952 resultados para PROJECT MANAGEMENT COMPETENCY


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context. Execution of many similar industrial projects creates the idea of lean project management in companies and rapidly growing in industries. This paper offers the standardization method in order to achieve Lean project management in large scale industrial project. Standardization refers to all activity which makes two projects most identical and unify to each other like standardization of design, reducing output variability, value analysis and strategic management. Although standard project may have minor effi ciency decrease, compare to custom built project; but great advantage of standard project like cost saving, time reduction and quality improvement justify standardization methodology. This paper based on empirical experience in industrial project and theoretical analysis of benefi ts of project standardization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increasingly, Australian universities are facing the challenges of global education. While overseas students studying in Australia provide the primary source of export earnings for educational institutions, a number of institutions, including QUT, are also involved in international trade in educational services by providing services offshore. This paper discusses driving forces behind moves by Australian universities to enter the international education market. It then briefly describes Queensland University of Technology’s internationalisation strategy. The paper concludes with a case study describing how the School of Construction Management has pioneered the development of offshore courses at QUT. The introduction of the Master of Project Management and Graduate Diploma of Project Management programs in Singapore in November 1993 represented QUT’s first experience in this area. With the experience of 18 months of operation, the School now has the opportunity to reflect on the outcomes of this venture and consider future options.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The literature abounds with descriptions of failures in high-profile projects and a range of initiatives has been generated to enhance project management practice (e.g., Morris, 2006). Estimating from our own research, there are scores of other project failures that are unrecorded. Many of these failures can be explained using existing project management theory; poor risk management, inaccurate estimating, cultures of optimism dominating decision making, stakeholder mismanagement, inadequate timeframes, and so on. Nevertheless, in spite of extensive discussion and analysis of failures and attention to the presumed causes of failure, projects continue to fail in unexpected ways. In the 1990s, three U.S. state departments of motor vehicles (DMV) cancelled major projects due to time and cost overruns and inability to meet project goals (IT-Cortex, 2010). The California DMV failed to revitalize their drivers’ license and registration application process after spending $45 million. The Oregon DMV cancelled their five year, $50 million project to automate their manual, paper-based operation after three years when the estimates grew to $123 million; its duration stretched to eight years or more and the prototype was a complete failure. In 1997, the Washington state DMV cancelled their license application mitigation project because it would have been too big and obsolete by the time it was estimated to be finished. There are countless similar examples of projects that have been abandoned or that have not delivered the requirements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide of a review of the theory and models underlying project management (PM) research degrees that encourage reflective learning. Design/methodology/approach – Review of the literature and reflection on the practice of being actively involved in conducting and supervising academic research and disseminating academic output. The paper argues the case for the potential usefulness of reflective academic research to PM practitioners. It also highlights theoretical drivers of and barriers to reflective academic research by PM practitioners. Findings – A reflective learning approach to research can drive practical results though it requires a great deal of commitment and support by both academic and industry partners. Practical implications – This paper suggests how PM practitioners can engage in academic research that has practical outcomes and how to be more effective at disseminating these research outcomes. Originality/value – Advanced academic degrees, in particular those completed by PM practitioners, can validate a valuable source of innovative ideas and approaches that should be more quickly absorbed into the PM profession’s sources of knowledge. The value of this paper is to critically review and facilitate a reduced adaptation time for implementation of useful reflective academic research to industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to present a cost-benefit interpretation of academic-practitioner research by describing and analysing several recent relevant examples of academic-practitioner research with a focus on doctoral theses carried out at universities and business schools in clusters of research centred in North America, Australia and Europe. Design/methodology/approach – Using case study examples, a value proposition framework for undertaking collaborative research for higher degree level study is developed and presented. Findings – Value proposition benefits from this level of collaborative research can be summarised as enhancing competencies at the individual and organisational level as well as providing participating universities with high-quality candidates/students and opportunities for industry engagement. The project management (PM) professional bodies can also extend PM knowledge but they need to be prepared to provide active support. Practical implications – A model for better defining the value proposition of collaborative research from a range of stakeholder perspectives is offered that can be adapted for researchers and industry research sponsors. Originality/value – Few papers offer a value proposition framework for explaining collaborative research benefits. This paper addresses that need.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper introduces the underlying principles and the general features of a meta-method (MAP method) developed as part of and used in various research, education and professional development programmes at ESC Lille. This method aims at providing effective and efficient structure and process for acting and learning in various complex, uncertain and ambiguous managerial situations (projects, programmes, portfolios). The paper is developed around three main parts. First, I suggest revisiting the dominant vision of the project management knowledge field, based on the assumptions they are not addressing adequately current business and management contexts and situations, and that competencies in management of entrepreneurial activities are the sources of creation of value for organisations. Then, grounded on the former developments, I introduce the underlying concepts supporting MAP method seen as a ‘convention generator’ and how this meta method inextricably links learning and practice in addressing managerial situations. Finally, I briefly describe an example of application, illustrating with a case study how the method integrates Project Management Governance, and give few examples of use in Management Education and Professional Development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper investigates the role of cultural factors as possible partial explanation of the disparity in terms of project management deployment observed between various studied countries. The topic of culture has received increasing attention in the management literature in general during the last decades and in the project management literature in particular during the last few years. The globalization of businesses and worldwide Governmental/International organizations collaborations drives this interest in the national culture to increase more and more. Based on Hofstede national culture framework, the study hypothesizes and tests the impact of the culture and development of the country on the PM deployment. Seventy-four countries are selected to conduct a correlation and regression analysis between Hofstede’s national culture dimensions and the used PM deployment indicator. The results show the relations between various national culture dimensions and development indicator (GDP/Capita) on the project management deployment levels of the considered countries.