944 resultados para Intranets (Computer networks) -- Design and construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most Iowa counties maintain low volume roads with at least one bridge or culvert that is structurally deficient or obsolete. In some counties the percentage of deficient drainage structures may be as high as 62%. Replacement with structures of similar size would require large capital expenditures that many counties cannot afford. Low water stream crossings (LWSCs) may be an acceptable lowcost alternative in some cases.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In addition to the Fair Housing Act of 1968, other legislation has expanded protection from discrimination for individuals with disabilities, including the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990. Notably, the Fair Housing Amendments Act (FHAA), signed into law by Ronald Reagan in 1988, expanded equal housing protection to individuals with disabilities. The legislative history behind the 1988 Amendments notes that one aim of the law was to address both purposeful discrimination as well as what is sometimes unintentional discrimination caused by the design and construction of inaccessible housing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The article focuses on the following: Cattle Perception, How to prevent Balking, Solid Fences, Flight Zone, Curved Race more Efficient, Curved Race and Crowd Pen Dimensions, Loading Ramps, Working Corral for a Large Ranch, Squeeze Chutes and Headgates, Calf Tables, Artificial Insemination Chute, New Restraint Ideas, Dipping Vats, Bruise and Injury Prevention, Washable Facilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To evaluate the use of computer-assisted designed and manufactured (CAD/CAM) orbital wall and floor implants for late reconstruction of extensive orbital fractures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Here, I merge the principles of synthetic biology1,2 and regulatory evolution3-11 to create a new species12-15 with a minimal set of known elements. Using preexisting transgenes and recessive mutations of Drosophila melanogaster, a transgenic population arises with small eyes and a different venation pattern that fulfills the criteria of a new species according to Mayr's "Biological Species Concept"7,10. The genetic circuit entails the loss of a non-essential transcription factor and the introduction of cryptic enhancers. Subsequent activation of those enhancers causes hybrid lethality. The transition from "transgenic organisms" towards "synthetic species", such as Drosophila synthetica, constitutes a safety mechanism to avoid hybridization with wild type populations and preserve natural biodiversity16-18. Drosophila synthetica is the first transgenic organism that cannot hybridize with the original wild type population but remains fertile when crossed with other transgenic animals.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVES Optical scanners combined with computer-aided design and computer-aided manufacturing (CAD/CAM) technology provide high accuracy in the fabrication of titanium (TIT) and zirconium dioxide (ZrO) bars. The aim of this study was to compare the precision of fit of CAD/CAM TIT bars produced with a photogrammetric and a laser scanner. METHODS Twenty rigid CAD/CAM bars were fabricated on one single edentulous master cast with 6 implants in the positions of the second premolars, canines and central incisors. A photogrammetric scanner (P) provided digitized data for TIT-P (n=5) while a laser scanner (L) was used for TIT-L (n=5). The control groups consisted of soldered gold bars (gold, n=5) and ZrO-P with similar bar design. Median vertical distance between implant and bar platforms from non-tightened implants (one-screw test) was calculated from mesial, buccal and distal scanning electron microscope measurements. RESULTS Vertical microgaps were not significantly different between TIT-P (median 16μm; 95% CI 10-27μm) and TIT-L (25μm; 13-32μm). Gold (49μm; 12-69μm) had higher values than TIT-P (p=0.001) and TIT-L (p=0.008), while ZrO-P (35μm; 17-55μm) exhibited higher values than TIT-P (p=0.023). Misfit values increased in all groups from implant position 23 (3 units) to 15 (10 units), while in gold and TIT-P values decreased from implant 11 toward the most distal implant 15. SIGNIFICANCE CAD/CAM titanium bars showed high precision of fit using photogrammetric and laser scanners. In comparison, the misfit of ZrO bars (CAM/CAM, photogrammetric scanner) and soldered gold bars was statistically higher but values were clinically acceptable.