999 resultados para Pedestrian bridge


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A trip was undertaken to look at concerns of Public Works and Main Roads Departments of Queensland. David Paterson and Wayne Ganther from CSIRO travelled to the Sunshine Coast with Alan Carse of Queensland Department of Main Roads and Michael Ball of Queensland Department of Public Works. We were also joined for part of the visits by Ed Bowers of QBuild which is a commercial unit of Public Works responsible for maintenance of Public Works. During the trip we visited a bridge on the David Low Way at Sunrise Beach near Noosa. This bridge was in a serve marine environment with high salt content in the concrete and corrosion of the galvanised guardrails and barriers. Also the foreshore at Coolum was visited and the use of stainless steel was examined. This is discussed in this report. Most problems stemmed from incorrect specification due to lack of awareness of the severity of the environment. The companion report Visit to Schools Report 2002-059-B No 7. covers the visit to four schools north of Caloundra.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

n design of bridge structures, it is common to adopt a 100 year design life. However, analysis of a number of case study bridges in Australia has indicated that the actual design life can be significantly reduced due to premature deterioration resulting from exposure to aggressive environments. A closer analysis of the cost of rehabilitation of these structures has raised some interesting questions. What would be the real service life of a bridge exposed to certain aggressive environments? What is the strategy of conducting bridge rehabilitation? And what are the life cycle costs associated with rehabilitation? A research project funded by the CRC for Construction Innovation in Australia is aimed at addressing these issues. This paper presents a concept map for assisting decision makers to appropriately choose the best treatment for bridge rehabilitation affected by premature deterioration through exposure to aggressive environments in Australia. The decision analysis is referred to a whole of life cycle cost analysis by considering appropriate elements of bridge rehabilitation costs. In addition, the results of bridges inspections in Queensland are presented

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Model (BIM) software, collaboration platforms and 5D Construction Management software is now commercially available and presents the opportunity for construction project teams to design more cost effectively, plan construction earlier, manage costs throughout the life cycle of a building project and provide a central asset management register for facilities managers. This paper outlines the merits of taking a holistic view of ICT in curriculum design. The educational barriers to implementation of these models and planning tools are highlighted. Careful choice of computer software can make a significant difference to how quickly students can master skills; how easy it is to study and how much they enjoy learning and be prepared for employment. An argument for BIM and 5D planning tools to be introduced into the curriculum to assist industry increase productivity and efficiencies are outlined by the authors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Illegal pedestrian behaviour is common and is reported as a factor in many pedestrian crashes. Since walking is being promoted for its health and environmental benefits, minimisation of its associated risks is of interest. The risk associated with illegal road crossing is unclear, and better information would assist in setting a rationale for enforcement and priorities for public education. An observation survey of pedestrian behaviour was conducted at signalised intersections in the Brisbane CBD (Queensland, Australia) on typical workdays, using behavioural categories that were identifiable in police crash reports. The survey confirmed high levels of crossing against the lights, or close enough to the lights that they should legally have been used. Measures of exposure for crossing legally, against the lights, and close to the lights were generated by weighting the observation data. Relative risk ratios were calculated for these categories using crash data from the observation sites and adjacent midblocks. Crossing against the lights and crossing close to the lights both exhibited a crash risk per crossing event approximately eight times that of legal crossing at signalised intersections. The implications of these results for enforcement and education are discussed, along with the limitations of the study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When I arrived in Queensland's capital in 1996, Brisbane was commonly referred to as an 'overgrown country town'. This might have been an acceptable description in the 1990s, but it cannot be applied any longer. Brisbane, affectionaly referred to by the locals as Bris-Vegas, has now come of age. Following Sydney and Melbourne, Brisbane is the third most populous city in Australia with a population of approximately two million. Interestingly, the 2006 Census showed that 22 per cent of Brisbane's population was born overseas, the three main countries of birth being the UK, New Zealand and South Africa. Brisbane City is centred on its most dominant environmental element, the Brisbane River, which effectively carves Brisbane into two areas - the Northside and the Southside. The 2001 addition of Cox Rayner's Goodwill Pedestrian and Cycle Bridge signified Brisbane's acceptance and affectionate embrace of its River resulting in a long overdue linage between Brisbane's North and South. It connects the City's key precincts - the Northside CBD through Queensland University of Technology (QUT), across Brisbane River, to the recreational precinct of the Southside Southbank Parklands. The Southside cultural precinct of Southbank is the home to Queensland's Art Gallery, Performing Arts Complex, State Library and Museum -each of which were designed by Brisbane Stalwart Architect Robin Gibson, in the 1970s and '80s. The CBD component of the Brisbane River is flanked by a number of Institutional Facilities, including the campuses of QUT, Griffith University and the Southbank Education and Training Precinct (SETP), which combine to form a cross-river educational precinct. The past decade has born witness to a city which has keenly supported emerging architects in addition to the more entrenched stalwarts of the profession, resulting in a youthful, relaxed and unpretentious sub-tropical city. Viva Bris-Vegas!

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract: Purpose – Several major infrastructure projects in the Hong Kong Special Administrative Region (HKSAR) have been delivered by the build-operate-transfer (BOT) model since the 1960s. Although the benefits of using BOT have been reported abundantly in the contemporary literature, some BOT projects were less successful than the others. This paper aims to find out why this is so and to explore whether BOT is the best financing model to procure major infrastructure projects. Design/methodology/approach – The benefits of BOT will first be reviewed. Some completed BOT projects in Hong Kong will be examined to ascertain how far the perceived benefits of BOT have been materialized in these projects. A highly profiled project, the Hong Kong-Zhuhai-Macau Bridge, which has long been promoted by the governments of the People's Republic of China, Macau Special Administrative Region and the HKSAR that BOT is the preferred financing model, but suddenly reverted back to the traditional financing model to be funded primarily by the three governments with public money instead, will be studied to explore the true value of the BOT financial model. Findings – Six main reasons for this radical change are derived from the analysis: shorter take-off time for the project; difference in legal systems causing difficulties in drafting BOT agreements; more government control on tolls; private sector uninterested due to unattractive economic package; avoid allegation of collusion between business and the governments; and a comfortable financial reserve possessed by the host governments. Originality/value – The findings from this paper are believed to provide a better understanding to the real benefits of BOT and the governments' main decision criteria in delivering major infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Sydney Harbour Bridge provides an imaginative space that is revisited by Australian writers in particular ways. In this space novelists, poets, and cultural historians negotiate questions of emotional and psychological transformation as well as reflect on social and environmental change in the city of Sydney. The writerly tensions that mark these accounts often alter, or query, representations of the Bridge as a symbol of material progress and demonstrate a complex creative engagement with the Bridge. This discussion of ‘the Bridge’ focuses on the work of four authors, Eleanor Dark, P.R. Stephensen, Peter Carey and Vicki Hastrich and includes a range of other fictional and non-fictional accounts of ‘Bridge-writing.’ The ideas proffered are framed by a theorising of space, especially referencing the work of Michel de Certeau, whose writing on the spatial ambiguity of a bridge is important to the examination of the diverse ways in which Australian writers have engaged with the imaginative potential and almost mythic resonance of the Sydney Harbour Bridge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The attention paid by the British music press in 1976 to the release of The Saints first single “I’m Stranded” was the trigger for a commercial and academic interest in the Brisbane music scene which still has significant energy. In 2007, Brisbane was identifed by Billboard Magazine as a “hot spot” of independent music. A place to watch. Someone turned a torch on this town, had a quick look, moved on. But this town has always had music in it. Some of it made by me. So, I’m taking this connection of mine, and working it into a contextual historical analysis of the creative lives of Brisbane musicians. I will be interviewing a number of Brisbane musicians. These interviews have begun, and will continue to be be conducted in 2011/2012. I will ask questions and pursue memories that will encompass family, teenage years, siblings, the suburbs, the city, venues, television and radio; but then widen to welcome the river, the hills and mountains, foes and friends, beliefs and death. The wider research will be a contextual historical analysis of the creative lives of Brisbane musicians. It will explore the changing nature of their work practices over time and will consider the notion, among other factors, of ‘place’ in both their creative practice and their creative output. It will also examine how the presence of the practitioners and their work is seen to contribute to the cultural life of the city and the creative lives of its citizens into the future. This paper offers an analysis of this last notion: how does this city see its music-makers? In addition to the interviews, over 300 Brisbane musicians were surveyed in September 2009 as part of a QUT-initiated recorded music event (BIGJAM). Their responses will inform the production of this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A novel H-bridge multilevel PWM converter topology based on a series connection of a high voltage (HV) diode-clamped inverter and a low voltage (LV) conventional inverter is proposed. A DC link voltage arrangement for the new hybrid and asymmetric solution is presented to have a maximum number of output voltage levels by preserving the adjacent switching vectors between voltage levels. Hence, a fifteen-level hybrid converter can be attained with a minimum number of power components. A comparative study has been carried out to present high performance of the proposed configuration to approach a very low THD of voltage and current, which leads to the possible elimination of output filter. Regarding the proposed configuration, a new cascade inverter is verified by cascading an asymmetrical diode-clamped inverter, in which nineteen levels can be synthesized in output voltage with the same number of components. To balance the DC link capacitor voltages for the maximum output voltage resolution as well as synthesise asymmetrical DC link combination, a new Multi-output Boost (MOB) converter is utilised at the DC link voltage of a seven-level H-bridge diode-clamped inverter. Simulation and hardware results based on different modulations are presented to confirm the validity of the proposed approach to achieve a high quality output voltage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The stimulus for this project rose from the need to find an alternative solution to aging superstructures of road-bridge in low volume roads (LVR). The solution investigated, designed and consequently plans to construct, involved replacing an aging super-structure of a 10m span bridge with Flat-Bed Rail Wagon (FBRW). The main focus of this paper is to present alternate structural system for the design of the FBRW as road bridge deck conforming to AS5100. The structural adequacy of the primary members of the FBRW was first validated using full scale experimental investigation to AS5100 serviceability and ultimate limit state loading. The bare FBRW was further developed to include a running surface. Two options were evaluated during the design phase, namely timber and reinforced concrete. First option, which is presented here, involved strengthening of the FBRW using numerous steel sections and overlaying the bridge deck with timber planks. The idea of this approach was to use all the primary and secondary members of the FBRW in load sharing and to provide additional members where weaknesses in the original members arose. The second option, which was the preferred option for construction, involved use of primary members only with an overlaying reinforced concrete slab deck. This option minimised the risk associated with any uncertainty of secondary members to its structural adequacy. The paper will report selected results of the experiment as well as the design phases of option one with conclusions highlighting the viability of option 1 and its limitations.