938 resultados para Cost Control


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Numerous techniques have been developed to control cost and time of construction projects. However, there is limited research on issues surrounding the practical usage of these techniques. To address this, a survey was conducted on the top 150 construction companies and 100 construction consultancies in the UK aimed at identifying common project control practices and factors inhibiting effective project control in practice. It found that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The results from the need to develop methodologies for performing cost analysis in developing countries, principally in the region of Latin America, were studied. It, furthermore, serves to generate knowledge from an economic evaluation in order to support decision-making related to the organization of health systems, particularly in the efficient use of resources which are allocated for the provision of medical services. Two chronic diseases (breast cancer and cardiac valve disease) and two infections (enteritis and bronchopneumonia) were selected for the study. The results recommend the use of a valid methodology for economic cost analysis of any disease to be studied and the use of this information in the decision-making process.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

OBJECTIVE: The assessment of an easy to prepare and low cost control material for Hematology, available for manual and automated methods. MATERIAL AND METHOD: Aliquots of stabilized whole blood were prepared by partial fixation with aldehydes; the stability at different temperatures (4. 20 and 37 °C) during periods of up to 8-9 weeks and aliquot variability with both methods were controlled. RESULTS: Aliquot variability with automated methods at day 1, expressed as CV% (coefficient of variation) was: white blood cells (WBC) 2.7, red blood cells (RBC) 0.7, hemoglobin (Hb) 0.6, hematocrit (Hct) 0.7, mean cell volume (MCV) 0.3, mean cell hemoglobin (MCH) 0.6, mean cell hemoglobin concentration (MCHC) 0.7, and platelets (PLT) 4.6. The CV (coefficient of variation) percentages obtained with manual methods in one of the batches were: WBC 23, Hct 2.8, Hb 4.5, MCHC 5.9, PLT 41. Samples stored at 4ºC and 20ºC showed good stability, only a very low initial hemolysis being observed, whereas those stored at 37ºC deteriobed a rapidly (metahemoglobin formation, aggregation of WBC and platelets, as well as alteration of erythrocyte indexes). CONCLUSIONS: It was confirmed that, as long as there is no exposure to high temperatures during distribution, this material is stable, allowing assessment, both esternal and internal, for control purposes, with acceptable reproductivity, both for manual and auttomatic methods.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Description of a costing model developed by digital production librarian to determine the cost to put an item into the Claremont Colleges Digital Library at the Claremont University Consortium. This case study includes variables such as material types and funding sources, data collection methods, and formulas and calculations for analysis. This model is useful for grant applications, cost allocations, and budgeting for digital project coordinators and digital library projects.