178 resultados para PTP
Resumo:
Vascular endothelial protein tyrosine phosphatase (VE-PTP) is an endothelial-specific receptor-type tyrosine phosphatase that associates with Tie-2 and VE-cadherin. VE-PTP gene disruption leads to embryonic lethality, vascular remodeling defects, and enlargement of vascular structures in extraembryonic tissues. We show here that antibodies against the extracellular part of VE-PTP mimic the effects of VE-PTP gene disruption exemplified by vessel enlargement in allantois explants. These effects require the presence of the angiopoietin receptor Tie-2. Analyzing the mechanism we found that anti-VE-PTP antibodies trigger endocytosis and selectively affect Tie-2-associated, but not VE-cadherin-associated VE-PTP. Dissociation of VE-PTP triggers the activation of Tie-2, leading to enhanced endothelial cell proliferation and enlargement of vascular structures through activation of Erk1/2. Importantly, the antibody effect on vessel enlargement is also observed in newborn mice. We conclude that VE-PTP is required to balance Tie-2 activity and endothelial cell proliferation, thereby controlling blood vessel development and vessel size.
Resumo:
El objetivo principal del proyecto es el desarrollo de un simulador de comunicaciones submarinas, que permite la caracterización del canal a través de datos reales que son usados para establecer la comunicación entre dos puntos, empleando diferentes técnicas de modulación. Dicho simulador, ofrece un interfaz gráfico sencillo de usar y ha sido desarrollado en MatLab, basado en Bellhop [14] y Simulink. Dicho simulador desarrollado se ha usado para realizar simulaciones en diferentes escenarios, con datos reales del océano extraídos de la base de datos WOD [2]. Se ha divido el proyecto en seis partes: INTRODUCCIÓN, MARCO TEÓRICO, IMPLEMENTACIÓN, CONCLUSIONES, MANUAL y PROPUESTA DE PRÁCTICA. Se describen a continuación: En la primera parte, se realiza una introducción al proyecto, indicando las motivaciones que llevaron a desarrollarlo, una breve introducción, los objetivos fijados y un análisis de la evolución histórica de las comunicaciones submarinas, hasta llegar al estado del arte existente. En la segunda parte se describen los fundamentos teóricos necesarios para el desarrollo del proyecto, por una parte lo relativo a las ondas acústicas y su propagación, y por otra lo relativo a las técnicas de modulación digital empleadas. En la tercera parte se describe la implementación del simulador, explicando las funcionalidades existentes y un resumen de cómo fue desarrollado y su arquitectura lo que facilita su uso para proyectos futuros. La cuarta parte analiza las simulaciones realizadas en diversos escenarios, empleando datos reales y datos artificiales para la temperatura y salinidad del agua. En la quinta parte se proporciona un manual de usuario del simulador desarrollado, para que pueda ser usado correctamente. Se describe también el procesado de extracción de datos de WOD para que sean compatibles. Por último, en propuesta didáctica se propone un guión de práctica para desarrollar en la asignatura P.A.S. ABSTRACT. The main goal of this project is the development of an underwater communication simulator, that allows the determination of the underwater channel through real data, using different modulation techniques. The simulator, offers a graphic interface, easy to use and developed in MatLab, based on Bellhop [14] and Simulink. The simulator was given the name of UWACOMSIM and it was used to simulate different scenarios, using data from the WOD [2]. The project is divided into six parts: INTRODUCTION, THEORETICAL FRAMEWORK, IMPLEMENTATION, CONCLUSIONS, MANUAL and DIDACTAL PROPOSAL. These parts are described bellow: In the first part an introduction is given, remarking the motivations that lead to develop the project. Also objectives are explained, a historical analysis of the underwater communications is given, and finish with the state of the art. Secondly, theoretical part is described. First, everything related with acoustics and wave propagation throgh water, secondly, digital modulation techniques are explained. In the third part, the simulation implementation is explained. Main functionalities are highlighted and a brief overview of the architecture is given. This part can be useful for related works. Simulations and conclusions about the results, are done in the fourth part. In this section, different significant scenarios are chosen, and many simulations are launched in order to analyse the data. In the fifth parth, a user manual is provided in order to show the user how to use the simulator and how to download data from WOD if needed. In the final part of the project, a laboratory session is proposed for the subject P.A.S.
Resumo:
The specificity of protein–protein interactions in cellular signaling cascades is dependent on the sequence and intramolecular location of distinct amino acid motifs. We used the two-hybrid interaction trap to identify proteins that can associate with the PDZ motif-rich segment in the protein tyrosine phosphatase PTP-BL. A specific interaction was found with the Lin-11, Isl-1, Mec-3 (LIM) domain containing protein RIL. More detailed analysis demonstrated that the binding specificity resides in the second and fourth PDZ motif of PTP-BL and the LIM domain in RIL. Immunohistochemistry on various mouse tissues revealed a submembranous colocalization of PTP-BL and RIL in epithelial cells. Remarkably, there is also an N-terminal PDZ motif in RIL itself that can bind to the RIL-LIM domain. We demonstrate here that the RIL-LIM domain can be phosphorylated on tyrosine in vitro and in vivo and can be dephosphorylated in vitro by the PTPase domain of PTP-BL. Our data point to the presence of a double PDZ-binding interface on the RIL-LIM domain and suggest tyrosine phosphorylation as a regulatory mechanism for LIM-PDZ associations in the assembly of multiprotein complexes. These findings are in line with an important role of PDZ-mediated interactions in the shaping and organization of submembranous microenvironments of polarized cells.
Resumo:
The transmembrane protein-tyrosine-phosphatases (PTPases) LAR, PTP delta, and PTP sigma each contain two intracellular PTPase domains and an extracellular region consisting of Ig-like and fibronectin type III-like domains. We describe the cloning and characterization of human PTP sigma (HPTP sigma) and compare the structure, alternative splicing, tissue distribution, and PTPase activity of LAR, HPTP delta, and HPTP sigma, as well their ability to associate with the intracellular coiled-coil LAR-interacting protein LIP.1. Overall, these three PTPases are structurally very similar, sharing 64% amino acid identity. Multiple isoforms of LAR, HPTP delta, and HPTP sigma appear to be generated by tissue-specific alternative splicing of up to four mini-exon segments that encode peptides of 4-16 aa located in both the extracellular and intracellular regions. Alternative usage of these peptides varies depending on the tissue mRNA analyzed. Short isoforms of both HPTP sigma and HPTP delta were also detected that contain only four of the eight fibronectin type III-like domains. Northern blot analysis indicates that LAR and HPTP sigma are broadly distributed whereas HPTP delta expression is largely restricted to brain, as is the short HPTP sigma isoform containing only four fibronectin type III-like domains. LAR, HPTP delta, and HPTP sigma exhibit similar in vitro PTPase activities and all three interact with LIP.1, which has been postulated to recruit LAR to focal adhesions. Thus, these closely related PTPases may perform similar functions in various tissues.
Resumo:
Transmission smart grids will use a digital platform for the automation of high voltage substations. The IEC 61850 series of standards, released in parts over the last ten years, provide a specification for substation communications networks and systems. These standards, along with IEEE Std 1588-2008 Precision Time Protocol version 2 (PTPv2) for precision timing, are recommended by the both IEC Smart Grid Strategy Group and the NIST Framework and Roadmap for Smart Grid Interoperability Standards for substation automation. IEC 61850, PTPv2 and Ethernet are three complementary protocol families that together define the future of sampled value digital process connections for smart substation automation. A time synchronisation system is required for a sampled value process bus, however the details are not defined in IEC 61850-9-2. PTPv2 provides the greatest accuracy of network based time transfer systems, with timing errors of less than 100 ns achievable. The suitability of PTPv2 to synchronise sampling in a digital process bus is evaluated, with preliminary results indicating that steady state performance of low cost clocks is an acceptable ±300 ns, but that corrections issued by grandmaster clocks can introduce significant transients. Extremely stable grandmaster oscillators are required to ensure any corrections are sufficiently small that time synchronising performance is not degraded.
Resumo:
Many substation applications require accurate time-stamping. The performance of systems such as Network Time Protocol (NTP), IRIG-B and one pulse per second (1-PPS) have been sufficient to date. However, new applications, including IEC 61850-9-2 process bus and phasor measurement, require accuracy of one microsecond or better. Furthermore, process bus applications are taking time synchronisation out into high voltage switchyards where cable lengths may have an impact on timing accuracy. IEEE Std 1588, Precision Time Protocol (PTP), is the means preferred by the smart grid standardisation roadmaps (from both the IEC and US National Institute of Standards and Technology) of achieving this higher level of performance, and integrates well into Ethernet based substation automation systems. Significant benefits of PTP include automatic path length compensation, support for redundant time sources and the cabling efficiency of a shared network. This paper benchmarks the performance of established IRIG-B and 1-PPS synchronisation methods over a range of path lengths representative of a transmission substation. The performance of PTP using the same distribution system is then evaluated and compared to the existing methods to determine if the performance justifies the additional complexity. Experimental results show that a PTP timing system maintains the synchronising performance of 1-PPS and IRIG-B timing systems, when using the same fibre optic cables, and further meets the needs of process buses in large substations.
Resumo:
A significant issue encountered when fusing data received from multiple sensors is the accuracy of the timestamp associated with each piece of data. This is particularly important in applications such as Simultaneous Localisation and Mapping (SLAM) where vehicle velocity forms an important part of the mapping algorithms; on fastmoving vehicles, even millisecond inconsistencies in data timestamping can produce errors which need to be compensated for. The timestamping problem is compounded in a robot swarm environment due to the use of non-deterministic readily-available hardware (such as 802.11-based wireless) and inaccurate clock synchronisation protocols (such as Network Time Protocol (NTP)). As a result, the synchronisation of the clocks between robots can be out by tens-to-hundreds of milliseconds making correlation of data difficult and preventing the possibility of the units performing synchronised actions such as triggering cameras or intricate swarm manoeuvres. In this thesis, a complete data fusion unit is designed, implemented and tested. The unit, named BabelFuse, is able to accept sensor data from a number of low-speed communication buses (such as RS232, RS485 and CAN Bus) and also timestamp events that occur on General Purpose Input/Output (GPIO) pins referencing a submillisecondaccurate wirelessly-distributed "global" clock signal. In addition to its timestamping capabilities, it can also be used to trigger an attached camera at a predefined start time and frame rate. This functionality enables the creation of a wirelessly-synchronised distributed image acquisition system over a large geographic area; a real world application for this functionality is the creation of a platform to facilitate wirelessly-distributed 3D stereoscopic vision. A ‘best-practice’ design methodology is adopted within the project to ensure the final system operates according to its requirements. Initially, requirements are generated from which a high-level architecture is distilled. This architecture is then converted into a hardware specification and low-level design, which is then manufactured. The manufactured hardware is then verified to ensure it operates as designed and firmware and Linux Operating System (OS) drivers are written to provide the features and connectivity required of the system. Finally, integration testing is performed to ensure the unit functions as per its requirements. The BabelFuse System comprises of a single Grand Master unit which is responsible for maintaining the absolute value of the "global" clock. Slave nodes then determine their local clock o.set from that of the Grand Master via synchronisation events which occur multiple times per-second. The mechanism used for synchronising the clocks between the boards wirelessly makes use of specific hardware and a firmware protocol based on elements of the IEEE-1588 Precision Time Protocol (PTP). With the key requirement of the system being submillisecond-accurate clock synchronisation (as a basis for timestamping and camera triggering), automated testing is carried out to monitor the o.sets between each Slave and the Grand Master over time. A common strobe pulse is also sent to each unit for timestamping; the correlation between the timestamps of the di.erent units is used to validate the clock o.set results. Analysis of the automated test results show that the BabelFuse units are almost threemagnitudes more accurate than their requirement; clocks of the Slave and Grand Master units do not di.er by more than three microseconds over a running time of six hours and the mean clock o.set of Slaves to the Grand Master is less-than one microsecond. The common strobe pulse used to verify the clock o.set data yields a positive result with a maximum variation between units of less-than two microseconds and a mean value of less-than one microsecond. The camera triggering functionality is verified by connecting the trigger pulse output of each board to a four-channel digital oscilloscope and setting each unit to output a 100Hz periodic pulse with a common start time. The resulting waveform shows a maximum variation between the rising-edges of the pulses of approximately 39¥ìs, well below its target of 1ms.
Resumo:
Advanced substation applications, such as synchrophasors and IEC 61850-9-2 sampled value process buses, depend upon highly accurate synchronizing signals for correct operation. The IEEE 1588 Precision Timing Protocol (PTP) is the recommended means of providing precise timing for future substations. This paper presents a quantitative assessment of PTP reliability using Fault Tree Analysis. Two network topologies are proposed that use grandmaster clocks with dual network connections and take advantage of the Best Master Clock Algorithm (BMCA) from IEEE 1588. The cross-connected grandmaster topology doubles reliability, and the addition of a shared third grandmaster gives a nine-fold improvement over duplicated grandmasters. The performance of BMCA mediated handover of the grandmaster role during contingencies in the timing system was evaluated experimentally. The 1 µs performance requirement of sampled values and synchrophasors are met, even during network or GPS antenna outages. Slave clocks are shown to synchronize to the backup grandmaster in response to degraded performance or loss of the main grandmaster. Slave disturbances are less than 350 ns provided the grandmaster reference clocks are not offset from one another. A clear understanding of PTP reliability and the factors that affect availability will encourage the adoption of PTP for substation time synchronization.
Resumo:
Widespread adoption by electricity utilities of Non-Conventional Instrument Transformers, such as optical or capacitive transducers, has been limited due to the lack of a standardised interface and multi-vendor interoperability. Low power analogue interfaces are being replaced by IEC 61850 9 2 and IEC 61869 9 digital interfaces that use Ethernet networks for communication. These ‘process bus’ connections achieve significant cost savings by simplifying connections between switchyard and control rooms; however the in-service performance when these standards are employed is largely unknown. The performance of real-time Ethernet networks and time synchronisation was assessed using a scale model of a substation automation system. The test bed was constructed from commercially available timing and protection equipment supplied by a range of vendors. Test protocols have been developed to thoroughly evaluate the performance of Ethernet networks and network based time synchronisation. The suitability of IEEE Std 1588 Precision Time Protocol (PTP) as a synchronising system for sampled values was tested in the steady state and under transient conditions. Similarly, the performance of hardened Ethernet switches designed for substation use was assessed under a range of network operating conditions. This paper presents test methods that use a precision Ethernet capture card to accurately measure PTP and network performance. These methods can be used for product selection and to assess ongoing system performance as substations age. Key findings on the behaviour of multi-function process bus networks are presented. System level tests were performed using a Real Time Digital Simulator and transformer protection relay with sampled value and Generic Object Oriented Substation Events (GOOSE) capability. These include the interactions between sampled values, PTP and GOOSE messages. Our research has demonstrated that several protocols can be used on a shared process bus, even with very high network loads. This should provide confidence that this technology is suitable for transmission substations.
Resumo:
Abstract is not available.
Resumo:
If a cosmological term is included in the equations of general relativity, the linearized equations can be interpreted as a tensor-scalar theory of finite-range gravitation. The scalar field cannot be transformed away be a gauge transformation (general co-ordinate transformation) and so must be interpreted as a physically significant degree of freedom. The hypothesis that a massive spin-two meson (mass m2) satisfied equations identical in form to the equations of general relativity leads to the prediction of a massive spin-zero meson (mass m0), the ratio of masses being m0 / m2 = 3*3.
Resumo:
We compare magnetovolume effects in bulk and nanoparticles by performing Monte Carlo simulations of a spin-analogous model with coupled spatial and magnetic degrees of freedom and chemical disorder. We find that correlations between surface and bulk atoms lead with decreasing particle size to a substantial modification of the magnetic and elastic behavior at low temperatures.
Resumo:
A formal way of deriving fluctuation-correlation relations in dense sheared granular media, starting with the Enskog approximation for the collision integral in the Chapman-Enskog theory, is discussed. The correlation correction to the viscosity is obtained using the ring-kinetic equation, in terms of the correlations in the hydrodynamic modes of the linearised Enskog equation. It is shown that the Green-Kubo formula for the shear viscosity emerges from the two-body correlation function obtained from the ring-kinetic equation.