996 resultados para Maintenance Decision
Resumo:
Would the outcome of a Global multinational organization’s decision be the same if the same decision were to be made in different countries throughout the world? Within the same organization, we propose that national cultural differences can influence decision making in different countries and cultural clusters. While much work has been done on organizational cultural influences, this study examines the influence that national culture has on organizational decision making in respect to the evolution/redevelopment decision that organizations face when a system is believed to be entering the obsolescence phase. Building on findings from the Globe research program, we show by empirical testing of a theoretical model that national cultural dimensions are significantly associated with a) the outcome of the decision to enhance or re-develop a system, and b) the organizational level at which such decisions are made. This research is significant as a means to improve management decision making, particularly with regard to the enhancement versus re-development decision. The research suggests that a relatively uniform sub-culture exists across the global IS project level but that national cultural dimensions play a more important role in determining the organizational management level at which decisions are made.
Resumo:
The existing method of pipeline health monitoring, which requires an entire pipeline to be inspected periodically, is unproductive. A risk-based decision support system (DSS) that reduces the amount of time spent on inspection has been presented. The risk-based DSS uses the analytic hierarchy process (AHP), a multiple attribute decision-making technique, to identify the factors that influence failure on specific segments and analyzes their effects by determining probability of occurrence of these risk factors. The severity of failure is determined through consequence analysis. From this, the effect of a failure caused by each risk factor can be established in terms of cost and the cumulative effect of failure is determined through probability analysis. The model optimizes the cost of pipeline operations by reducing subjectivity in selecting a specific inspection method, identifying and prioritizing the right pipeline segment for inspection and maintenance, deriving budget allocation, providing guidance to deploy the right mix labor for inspection and maintenance, planning emergency preparation, and deriving logical insurance plan. The proposed methodology also helps derive inspection and maintenance policy for the entire pipeline system, suggest design, operational philosophy, and construction methodology for new pipelines.
Resumo:
Infrastructure management agencies are facing multiple challenges, including aging infrastructure, reduction in capacity of existing infrastructure, and availability of limited funds. Therefore, decision makers are required to think innovatively and develop inventive ways of using available funds. Maintenance investment decisions are generally made based on physical condition only. It is important to understand that spending money on public infrastructure is synonymous with spending money on people themselves. This also requires consideration of decision parameters, in addition to physical condition, such as strategic importance, socioeconomic contribution and infrastructure utilization. Consideration of multiple decision parameters for infrastructure maintenance investments can be beneficial in case of limited funding. Given this motivation, this dissertation presents a prototype decision support framework to evaluate trade-off, among competing infrastructures, that are candidates for infrastructure maintenance, repair and rehabilitation investments. Decision parameters' performances measured through various factors are combined to determine the integrated state of an infrastructure using Multi-Attribute Utility Theory (MAUT). The integrated state, cost and benefit estimates of probable maintenance actions are utilized alongside expert opinion to develop transition probability and reward matrices for each probable maintenance action for a particular candidate infrastructure. These matrices are then used as an input to the Markov Decision Process (MDP) for the finite-stage dynamic programming model to perform project (candidate)-level analysis to determine optimized maintenance strategies based on reward maximization. The outcomes of project (candidate)-level analysis are then utilized to perform network-level analysis taking the portfolio management approach to determine a suitable portfolio under budgetary constraints. The major decision support outcomes of the prototype framework include performance trend curves, decision logic maps, and a network-level maintenance investment plan for the upcoming years. The framework has been implemented with a set of bridges considered as a network with the assistance of the Pima County DOT, AZ. It is expected that the concept of this prototype framework can help infrastructure management agencies better manage their available funds for maintenance.
Resumo:
This paper investigates three decision problems with potential to optimize operation and maintenance and logistics strategies for offshore wind farms: the timing of pre-determined jack-up vessel campaigns; selection of crew transfer vessel fleet; and timing of annual services. These problems are compared both in terms of potential cost reduction and the stochastic variability and associated uncertainty of the outcome. Pre-determined jack-up vessel campaigns appear to have a high cost reduction potential but also a higher stochastic variability than the other decision problems. The paper also demonstrates the benefits and difficulties of considering problems together rather than solving them in isolation.
Resumo:
The aim of this in vitro study was to evaluate four different approaches to the decision of changing or not defective amalgam restorations in first primary molar teeth concerning the loss of dental structure. Ditched amalgam restorations (n = 11) were submitted to four different treatments, as follows: Control group - polishing and finishing of the restorations were carried out; Amalgam group - the ditched amalgam restorations were replaced by new amalgam restorations; Composite resin group - the initial amalgam restorations were replaced by composite resin restorations; Flowable resin group - the ditching around the amalgam restorations was filled with flowable resin. Images of the sectioned teeth were made and the area of the cavities before and after the procedures was determined by image analysis software to assess structural loss. The data were submitted to ANOVA complemented by the Student Newman Keuls test (p < 0.05). The cavities in all the groups presented significantly greater areas after the procedures. However, the amalgam group showed more substantial dental loss. The other three groups presented no statistically significant difference in dental structure loss after the re-treatments. Thus, replacing ditched amalgam restorations by other similar restorations resulted in a significant dental structure loss while maintaining them or replacing them by resin restorations did not result in significant loss.
Resumo:
In the last decades considerations about equipments' availability became an important issue, as well as its dependence on components characteristics such as reliability and maintainability. This is particularly of outstanding importance if one is dealing with high risk industrial equipments, where these factors play an important and fundamental role in risk management when safety or huge economic values are in discussion. As availability is a function of reliability, maintainability, and maintenance support activities, the main goal is to improve one or more of these factors. This paper intends to show how maintainability can influence availability and present a methodology to select the most important attributes for maintainability using a partial Multi Criteria Decision Making (pMCDM). Improvements in maintainability can be analyzed assuming it as a probability related with a restore probability density function [g(t)].
Resumo:
Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.
Resumo:
The environmental management domain is vast and encompasses many identifiable activities: impact assessment, planning, project evaluation, etc. In particular, this paper focusses on the modelling of the project evaluation activity. The environmental decision support system under development aims to provide assistance to project developers in the selection of adequate locations, guaranteeing the compliance with the applicable regulations and the existing development plans as well as satisfying the specified project requirements. The inherent multidisciplinarity features of this activity lead to the adoption of the Multi-Agent paradigm, and, in particular, to the modelling of the involved agencies as a community of cooperative autonomous agents, where each agency contributes with its share of problem solving to the final system’s recommendation. To achieve this behaviour the many conclusions of the individual agencies have to be justifiably accommodated: not only they may differ, but can be interdependent, complementary, irreconcilable, or simply, independent. We propose different solutions (involving both local and global consistency) to support the adequate merge of the distinct perspectives that inevitably arise during this type of decision making.
Resumo:
This article discusses the development of an Intelligent Distributed Environmental Decision Support System, built upon the association of a Multi-agent Belief Revision System with a Geographical Information System (GIS). The inherent multidisciplinary features of the involved expertises in the field of environmental management, the need to define clear policies that allow the synthesis of divergent perspectives, its systematic application, and the reduction of the costs and time that result from this integration, are the main reasons that motivate the proposal of this project. This paper is organised in two parts: in the first part we present and discuss the developed - Distributed Belief Revision Test-bed - DiBeRT; in the second part we analyse its application to the environmental decision support domain, with special emphasis on the interface with a GIS.
Resumo:
This article discusses the development of an Intelligent Distributed Environmental Decision Support System, built upon the association of a Multi-agent Belief Revision System with a Geographical Information System (GIS). The inherent multidisciplinary features of the involved expertises in the field of environmental management, the need to define clear policies that allow the synthesis of divergent perspectives, its systematic application, and the reduction of the costs and time that result from this integration, are the main reasons that motivate the proposal of this project. This paper is organised in two parts: in the first part we present and discuss the developed ; in the second part we analyse its application to the environmental decision support domain, with special emphasis on the interface with a GIS.