185 resultados para Dredging
Resumo:
Estimate of dredging prices, July 14, 1854.
Resumo:
Department of Physical Oceanography, School of Marine Sciences,Cochin University of Science and Technology
Resumo:
We used a battery of biomarkers in fish to study the effects of the extensive dredging in Goteborg harbor situated at the river Gota alv estuary, Sweden. Eelpout (Zoarces viviparus) were sampled along a gradient into Goteborg harbor, both before and during the dredging. Biomarker responses in the eelpout before the dredging already indicated that fish in Goteborg harbor are chronically affected by pollutants under normal conditions compared to those in a reference area. However, the results during the dredging activities clearly show that fish were even more affected by remobilized pollutants. Elevated ethoxyresorufin-O-deethylase activities and cytochrome P4501A levels indicated exposure to polycyclic aromatic hydrocarbons. Elevated metallothionein gene expression indicated an increase in metal exposure. An increase in general cell toxicity, measured as a decrease in lysosomal membrane stability, as well as effects on the immune system also could be observed in eelpout sampled during the dredging. The results also suggest that dredging activities in the Gota alv estuary can affect larger parts of the Swedish western coast than originally anticipated. The present study demonstrates that the application of a set of biomarkers is a useful approach in monitoring the impact of anthropogenic activities on aquatic environments.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
The purpose of this study is to provide a procedure to include emissions to the atmosphere resulting from the combustion of diesel fuel during dredging operations into the decision-making process of dredging equipment selection. The proposed procedure is demonstrated for typical dredging methods and data from the Illinois Waterway as performed by the U.S. Army Corps of Engineers, Rock Island District. The equipment included in this study is a 16-inch cutterhead pipeline dredge and a mechanical bucket dredge used during the 2005 dredging season on the Illinois Waterway. Considerable effort has been put forth to identify and reduce environmental impacts from dredging operations. Though environmental impacts of dredging have been studied no efforts have been applied to the evaluation of air emissions from comparable types of dredging equipment, as in this study. By identifying the type of dredging equipment with the lowest air emissions, when cost, site conditions, and equipment availability are comparable, adverse environmental impacts can be minimized without compromising the dredging project. A total of 48 scenarios were developed by varying the dredged material quantity, transport distance, and production rates. This produced an “envelope” of results applicable to a broad range of site conditions. Total diesel fuel consumed was calculated using standard cost estimating practices as defined in the U.S. Army Corps of Engineers Construction Equipment Ownership and Operating Expense Schedule (USACE, 2005). The diesel fuel usage was estimated for all equipment used to mobilize and/or operate each dredging crew for every scenario. A Limited Life Cycle Assessment (LCA) was used to estimate the air emissions from two comparable dredging operations utilizing SimaPro LCA software. An Environmental Impact Single Score (EISS) was the SimaPro output selected for comparison with the cost per CY of dredging, potential production rates, and transport distances to identify possible decision points. The total dredging time was estimated for each dredging crew and scenario. An average hourly cost for both dredging crews was calculated based on Rock Island District 2005 dredging season records (Graham 2007/08). The results from this study confirm commonly used rules of thumb in the dredging industry by indicating that mechanical bucket dredges are better suited for long transport distances and have lower air emissions and cost per CY for smaller quantities of dredged material. In addition, the results show that a cutterhead pipeline dredge would be preferable for moderate and large volumes of dredged material when no additional booster pumps are required. Finally, the results indicate that production rates can be a significant factor when evaluating the air emissions from comparable dredging equipment.
Resumo:
v.19:no.2 (1897)
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
F only available in microfiche.
Resumo:
This report gives biological and physical oceanographic data from baseline work, and studies of dredged and undredged sediments before and after dredging (9-meter contour) for beach nourishment at Panama City Beach, Florida. These studies were designed to show major short-term environmental effects of offshore dredging and included analyses of hydrology, sediments, and benthos. (Author).
Resumo:
Cover title.
Resumo:
Cover title.
Resumo:
"August 1996."