861 resultados para Electric utilities -- Accounting -- Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of the study is to identify the latest trends in accounting forensic work in Australia by examining how accounting firms that specialise in forensic services meet the needs of their clients, and to inform universities on the appropriate curricula to ensure the knowledge and skills of future graduates meet industry expectations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Starting from the deregulated process of the Electric Sector, there was the need to attribute responsibilities to several agents and to elaborate appropriate forms of remuneration of the services rendered by the same. One of the services of great importance within this new electric sector is the Ancillary Services. Among the various types of Ancillary Services, Spinning Reserve is a service necessary for maintaining the integrity of the transmission system from either generation interruptions or load variations. This paper uses the application of the Economic Dispatch theory with the objective of quantifies the availability of Spinning Reserve supply in hydroelectric plants. The proposed methodology utilizes the generating units as well as their efficiencies so as to attend the total demand with the minimum water discharge. The proposed methodology was tested through the data provided by the Água Vermelha Hydroelectric Power Plant. These tests permitted the opportunity cost valuation to the Spinning Reserve supply in hydroelectric plants. © 2005 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the considerable increase of the losses in electric utilities of developing countries, such as Brazil, there is an investigation for loss calculation methodologies, considering both technical (inherent of the system) and non-technical (usually associated to the electricity theft) losses. In general, all distribution networks know the load factor, obtained by measuring parameters directly from the network. However, the loss factor, important for the energy loss cost calculation, can only be obtained in a laborious way. Consequently, several formulas have been developed for obtaining the loss factor. Generally, it is used the expression that relates both factors, through the use of a coefficient k. Last reviews introduce a range of factor k within 0.04 - 0.30. In this work, an analysis with real life load curves is presented, determining new values for the coefficient k in a Brazilian electric utility. © 2006 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a methodology for the placement and sizing evaluation of distributed generation (DG) in electric power systems. The candidate locations for DG placement are identified on the bases of Locational Marginal Prices (LMP's) obtained from an optimal power flow solution. The problem is formulated for two different objectives: social welfare maximization and profit maximization. For each DG unit an optimal placement is identified for each of the objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article shows an analysis of the longitudinal electric parameters of a three-phase transmission line/section using a 280-meter high steel tower. This characteristic, the height of the line conductors and distance between them, are intrinsic related to the longitudinal and transversal parameters of the line. By this means, an accurate study was carried out in order to show the electric variations between a transmission line using the new technology and a three-phase conventional 440 kV line for a wide range of frequencies and a variable soil resistivity. In addition, by using a digital line model, simulations are carried out in time domain to analyze critical overvoltage transients on the studied line. © 2011 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a model for determining value at operational risk ?OpVaR? in electric utilities, with the aim to confirm the versatility of the Bank for International Settlements (BIS) proposals. The model intends to open a new methodological approach in risk management, paying special attention to underlying operational sources of risk.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Shipping list no.: 91-609-P.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Title from cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: 1896.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Item 429-T-11.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At head of title: S-109-A.