253 resultados para Nominated Subcontractors


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Collaboration is acknowledged as a key to continued growth in the Australian construction industry. Government, as a major industry client, has an important role to play with respect to fostering collaboration and ensuring the global competitiveness of the industry. The paper draws upon data collected for the Construction 2020 study and aims to demonstrate that government can a) help to break down the adversarial situation that currently exists between clients, project managers and subcontractors; and b) allow the supply chain to collaborate more effectively in terms of satisfying the relational and financial needs of all parties. Government can also provide a clear set of guidelines (backed up by a functional dispute resolution system) that will promote confidence with respect to forging relationships. Thus, the paper will discuss the way in which public policy can be more closely aligned with actual industry needs in order to promote greater collaboration.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry is moving towards the implementation of a voluntary code of practice (VCP) for occupational health and safety (OHS). The evidence suggests that highly-visible clients and project management firms, in addition to their subcontractors, will embrace such a code, while smaller firms not operating in high-profile contracting regimes may prove reticent. This paper incorporates qualitative data from a research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the proposed VCP by smaller firms, together with pathways to adoption.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry, reflecting a global trend, is moving towards the implementation of a voluntary code of practice (hereafter VCP) for occupational health and safety. The evidence suggests that highlyvisible clients and project management firms, in addition to their subcontractors, look set to embrace such a code. However, smaller firms not operating in high-profile contracting regimes may prove reticent to adopt a VCP. This paper incorporates qualitative data from a high-profile research project commissioned by Engineers Australia and supported by the Australian Contractors’ Association, Property Council of Australia, Royal Australian Institute of Architects, Association of Consulting Engineers Australia, Australian Procurement and Construction Council, Master Builders Australia and the Australian CRC for Construction Innovation. The paper aims to understand the factors that facilitate or prevent the uptake of the VCP by smaller firms, together with pathways to the adoption of a VCP by industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian construction industry is a fragmented and profoundly competitive industry with high levels of subcontracting resulting in complex supply chain formations. Traditional methods and forms of communication are being proven as inefficient and losing their charm while participants face heavy volumes of communications that often occurs on a daily basis between trading partners in a supply chain on projects. Information Communication Technologies (ICT), due to their robustness and the ability to quickly disseminate data/information, have the capacity to address highlighted communication issues in a structured and an efficient manner. Timesavings produced by these can be directly translated in terms of productivity gain. This paper presents perceptions of subcontractors working in the construction industry in Melbourne Australia on the use of ICT obtained through an exploratory study.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Principal Topic: Project structures are often created by entrepreneurs and large corporate organizations to develop new products. Since new product development projects (NPDP) are more often situated within a larger organization, intrapreneurship or corporate entrepreneurship plays an important role in bringing these projects to fruition. Since NPDP often involves the development of a new product using immature technology, we describe development of an immature technology. The Joint Strike Fighter (JSF) F-35 aircraft is being developed by the U.S. Department of Defense and eight allied nations. In 2001 Lockheed Martin won a $19 billion contract to develop an affordable, stealthy and supersonic all-weather strike fighter designed to replace a wide range of aging fighter aircraft. In this research we define a complex project as one that demonstrates a number of sources of uncertainty to a degree, or level of severity, that makes it extremely difficult to predict project outcomes, to control or manage project (Remington & Zolin, Forthcoming). Project complexity has been conceptualized by Remington and Pollock (2007) in terms of four major sources of complexity; temporal, directional, structural and technological complexity (See Figure 1). Temporal complexity exists when projects experience significant environmental change outside the direct influence or control of the project. The Global Economic Crisis of 2008 - 2009 is a good example of the type of environmental change that can make a project complex as, for example in the JSF project, where project managers attempt to respond to changes in interest rates, international currency exchange rates and commodity prices etc. Directional complexity exists in a project where stakeholders' goals are unclear or undefined, where progress is hindered by unknown political agendas, or where stakeholders disagree or misunderstand project goals. In the JSF project all the services and all non countries have to agree to the specifications of the three variants of the aircraft; Conventional Take Off and Landing (CTOL), Short Take Off/Vertical Landing (STOVL) and the Carrier Variant (CV). Because the Navy requires a plane that can take off and land on an aircraft carrier, that required a special variant of the aircraft design, adding complexity to the project. Technical complexity occurs in a project using technology that is immature or where design characteristics are unknown or untried. Developing a plane that can take off on a very short runway and land vertically created may highly interdependent technological challenges to correctly locate, direct and balance the lift fans, modulate the airflow and provide equivalent amount of thrust from the downward vectored rear exhaust to lift the aircraft and at the same time control engine temperatures. These technological challenges make costing and scheduling equally challenging. Structural complexity in a project comes from the sheer numbers of elements such as the number of people, teams or organizations involved, ambiguity regarding the elements, and the massive degree of interconnectedness between them. While Lockheed Martin is the prime contractor, they are assisted in major aspects of the JSF development by Northrop Grumman, BAE Systems, Pratt & Whitney and GE/Rolls-Royce Fighter Engineer Team and innumerable subcontractors. In addition to identifying opportunities to achieve project goals, complex projects also need to identify and exploit opportunities to increase agility in response to changing stakeholder demands or to reduce project risks. Complexity Leadership Theory contends that in complex environments adaptive and enabling leadership are needed (Uhl-Bien, Marion and McKelvey, 2007). Adaptive leadership facilitates creativity, learning and adaptability, while enabling leadership handles the conflicts that inevitably arise between adaptive leadership and traditional administrative leadership (Uhl-Bien and Marion, 2007). Hence, adaptive leadership involves the recognition and opportunities to adapt, while and enabling leadership involves the exploitation of these opportunities. Our research questions revolve around the type or source of complexity and its relationship to opportunity recognition and exploitation. For example, is it only external environmental complexity that creates the need for the entrepreneurial behaviours, such as opportunity recognition and opportunity exploitation? Do the internal dimensions of project complexity, such as technological and structural complexity, also create the need for opportunity recognition and opportunity exploitation? The Kropp, Zolin and Lindsay model (2009) describes a relationship between entrepreneurial orientation (EO), opportunity recognition (OR), and opportunity exploitation (OX) in complex projects, with environmental and organizational contextual variables as moderators. We extend their model by defining the affects of external complexity and internal complexity on OR and OX. ---------- Methodology/Key Propositions: When the environment complex EO is more likely to result in OR because project members will be actively looking for solutions to problems created by environmental change. But in projects that are technologically or structurally complex project leaders and members may try to make the minimum changes possible to reduce the risk of creating new problems due to delays or schedule changes. In projects with environmental or technological complexity project leaders who encourage the innovativeness dimension of EO will increase OR in complex projects. But projects with technical or structural complexity innovativeness will not necessarily result in the recognition and exploitation of opportunities due to the over-riding importance of maintaining stability in the highly intricate and interconnected project structure. We propose that in projects with environmental complexity creating the need for change and innovation project leaders, who are willing to accept and manage risk, are more likely to identify opportunities to increase project effectiveness and efficiency. In contrast in projects with internal complexity a much higher willingness to accept risk will be necessary to trigger opportunity recognition. In structurally complex projects we predict it will be less likely to find a relationship between risk taking and OP. When the environment is complex, and a project has autonomy, they will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. When a project experiences high competitive aggressiveness and their environment is complex, project leaders will be motivated to execute opportunities to improve the project's performance. In contrast, when the project has high internal complexity, they will be more cautious in execution. This paper reports the first stage of a three year study into the behaviours of managers, leaders and team members of complex projects. We conduct a qualitative study involving a Group Discussion with experienced project leaders. The objective is to determine how leaders of large and potentially complex projects perceive that external and internal complexity will influence the affects of EO on OR. ---------- Results and Implications: These results will help identify and distinguish the impact of external and internal complexity on entrepreneurial behaviours in NPDP. Project managers will be better able to quickly decide how and when to respond to changes in the environment and internal project events.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Case note of Leighton Contractors Pty Ltd v Fox (2009) 258 ALR 673 ----- In Leighton Contractors Pty Ltd v Fox (2009) 83 ALJR 1086 ; 258 ALR 673 the High Court considered the liability of a principal contractor for the negligence of independent subcontractors on a building site. In its decision, the court considered the nature and the scope of the duty owed by principals to independent contractors.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

For participants in defined contribution (DC) plans who refrain from exercising investment choice, plan contributions are invested following the default investment option of their respective plans. Since default investment options of different plans vary widely in terms of their benchmark asset allocation, the most important determinant of investment performance, participants enrolled in these options face significantly different wealth outcomes at retirement. This paper simulates the terminal wealth outcomes under different static asset allocation strategies to evaluate their relative appeal as default investment choice in DC plans. We find that strategies with low or moderate allocation to stocks are consistently outperformed in terms of upside potential of exceeding the participant’s wealth accumulation target at retirement as well as downside risk of falling below that target outcome by aggressive strategies whose allocation to stocks approach 100%. The risk of extremely adverse wealth outcomes for plan participants also does not appear to be very sensitive to asset allocation. Our evidence suggests the appropriateness of strategies heavily tilted towards stocks to be nominated as default investment options in DC plans unless plan providers emphasize predictability of wealth outcomes over adequacy of retirement wealth.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The evaluation of satisfaction levels related to performance is an important aspect in increasing market share, improving profitability and enlarging opportunities for repeat business and can lead to the determination of areas to be improved, improving harmonious working relationships and conflict avoidance. In the construction industry, this can also result in improved project quality, enhanced reputation and increased competitiveness. Many conceptual models have been developed to measure satisfaction levels - typically to gauge client satisfaction, customer satisfaction and home buyer satisfaction - but limited empirical research has been carried out, especially in investigating the satisfaction of construction contractors. In addressing this, this paper provides a unique conceptual model or framework for contractor satisfaction based on attributes identified by interviews with practitioners in Malaysia. In addition to progressing research in this topic and being of potential benefit to Malaysian contractors, it is anticipated that the framework will also be useful for other parties - clients, designers, subcontractors and suppliers - in enhancing the quality of products and/or services generally.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A membrane filtration plant using suitable micro or ultra-filtration membranes has the potential to significantly increase pan stage capacity and improve sugar quality. Previous investigations by SRI and others have shown that membranes will remove polysaccharides, turbidity and colloidal impurities and result in lower viscosity syrups and molasses. However, the conclusion from those investigations was that membrane filtration was not economically viable. A comprehensive assessment of current generation membrane technology was undertaken by SRI. With the aid of two pilot plants provided by Applexion and Koch Membrane Systems, extensive trials were conducted at an Australian factory using clarified juice at 80–98°C as feed to each pilot plant. Conditions were varied during the trials to examine the effect of a range of operating parameters on the filtering characteristics of each of the membranes. These parameters included feed temperature and pressure, flow velocity, soluble solids and impurity concentrations. The data were then combined to develop models to predict the filtration rate (or flux) that could be expected for nominated operating conditions. The models demonstrated very good agreement with the data collected during the trials. The trials also identified those membranes that provided the highest flux levels per unit area of membrane surface for a nominated set of conditions. Cleaning procedures were developed that ensured the water flux level was recovered following a clean-in-place process. Bulk samples of clarified juice and membrane filtered juice from each pilot were evaporated to syrup to quantify the gain in pan stage productivity that results from the removal of high molecular weight impurities by membrane filtration. The results are in general agreement with those published by other research groups.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fermentation feedstocks in the sugar industry are based on cane juice, B molasses or final molasses. Brazil has been producing ethanol by directing sugarcane juice to fermentation directly or using lower quality juice as a diluent with B molasses to prepare the fermentation broth. One issue that has received only limited interest particularly from outside Brazil is the most appropriate conditions for clarification of the juice going to fermentation. Irrespective of whether the juice supply is the total flow from the milling tandem or a diffuser station or a part of the total flow, removal of the insoluble solids is essential. However, the standard defecation process used by sugar factories around the world to clarify juice can introduce unwanted calcium ions and remove other nutrients such as phosphorus and nitrogen that are considered essential for the fermentation process. An investigation was undertaken by SRI to assess the effects on the constituents of cane juice when subjected to the typical clarification process in an Australian factory and what conditions would be needed to provide a clarified juice suitable for fermentation. Typical juices from one factory were clarified in laboratory trials under a range of pH conditions and the resulting clarified juices analysed. The results indicated that pH had a major effect on the residual concentrations of key constituents in the clarified juice and that the selected clarification conditions are determined by the nominated quality criteria of clarified juice feedstock for fermentation. Further trials were conducted in overseas factories to confirm the results obtained in Australia. It became apparent that the preferred specifications for clarified juice going to fermentation varied from country to country. Each supplier of fermentation technology had criteria applying to clarified juice feedstock that would have a major impact on the standard of clarification required to achieve compliance with the criteria.