheral fat in older women undertaking a weight loss program that combines exercise and moderate caloric restriction, although no beneficial effects are conferred to lipid/lipoprotein profiles, Further, the effect of rhGH is not enhanced by combining rhCH with rhIGF-I administration. In addition, rhIGF-I does not augment the loss of trunk fat when administered alone.
Resumo:
Opioid dependence is a chronic, relapsing condition that is associated with significant morbidity and mortality. Methadone maintenance therapy involves the provision of a controlled supply of an orally administered opioid, thereby stabilising the opioid-dependent patient. Research studies have shown that methadone maintenance reduces illicit opioid use, opioid-related crime, premature mortality and the risk of HIV infection. It is most effective when prescribed at an adequate dosage (usually 60 to 100 mg/day) and when long term maintenance on methadone is the goal of treatment rather than detoxification from all drugs including methadone. Successful long term methadone maintenance is more likely when it takes place within the context of a well established therapeutic relationship and when the medical, social and psychological needs of patients are met either through direct assistance or referral.
Resumo:
Program slicing is a well known family of techniques used to identify code fragments which depend on or are depended upon specific program entities. They are particularly useful in the areas of reverse engineering, program understanding, testing and software maintenance. Most slicing methods, usually oriented towards the imperative or object paradigms, are based on some sort of graph structure representing program dependencies. Slicing techniques amount, therefore, to (sophisticated) graph transversal algorithms. This paper proposes a completely different approach to the slicing problem for functional programs. Instead of extracting program information to build an underlying dependencies’ structure, we resort to standard program calculation strategies, based on the so-called Bird-Meertens formalism. The slicing criterion is specified either as a projection or a hiding function which, once composed with the original program, leads to the identification of the intended slice. Going through a number of examples, the paper suggests this approach may be an interesting, even if not completely general, alternative to slicing functional programs
Resumo:
In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.
Resumo:
The scope and coverage of the Brazilian Immunization Program can be compared with those in developed countries because it provides a large number of vaccines and has a considerable coverage. The increasing complexity of the program brings challenges regarding its development, high coverage levels, access equality, and safety. The Immunization Information System, with nominal data, is an innovative tool that can more accurately monitor these indicators and allows the evaluation of the impact of new vaccination strategies. The main difficulties for such a system are in its implementation process, training of professionals, mastering its use, its constant maintenance needs and ensuring the information contained remain confidential. Therefore, encouraging the development of this tool should be part of public health policies and should also be involved in the three spheres of government as well as the public and private vaccination services.
Resumo:
With some 30,000 dependent persons, opiate addiction constitutes a major public health problem in Switzerland. The Swiss Federal Office of Public Health (FOPH) has long played a leading role in the prevention and treatment of opiate addiction and in research on effective means of containing the epidemic of opiate addiction and its consequences. Major milestones on that path have been the successive "Methadone reports" published by that Office and providing guidance on the care of opiate addiction with substitution treatment. In view of updating the recommendations for the appropriateness of substitution treatment for opiate addiction, in particular for the prescription of methadone, the FOPH commissioned a multi-component project involving the following elements. A survey of current attitudes and practices in Switzerland related to opiate substitution treatment Review of Swiss literature on methadone substitution treatment Review of international literature on methadone substitution treatment National Methadone Substitution Conference Multidisciplinary expert panel to evaluate the appropriateness of substitution treatment. The present report documents the process and summarises the results of the latter element above. The RAND appropriateness method (RAM) was used to distil from literature-based evidence and systematically formulated expert opinion, areas where consensus exist on the appropriateness (or inappropriateness) of methadone maintenance treatment (MMT) and areas where disagreement or uncertainty persist and which should be further pursued. The major areas which were addressed by this report are Initial assessment of candidates for MMT Appropriate settings for initiation of MMT (general and special cases) Appropriateness of methadone supportive therapy Co-treatments and accompanying measures Dosage schedules and pharmacokinetic testing Withdrawal from MMT Miscellaneous questions Appropriateness of other (non-methadone) substitution treatment Summary statements for each of the above categories are derived from the panel meeting and presented in the report. In the "first round", agreement was observed for 31% of the 553 theoretical scenarios evaluated. The "second round" rating, following discussion of divergent ratings, resulted in a much higher agreement among panellists, reaching 53% of the 537 scenarios. Frank disagreement was encountered for 7% of all scenarios. Overall 49% of the clinical situations (scenarios) presented were considered appropriate. The areas where at least 50% of the situations were considered appropriate were "initial assessment of candidates for MMT", the "appropriate settings for initiation of MMT", the "appropriate settings for methadone supportive treatment" and "Appropriateness of other (non-methadone) substitution treatment". The area where there was the least consensus on appropriateness concerned "appropriateness of withdrawal from MMT" (6%). The report discusses the implications and limitations of the panel results and provides recommendations for the dissemination, application, and future use of the criteria for the appropriateness of MMT. The RAND Appropriateness Method proved to be an accepted and appreciated method to assess the appropriateness of methadone maintenance treatment for opiate addicts. In the next step, the results of the expert panel process must now be combined with those of the Swiss and international literature reviews and the survey of current attitudes and practices in Switzerland, to be synthesized into formal practice guidelines. Such guidelines should be disseminated to all concerned, promoted, used and rigorously evaluated for compliance and outcome.
Resumo:
Chagas disease is caused by Trypanosoma cruzi, which is mainly transmitted by the faeces of triatomine insects that find favourable environments in poorly constructed houses. Previous studies have documented persistent triatomine infestation in houses in the province of Loja in southern Ecuador despite repeated insecticide and educational interventions. We aim to develop a sustainable strategy for the interruption of Chagas disease transmission by promoting living environments that are designed to prevent colonisation of rural houses by triatomines. This study used positive deviance to inform the design of an anti-triatomine prototype house by identifying knowledge, attitudes and practices used by families that have remained triatomine-free (2010-2012). Positive deviants reported practices that included maintenance of structural elements of the house, fumigation of dwellings and animal shelters, sweeping with "insect repellent" plants and relocation of domestic animals away from the house, among others. Participants favoured construction materials that do not drastically differ from those currently used (adobe walls and tile roofs). They also expressed their belief in a clear connection between a clean house and health. The family's economic dynamics affect space use and must be considered in the prototype's design. Overall, the results indicate a positive climate for the introduction of housing improvements as a protective measure against Chagas disease in this region.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
In order to promote the importance of our assets and to ensure continued and increasing funding for major maintenance and routine maintenance, in 2008 we intend to, annually update a list of facts relating to state buildings and the maintenance needs for those buildings. This information will support the case for increased and permanent funding
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
STUDY DESIGN: Randomized controlled trial with 1-year follow-up. OBJECTIVE: To analyze the effects of an exercise program or routine follow-up on patients with chronic low back pain who have completed functional multidisciplinary rehabilitation. The short- and long-term outcome in terms of symptoms and physical and social functioning was compared. SUMMARY OF BACKGROUND DATA: Systematic reviews have shown that functional multidisciplinary rehabilitation improves physical function and reduces pain in patients with chronic low back pain. However, long-term maintenance of these improvements is inconsistent and the role of exercise in achieving this goal is unclear. METHODS: One hundred five chronic patients with low back pain who had completed a 3-week functional multidisciplinary rehabilitation program were randomized to either a 3-month exercise program (n = 56) or routine follow-up (n = 49). The exercise program consisted of 24 training sessions during 12 weeks. Patients underwent evaluations of trunk muscle endurance, cardiovascular endurance, lumbar spine mobility (flexion and extension range-of-motion, fingertip-to-floor distance), pain and perceived functional ability at the beginning and the end of functional multidisciplinary rehabilitation, at the end of the exercise program (3 months) and at 1-year follow-up. Disability was also assessed at the same time points except at the beginning of functional multidisciplinary rehabilitation. RESULTS: At the end of the functional multidisciplinary rehabilitation, both groups improved significantly in all physical parameters except flexion and extension range-of-motion. At the 3 month and 1 year follow-up, both groups maintained improvements in all parameters except for cardiovascular endurance. Only the exercise program group improved in disability score and trunk muscle endurance. No differences between groups were found. CONCLUSION: A favorable long-term outcome was observed after functional multidisciplinary rehabilitation in both patient groups. Patients who participated in an exercise program obtained some additional benefits. The relevance of these benefits to overall health status need to be further investigated.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
In recent years there has been renewed interest in using preventive maintenance techniques to extend pavement life and to ensure low life cycle costs for our road infrastructure network. Thin maintenance surfaces can be an important part of a preventive maintenance program for asphalt cement concrete roads. The Iowa Highway Research Board has sponsored Phase Two of this research project to demonstrate the use of thin maintenance surfaces in Iowa and to develop guidelines for thin maintenance surface uses that are specific to Iowa. This report documents the results of test section construction and monitoring started in Phase One and continued in Phase Two. The report provides a recommended seal coat design process based on the McLeod method and guidance on seal coat aggregates and binders. An update on the use of local aggregates for micro-surfacing in Iowa is included. Winter maintenance guidelines for thin maintenance surfaces are reported herein. Finally, Phase One's interim, qualitative thin maintenance surface guidelines are supplemented with Phase two's revised, quantitative guidelines. When thin maintenance surfaces are properly selected and applied, they can improve the pavement surface condition index and the skid resistance of pavements. For success to occur, several requirements must be met, including proper material selection, design, application rate, workmanship, and material compatibility, as well as favorable weather during application and curing. Specific guidance and recommendations for many types of thin maintenance surfaces and conditions are included in the report.
Resumo:
Provides instructions for using the computer program which was developed under the research project, "The Economics of Reducing the County Road System: Three Case Studies In Iowa". This program operates on an IBP personal computer with 300K storage. A fixed disk is required with at least 3 megabytes of storage. The computer must be equipped with DOS version 3.0; the programs are written in Fortran. The user's manual describes all data requirements including network preparation, trip information, cost for maintenance, reconstruction, etc. Program operation instructions are presented, as well as sample solution output and a listing of the computer programs.