858 resultados para Lifetime contract
Resumo:
Few studies have evaluated the reliability of lifetime sun exposure estimated from inquiring about the number of hours people spent outdoors in a given period on a typical weekday or weekend day (the time-based approach). Some investigations have suggested that women have a particularly difficult task in estimating time outdoors in adulthood due to their family and occupational roles. We hypothesized that people might gain additional memory cues and estimate lifetime hours spent outdoors more reliably if asked about time spent outdoors according to specific activities (an activity-based approach). Using self-administered, mailed questionnaires, test-retest responses to time-based and to activity-based approaches were evaluated in 124 volunteer radiologic technologist participants from the United States: 64 females and 60 males 48 to 80 years of age. Intraclass correlation coefficients (ICC) were used to evaluate the test-retest reliability of average number of hours spent outdoors in the summer estimated for each approach. We tested the differences between the two ICCs, corresponding to each approach, using a t test with the variance of the difference estimated by the jackknife method. During childhood and adolescence, the two approaches gave similar ICCs for average numbers of hours spent outdoors in the summer. By contrast, compared with the time-based approach, the activity-based approach showed significantly higher ICCs during adult ages (0.69 versus 0.43, P = 0.003) and over the lifetime (0.69 versus 0.52, P = 0.05); the higher ICCs for the activity-based questionnaire were primarily derived from the results for females. Research is needed to further improve the activity-based questionnaire approach for long-term sun exposure assessment. (Cancer Epidemiol Biomarkers Prev 2009;18(2):464–71)
Resumo:
It is the purpose of this article to examine the means curently available to judges to achieve a workable balance between providing appropriate consumer protection to signatories of standard form contractors while still retaining adequate respect for the sanctity of contract, and, based on this analysis, to determine whether a significantly greater scope of contract (re)construction is likely to become the norm in most common law jurisdictions in the coming decades.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
With an increasing body of literature linking the human resource management and marketing fields, one area receiving increased academic attention is how an organisation’s corporate reputation can be managed to attract potential recruits and shape their employment expectations through their psychological contracts. This paper seeks to enhance current models which focus on the interrelationship of corporate reputation and psychological contract theory. It is argued that a number of factors need to be considered in order the build a firmer foundation for such a theory. Firstly, a common understanding of the psychological contract needs to be established such that the focus on either expectations or promises is clarified. Secondly, the included components of the psychological contract need to be considered in light of their empirical founding and their relationship with one another. Thirdly, the interrelationship of corporate reputation, employer branding, identity and image needs to be explicated within the context of how they both influence and interrelate with the psychological contract. The final consideration surrounds the opportunity for potential employees to be considered within the corporate reputation literature as a significant stakeholder group.
Resumo:
The psychological contract has emerged over the past 60 years as a key analytical device for both academics and practitioners to conceptualise and explain the employment relationship. However, despite the recognised import of this field, some authors suggest it has fallen into a ‘methodological rut’ and is neglecting to empirically assess basic theoretical tenets of the concept – such as the temporal and individualised, subjective nature of the construct. This paper describes the research design of a longitudinal, mixed methods study to explore development and change in the psychological contract and outline how the use of individual growth modelling can be a powerful tool in analysing the type of quantitative data collected. Finally, by briefly outlining the benefits of this approach, the paper seeks to offer an alternative methodology to explore the dynamic and intra-individual processes within the psychological contract domain.
Resumo:
The psychological contract is a frequently deployed construct to examine the dynamics of the employee-employer exchange relationship. While there is consensus that the contract comprises employee and employer beliefs regarding this relationship, the various belief types are not conceptually well-defined and understood. Over time, the contract has been conceptualised as comprising expectations, obligations, promises or some combination therein. While most contemporary researchers focus solely upon promises, the justifications for this position are unpersuasive. This paper theoretically describes the various belief types, identifies their interrelationships and proposes a reconceptualisation of the beliefs constituting the contract. Specifically, it is demonstrated that the extant promise-based belief framework provides too restrictive a theoretical base for a comprehensive understanding of individuals’ psychological contracts.
Resumo:
Legal advisers are often called upon to advise whether informal correspondence between clients may give rise to a binding contract. The decision of Mullins J in Teviot Downs Estate Pty Ltd v MTAA Superannuation Fund (Flagstone Creek and Spring Mountain Park) Property Pty Ltd [2003] QSC 403 provides general guidance as to matters that may be relevant when faced with this thorny issue.
Resumo:
Section 366 of the Property Agents and Motor Dealers Act 2000 (Qld) provides that all contracts for the sale of residential property in Queensland (other than contracts formed on a sale by auction) should have “attached” as the first or top sheet a warning statement in the approved form. The section does not explain or define the meaning of the word “attached”. Further, the section does not contemplate the situation where the contract is faxed to a potential buyer for execution.
Resumo:
This was the question that confronted Wilson J in Jarema Pty Ltd v Michihiko Kato [2004] QSC 451. Facts The plaintiff was the buyer of a commercial property at Bundall. The property comprised a 6 storey office building with a basement car park with 54 car parking spaces. The property was sold for $5 million with the contract being the standard REIQ/QLS form for Commercial Land and Buildings (2nd ed GST reprint). The contract provided for a “due diligence” period. During this period, the buyer’s solicitors discovered that there was no direct access from a public road to the car park entrance. Access to the car park was over a lot of which the Gold Coast City Council was the registered owner under a nomination of trustees, the Council holding the property on trust for car parking and town planning purposes. Due to the absence of a registered easement over the Council’s land, the buyer’s solicitors sought a reduction in the purchase price. The seller would not agree to this. Finally the sale was completed with the buyer reserving its rights to seek compensation.
Resumo:
The Reference Schedule to the REIQ houses and land contract and the lots in a Community Titles Scheme (“CTS”) contract has been amended to contain provision for disclosure concerning the installation of an approved safety switch. This section will not be required to be completed if the land is vacant (in the case of the houses and land contract) or if the present use is a commercial use (in the case of the lots in a CTS contract).