825 resultados para Manutenção lean
Resumo:
In this paper, the level of lean manufacturing implementation by Saudi manufacturing companies is investigated, the extent of application of lean manufacturing practice is identified and the benefits and barriers of Lean implementation are evaluated. The results reported in this paper are based on data collected from a survey using a standard questionnaire administered to 120 manufacturers in Saudi Arabia. Evidence indicates that large size companies are more likely to implement and gain the advantages of lean manufacturing than small and medium size companies. The most implemented lean manufacturing tools are Computerized Planning Systems, TQM, Maintenance Optimization and CIP. Main barriers against lean manufacturing implementation include the organization culture, lack of management commitment and lack of skilled workers. Results also show that benefits gained from lean manufacturing implementation are significant and are correlated with the level of implementation of lean strategies.
Resumo:
Increasing global competitiveness worldwide has forced manufacturing organizations to produce high-quality products more quickly and at a competitive cost which demand of continuous improvements techniques. In this paper, we propose a fuzzy based performance evaluation method for lean supply chain. To understand the overall performance of cost competitive supply chain, we investigate the alignment of market strategy and position of the supply chain. Competitive strategies can be achieved by using a different weight calculation for different supply chain situations. By identifying optimal performance metrics and applying performance evaluation methods, managers can predict the overall supply chain performance under lean strategy.
Resumo:
The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.
Resumo:
Lean strategies have been developed to eliminate or reduce manufacturing waste and thus improve operational efficiency in manufacturing processes. However, implementing lean strategies requires a large amount of resources and, in practice, manufacturers encounter difficulties in selecting appropriate lean strategies within their resource constraints. There is currently no systematic methodology available for selecting appropriate lean strategies within a manufacturer's resource constraints. In the lean transformation process, it is also critical to measure the current and desired leanness levels in order to clearly evaluate lean implementation efforts. Despite the fact that many lean strategies are utilized to reduce or eliminate manufacturing waste, little effort has been directed towards properly assessing the leanness of manufacturing organizations. In practice, a single or specific group of metrics (either qualitative or quantitative) will only partially measure the overall leanness. Existing leanness assessment methodologies do not offer a comprehensive evaluation method, integrating both quantitative and qualitative lean measures into a single quantitative value for measuring the overall leanness of an organization. This research aims to develop mathematical models and a systematic methodology for selecting appropriate lean strategies and evaluating the leanness levels in manufacturing organizations. Mathematical models were formulated and a methodology was developed for selecting appropriate lean strategies within manufacturers' limited amount of available resources to reduce their identified wastes. A leanness assessment model was developed by using the fuzzy concept to assess the leanness level and to recommend an optimum leanness value for a manufacturing organization. In the proposed leanness assessment model, both quantitative and qualitative input factors have been taken into account. Based on program developed in MATLAB and C#, a decision support tool (DST) was developed for decision makers to select lean strategies and evaluate the leanness value based on the proposed models and methodology hence sustain the lean implementation efforts. A case study was conducted to demonstrate the effectiveness of these proposed models and methodology. Case study results suggested that out of 10 wastes identified, the case organization (ABC Limited) is able to improve a maximum of six wastes from the selected workstation within their resource limitations. The selected wastes are: unnecessary motion, setup time, unnecessary transportation, inappropriate processing, work in process and raw material inventory and suggested lean strategies are: 5S, Just-In-Time, Kanban System, the Visual Management System (VMS), Cellular Manufacturing, Standard Work Process using method-time measurement (MTM), and Single Minute Exchange of Die (SMED). From the suggested lean strategies, the impact of 5S was demonstrated by measuring the leanness level of two different situations in ABC. After that, MTM was suggested as a standard work process for further improvement of the current leanness value. The initial status of the organization showed a leanness value of 0.12. By applying 5S, the leanness level significantly improved to reach 0.19 and the simulation of MTM as a standard work method shows the leanness value could be improved to 0.31. The optimum leanness value of ABC was calculated to be 0.64. These leanness values provided a quantitative indication of the impacts of improvement initiatives in terms of the overall leanness level to the case organization. Sensitivity analsysis and a t-test were also performed to validate the model proposed. This research advances the current knowledge base by developing mathematical models and methodologies to overcome lean strategy selection and leanness assessment problems. By selecting appropriate lean strategies, a manufacturer can better prioritize implementation efforts and resources to maximize the benefits of implementing lean strategies in their organization. The leanness index is used to evaluate an organization's current (before lean implementation) leanness state against the state after lean implementation and to establish benchmarking (the optimum leanness state). Hence, this research provides a continuous improvement tool for a lean manufacturing organization.
Resumo:
BACKGROUND/OBJECTIVES: Recent work suggests that macronutrients are pro-inflammatory and promote oxidative stress. Reports of postprandial regulation of total adiponectin have been mixed, and there is limited information regarding postprandial changes in high molecular weight (HMW) adiponectin. The aim of this study was to assess the effect of a standardised high-fat meal on metabolic variables, adiponectin (total and HMW), and markers of inflammation and oxidative stress in: (i) lean, (ii) obese non-diabetic and (iii) men with type 2 diabetes mellitus (T2DM). SUBJECTS/METHODS: Male subjects: lean (n=10), obese (n=10) and T2DM (n=10) were studied for 6 h following both a high-fat meal and water control. Metabolic variables (glucose, insulin, triglycerides), inflammatory markers (interleukin-6 (IL6), tumour necrosis factor (TNF)α, high-sensitivity C-reactive protein (hsCRP), nuclear factor (NF)κB expression in peripheral blood mononuclear cells (p65)), indicators of oxidative stress (oxidised low density lipoprotein (oxLDL), protein carbonyl) and adiponectin (total and HMW) were measured. RESULTS: No significant changes in TNFα, p65, oxLDL or protein carbonyl concentrations were observed. Overall, postprandial IL6 decreased in subjects with T2DM but increased in lean subjects, whereas hsCRP decreased in the lean cohort and increased in obese subjects. There was no overall postprandial change in total or HMW adiponectin in any group. Total adiponectin concentrations changed over time following the water control, and the response was significantly different in lean subjects compared with subjects with T2DM (P=0.04). CONCLUSIONS: No consistent significant postprandial inflammation, oxidative stress or regulation of adiponectin was observed in this study. Findings from the water control suggest differential basal regulation of total adiponectin in T2DM compared with lean controls.
Resumo:
Increasing global competition, rapid technological changes, advances in manufacturing and information technology and discerning customers are forcing supply chains to adopt improvement practices that enable them to deliver high quality products at a lower cost and in a shorter period of time. A lean initiative is one of the most effective approaches toward achieving this goal. In the lean improvement process, it is critical to measure current and desired performance level in order to clearly evaluate the lean implementation efforts. Many attempts have tried to measure supply chain performance incorporating both quantitative and qualitative measures but failed to provide an effective method of measuring improvements in performances for dynamic lean supply chain situations. Therefore, the necessity of appropriate measurement of lean supply chain performance has become imperative. There are many lean tools available for supply chains; however, effectiveness of a lean tool depends on the type of the product and supply chain. One tool may be highly effective for a supply chain involved in high volume products but may not be effective for low volume products. There is currently no systematic methodology available for selecting appropriate lean strategies based on the type of supply chain and market strategy This thesis develops an effective method to measure the performance of supply chain consisting of both quantitative and qualitative metrics and investigates the effects of product types and lean tool selection on the supply chain performance Supply chain performance matrices and the effects of various lean tools over performance metrics mentioned in the SCOR framework have been investigated. A lean supply chain model based on the SCOR metric framework is then developed where non- lean and lean as well as quantitative and qualitative metrics are incorporated in appropriate metrics. The values of appropriate metrics are converted into triangular fuzzy numbers using similarity rules and heuristic methods. Data have been collected from an apparel manufacturing company for multiple supply chain products and then a fuzzy based method is applied to measure the performance improvements in supply chains. Using the fuzzy TOPSIS method, which chooses an optimum alternative to maximise similarities with positive ideal solutions and to minimise similarities with negative ideal solutions, the performances of lean and non- lean supply chain situations for three different apparel products have been evaluated. To address the research questions related to effective performance evaluation method and the effects of lean tools over different types of supply chains; a conceptual framework and two hypotheses are investigated. Empirical results show that implementation of lean tools have significant effects over performance improvements in terms of time, quality and flexibility. Fuzzy TOPSIS based method developed is able to integrate multiple supply chain matrices onto a single performance measure while lean supply chain model incorporates qualitative and quantitative metrics. It can therefore effectively measure the improvements for supply chain after implementing lean tools. It is demonstrated that product types involved in the supply chain and ability to select right lean tools have significant effect on lean supply chain performance. Future study can conduct multiple case studies in different contexts.
Resumo:
Because of increased competition between healthcare providers, higher customer expectations, stringent checks on insurance payments and new government regulations, it has become vital for healthcare organisations to enhance the quality of the care they provide, to increase efficiency, and to improve the cost effectiveness of their services. Consequently, a number of quality management concepts and tools are employed in the healthcare domain to achieve the most efficient ways of using time, manpower, space and other resources. Emergency departments are designed to provide a high-quality medical service with immediate availability of resources to those in need of emergency care. The challenge of maintaining a smooth flow of patients in emergency departments is a global problem. This study attempts to improve the patient flow in emergency departments by considering Lean techniques and Six Sigma methodology in a comprehensive conceptual framework. The proposed research will develop a systematic approach through integration of Lean techniques with Six Sigma methodology to improve patient flow in emergency departments. The results reported in this paper are based on a standard questionnaire survey of 350 patients in the Emergency Department of Aseer Central Hospital in Saudi Arabia. The results of the study led us to determine the most significant variables affecting patient satisfaction with patient flow, including waiting time during patient treatment in the emergency department; effectiveness of the system when dealing with the patient’s complaints; and the layout of the emergency department. The proposed model will be developed within a performance evaluation metric based on these critical variables, to be evaluated in future work within fuzzy logic for continuous quality improvement.
Resumo:
Lean body mass (LBM) and muscle mass remains difficult to quantify in large epidemiological studies due to non-availability of inexpensive methods. We therefore developed anthropometric prediction equations to estimate the LBM and appendicular lean soft tissue (ALST) using dual energy X-ray absorptiometry (DXA) as a reference method. Healthy volunteers (n= 2220; 36% females; age 18-79 y) representing a wide range of body mass index (14-44 kg/m2) participated in this study. Their LBM including ALST was assessed by DXA along with anthropometric measurements. The sample was divided into prediction (60%) and validation (40%) sets. In the prediction set, a number of prediction models were constructed using DXA measured LBM and ALST estimates as dependent variables and a combination of anthropometric indices as independent variables. These equations were cross-validated in the validation set. Simple equations using age, height and weight explained > 90% variation in the LBM and ALST in both men and women. Additional variables (hip and limb circumferences and sum of SFTs) increased the explained variation by 5-8% in the fully adjusted models predicting LBM and ALST. More complex equations using all the above anthropometric variables could predict the DXA measured LBM and ALST accurately as indicated by low standard error of the estimate (LBM: 1.47 kg and 1.63 kg for men and women, respectively) as well as good agreement by Bland Altman analyses. These equations could be a valuable tool in large epidemiological studies assessing these body compartments in Indians and other population groups with similar body composition.
Resumo:
Lean strategies have been developed to eliminate or reduce waste and thus improve operational efficiency in a manufacturing environment. However, in practice, manufacturers encounter difficulties to select appropriate lean strategies within their resource constraints and to quantitatively evaluate the perceived value of manufacturing waste reduction. This paper presents a methodology developed to quantitatively evaluate the contribution of lean strategies selected to reduce manufacturing wastes within the manufacturers’ resource (time) constraints. A mathematical model has been developed for evaluating the perceived value of lean strategies to manufacturing waste reduction and a step-by-step methodology is provided for selecting appropriate lean strategies to improve the manufacturing performance within their resource constraints. A computer program is developed in MATLAB for finding the optimum solution. With the help of a case study, the proposed methodology and developed model has been validated. A ‘lean strategy-wastes’ correlation matrix has been proposed to establish the relationship between the manufacturing wastes and lean strategies. Using the correlation matrix and applying the proposed methodology and developed mathematical model, authors came out with optimised perceived value of reduction of a manufacturer's wastes by implementing appropriate lean strategies within a manufacturer's resources constraints. Results also demonstrate that the perceived value of reduction of manufacturing wastes can significantly be changed based on policies and product strategy taken by a manufacturer. The proposed methodology can also be used in dynamic situations by changing the input in the programme developed in MATLAB. By identifying appropriate lean strategies for specific manufacturing wastes, a manufacturer can better prioritise implementation efforts and resources to maximise the success of implementing lean strategies in their organisation.
Resumo:
Roofing tile manufacturing is a mass production process with high operational and inventory wastes and costs. Due to huge operational costs, excessive inventory and wastes, and quality problems, roofing tile manufacturers are trying to implement lean manufacturing practice in their operations in order to remain competitive in an ncreasingly competitive global market. The aim of this research is to evaluate the possibility of reducing the operational and inventory costs of the tile manufacturing process through waste minimization. This paper analyses the current waste situation in a tile manufacturing process and develops current and future value stream mapping for such a process with a view to implementing lean principles in manufacturing. The focus of the approach is on cost reduction by eliminating non-value-added activities.
Resumo:
Purpose – The purpose of this paper is to develop an effective methodology for implementing lean manufacturing strategies and a leanness evaluation metric using continuous performance measurement (CPM). Design/methodology/approach – Based on five lean principles, a systematic lean implementation methodology for manufacturing organizations has been proposed. A simplified leanness evaluation metric consisting of both efficiency and effectiveness attributes of manufacturing performance has been developed for continuous evaluation of lean implementation. A case study to validate the proposed methodology has been conducted and proposed CPM metric has been used to assess the manufacturing leanness. Findings – Proposed methodology is able to systematically identify manufacturing wastes, select appropriate lean tools, identify relevant performance indicators, achieve significant performance improvement and establish lean culture in the organization. Continuous performance measurement matrices in terms of efficiency and effectiveness are proved to be appropriate methods for continuous evaluation of lean performance. Research limitations/implications – Effectiveness of the method developed has been demonstrated by applying it in a real life assembly process. However, more tests/applications will be necessary to generalize the findings. Practical implications – Results show that applying the methods developed, managers can successfully identify and remove manufacturing wastes from their production processes. By improving process efficiency, they can optimize their resource allocations. Manufacturers now have a validated step by step methodology for successfully implementing lean strategies. Originality/value – According to the authors’ best knowledge, this is the first known study that proposed a systematic lean implementation methodology based on lean principles and continuous improvement techniques. Evaluation of performance improvement by lean strategies is a critical issue. This study develops a simplified leanness evaluation metric considering both efficiency and effectiveness attributes and integrates it with the lean implementation methodology.
Resumo:
In the present study, we examined the associations of early nutrition with adult lean body mass (LBM) and muscle strength in a birth cohort that was established to assess the long-term impact of a nutrition program. Participants (n = 1,446, 32% female) were born near Hyderabad, India, in 29 villages from 1987 to 1990, during which time only intervention villages (n = 15) had a government program that offered balanced protein-calorie supplementation to pregnant women and children. Participants’ LBM and appendicular skeletal muscle mass were measured using dual energy x-ray absorptiometry; grip strength and information on lifestyle indicators, including diet and physical activity level, were also obtained. Ages (mean = 20.3 years) and body mass indexes (weight (kg)/height (m)2; mean = 19.5) of participants in 2 groups were similar. Current dietary energy intake was higher in the intervention group. Unadjusted LBM and grip strength were similar in 2 groups. After adjustment for potential confounders, the intervention group had lower LBM (β = −0.75; P = 0.03), appendicular skeletal muscle mass, and grip strength than did controls, but these differences were small in magnitude (<0.1 standard deviation). Multivariable regression analyses showed that current socioeconomic position, energy intake, and physical activity level had a positive association with adult LBM and muscle strength. This study could not detect a “programming” effect of early nutrition supplementation on adult LBM and muscle strength.
Nutritional influences over the life course on lean body mass of individuals in developing countries
Resumo:
The double burden of childhood undernutrition and adult-onset adiposity in transitioning societies poses a significant public health challenge. The development of suboptimal lean body mass (LBM) could partly explain the link between these two forms of malnutrition. This review examines the evidence on both the role of nutrition in “developmental programming” of LBM and the nutritional influences that affect LBM throughout the life course. Studies from developing countries assessing the relationship of early nutrition with later LBM provide important insights. Overall, the evidence is consistent in suggesting a positive association of early nutritional status (indicated by birth weight and growth during first 2 years) with LBM in later life. Evidence on the impact of maternal nutritional supplementation during pregnancy on later LBM is inconsistent. In addition, the role of nutrients (protein, zinc, calcium, vitamin D) that can affect LBM throughout the life course is described. Promoting optimal intakes of these important nutrients throughout the life course is important for reducing childhood undernutrition as well as for improving the LBM of adults.
Resumo:
Building Information Modelling (BIM) and Lean construction have existed as two different initiatives to improve construction, with distinct communities and interests. In the last 10 years or so, both have started to diffuse into advanced practice, with accelerating speed. However, recently the insight has gained strength, first among pioneering practitioners and then among academics, that these two initiatives have a considerable mutual synergy and that it is highly advantageous to implement them jointly. In view of this, there are increasing needs to make BIM champions and users aware of Lean principles, methods and tools, as well as Lean champions and implementers aware of the functionalities of BIM. This guide is intended to provide a means to fulfill these needs.