877 resultados para Incomplete contract
Resumo:
Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.
Resumo:
This paper introduces the Corporate Culture Change Cycle: a continuous innovation methodology for transforming the psychological contract in an organisational context. The eight step process is based on the action learning model. The purpose of this methodology is to benchmark the psychological contract against eight changing values of the employment relationship as a basis for facilitating a process of aligning the changing needs of employer and employee. Both the Corporate Culture Change Cycle and the New Employment Relationship Model have been validated in several organisational settings and subsequently refined. This continuous innovation methodology addresses gaps in the psychological contract, change management and continuous innovation research literatures. The approach therefore should be of interest to researchers in these fields of study and from a practical perspective for managers wishing to transform their workplace cultures.
Resumo:
Although full-term pregnancies reduce the risk of ovarian cancer, it has not been conclusively established whether incomplete pregnancies also influence risk. We investigated the relationship between a history of incomplete pregnancy and incident epithelial ovarian cancer among over 4,500 women who participated in two large Australian population-based case-control studies in 1990-1993 and 2002-2005. They provided responses to detailed questions about their reproductive histories and other personal factors. Summary odds ratios (OR) and confidence intervals (CI) derived from each study using the same covariates were aggregated. We found no significant associations between the number of incomplete pregnancies and ovarian cancer, for parous (OR = 0.98, 95% CI: 0.89, 1.08) or nulliparous (OR = 1.06, 95% CI: 0.75, 1.48) women, nor for the number of spontaneous or induced abortions and ovarian cancer for parous women (OR = 0.95, 95% CI 0.82, 1.09; OR = 1.08, 95% CI: 0.86, 1.36) or nulliparous women (OR = 1.2, 95% CI: 0.6, 2.4; OR = 0.8, 95% CI: 0.47, 1.38), respectively. A systematic review of 37 previous studies of the topic confirmed our findings that a history of incomplete pregnancy does not influence a woman’s risk of epithelial ovarian cancer.
Resumo:
The transformation of China's urban landscape has witnessed a boom in cultural adaptation, namely the adaptation of a Western idea, the creative cluster. This chapter examines the formatting of hundreds of creative clusters-art centres, animation bases, cultural zones, and incubators. The cluster has important implications for how we understand China going forward into the second decade of the 21st century. The cluster phenomenon has resulted in to a substantive remaking of the social contract, between officials, entrepreneurs, local residents, academics-and most significantly cultural producers. However, these processes of adaption are mostly driven by real estate developers working in partnership with local government officials. Cut and paste design is the fast road to completion. In this sense, the description 'creative' may well be redundant.
Resumo:
It is the purpose of this article to examine the means curently available to judges to achieve a workable balance between providing appropriate consumer protection to signatories of standard form contractors while still retaining adequate respect for the sanctity of contract, and, based on this analysis, to determine whether a significantly greater scope of contract (re)construction is likely to become the norm in most common law jurisdictions in the coming decades.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
This paper raises some questions about teaching and teacher education in the social sciences in response to the decision to implement a national curriculum in Australia. In particular, it contends that the decision to focus on discipline-specific knowledge in the social sciences will not necessarily meet the hopes of the Melbourne Declaration and deliver a 21st century curriculum that prepares students for the future. In doing so, it suggests that social educators need to engage with the broader discourse and political context shaping the push for curriculum reform in Australia and makes reference to the marginalisation of civics and citizenship education in the latest draft of the Australian curriculum: History.
Resumo:
With an increasing body of literature linking the human resource management and marketing fields, one area receiving increased academic attention is how an organisation’s corporate reputation can be managed to attract potential recruits and shape their employment expectations through their psychological contracts. This paper seeks to enhance current models which focus on the interrelationship of corporate reputation and psychological contract theory. It is argued that a number of factors need to be considered in order the build a firmer foundation for such a theory. Firstly, a common understanding of the psychological contract needs to be established such that the focus on either expectations or promises is clarified. Secondly, the included components of the psychological contract need to be considered in light of their empirical founding and their relationship with one another. Thirdly, the interrelationship of corporate reputation, employer branding, identity and image needs to be explicated within the context of how they both influence and interrelate with the psychological contract. The final consideration surrounds the opportunity for potential employees to be considered within the corporate reputation literature as a significant stakeholder group.
Resumo:
The psychological contract has emerged over the past 60 years as a key analytical device for both academics and practitioners to conceptualise and explain the employment relationship. However, despite the recognised import of this field, some authors suggest it has fallen into a ‘methodological rut’ and is neglecting to empirically assess basic theoretical tenets of the concept – such as the temporal and individualised, subjective nature of the construct. This paper describes the research design of a longitudinal, mixed methods study to explore development and change in the psychological contract and outline how the use of individual growth modelling can be a powerful tool in analysing the type of quantitative data collected. Finally, by briefly outlining the benefits of this approach, the paper seeks to offer an alternative methodology to explore the dynamic and intra-individual processes within the psychological contract domain.
Resumo:
The psychological contract is a frequently deployed construct to examine the dynamics of the employee-employer exchange relationship. While there is consensus that the contract comprises employee and employer beliefs regarding this relationship, the various belief types are not conceptually well-defined and understood. Over time, the contract has been conceptualised as comprising expectations, obligations, promises or some combination therein. While most contemporary researchers focus solely upon promises, the justifications for this position are unpersuasive. This paper theoretically describes the various belief types, identifies their interrelationships and proposes a reconceptualisation of the beliefs constituting the contract. Specifically, it is demonstrated that the extant promise-based belief framework provides too restrictive a theoretical base for a comprehensive understanding of individuals’ psychological contracts.