798 resultados para Key Performance Indicators


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents some evidence on an aspect of the design of a strategic control system, at the microlevel, within a single organization. The research we report used an ethnographic approach to provide an understanding of strategy formulation. Our aim is to contribute to an area of literature which is of increasing significance, but relatively underdeveloped in terms of the application of in-depth, field-research techniques. We take an intensive look at the manner in which performance measures are formulated, at the microlevel, within a single organization. The article presents, as an in-depth case analysis, the experience of a fisheries holding company in New Zealand. The article recounts the experiences of managers within the organization of the process of identification of such things as critical success factors and key performance indicators (KPIs) and, more broadly, the formulation of a strategic performance measurement system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

High effectiveness and leanness of modern supply chains (SCs) increase their vulnerability, i.e. susceptibility to disturbances reflected in non-robust SC performances. Both the SC management literature and SC professionals indicate the need for the development of SC vulnerability assessment tools. In this article, a new method for vulnerability assessment, the VULA method, is presented. The VULA method helps to identify how much a company would underperform on a specific Key Performance Indicator in the case of a disturbance, how often this would happen and how long it would last. It ultimately informs the decision about whether process redesign is appropriate and what kind of redesign strategies should be used in order to increase the SC's robustness. The applicability of the VULA method is demonstrated in the context of a meat SC using discrete-event simulation to conduct the performance analysis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Digital videophotography, computer image analysis and physical measurements have been used to monitor sedimentation rates, coral cover, genera richness, rugosity and estimated recruitment dates of massive corals at three different sites in the Wakatobi Marine National Park, Indonesia, and on the reefs around Discovery Bay, Jamaica. Semi-structured interviews with key stakeholders in the Wakatobi Marine National Park indicated that coral mining was extensively practised, and is responsible for the absence of large non-branching corals on the Sampela reef Blast fishing is also practised in the Wakatobi Marine Park, and the authors, together with students, showed that blast fishing resulted in coral bleaching and not mortality of two Porites lutea colonies. In addition, we showed that monitoring of bleaching in Porites colonies induced by blast fishing could be a useful way of monitoring blast fishing practices in susceptible areas in the Indo-Pacific. The techniques used in this study are appropriate for use by volunteers with sufficient training, and provide excellent projects for dissertation students reading undergraduate degrees.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This feasibility study was established to investigate the application of the concept of ‘best value’ in construction procurement in Australia. In the case of ‘best value’ in the business enterprise, ‘best value’ is that which returns greatest value to the business enterprise’s shareholders. However, in the case of the public sector, ‘best value’ is more complex. For that reason, this research project focuses mainly on public sector construction project procurement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The paper aims to explore the key competitiveness indicators (KCIs) that provide the guidelines for helping new real estate developers (REDs) achieve competitiveness during their inception stage in which the organisations start their business. Design/methodology/approach – The research was conducted using a combination of various methods. A literature review was undertaken to provide a proper theoretical understanding of organisational competitiveness within RED's activities and developed a framework of competitiveness indicators (CIs) for REDs. The Delphi forecasting method is employed to investigate a group of 20 experts' perception on the relative importance between CIs. Findings – The results show that the KCIs of new REDs are capital operation capability, entrepreneurship, land reserve capability, high sales revenue from the first real estate development project, and innovation capability. Originality/value – The five KCIs of new REDs are new. In practical terms, the examination of these KCIs would help the business managers of new REDs to effectively plan their business by focusing their efforts on these key indicators. The KCIs can also help REDs provide theoretical constructs of the knowledge base on organisational competitiveness from a dynamic perspective, and assist in providing valuable experiences and in formulating feasible strategies for survival and growth.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organizations that leverage lessons learned from their experience in the practice of complex real-world activities are faced with five difficult problems. First, how to represent the learning situation in a recognizable way. Second, how to represent what was actually done in terms of repeatable actions. Third, how to assess performance taking account of the particular circumstances. Fourth, how to abstract lessons learned that are re-usable on future occasions. Fifth, how to determine whether to pursue practice maturity or strategic relevance of activities. Here, organizational learning and performance improvement are investigated in a field study using the Context-based Intelligent Assistant Support (CIAS) approach. A new conceptual framework for practice-based organizational learning and performance improvement is presented that supports researchers and practitioners address the problems evoked and contributes to a practice-based approach to activity management. The novelty of the research lies in the simultaneous study of the different levels involved in the activity. Route selection in light rail infrastructure projects involves practices at both the strategic and operational levels; it is part managerial/political and part engineering. Aspectual comparison of practices represented in Contextual Graphs constitutes a new approach to the selection of Key Performance Indicators (KPIs). This approach is free from causality assumptions and forms the basis of a new approach to practice-based organizational learning and performance improvement. The evolution of practices in contextual graphs is shown to be an objective and measurable expression of organizational learning. This diachronic representation is interpreted using a practice-based organizational learning novelty typology. This dissertation shows how lessons learned when effectively leveraged by an organization lead to practice maturity. The practice maturity level of an activity in combination with an assessment of an activity’s strategic relevance can be used by management to prioritize improvement effort.