336 resultados para Contractor
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
Design management research usually deals with the processes within the professional design team and yet, in the UK, the volume of the total project information produced by the specialist trade contractors equals or exceeds that produced by the design team. There is a need to understand the scale of this production task and to plan and manage it accordingly. The model of the process on which the plan is to be based, while generic, must be sufficiently robust to cover the majority of instances. An approach using design elements, in sufficient depth to possibly develop tools for a predictive model of the process, is described. The starting point is that each construction element and its components have a generic sequence of design activities. Specific requirements tailor the element's application to the building. Then there are the constraints produced due to the interaction with other elements. Therefore, the selection of a component within the element may impose a set of constraints that will affect the choice of other design elements. Thus, a design decision can be seen as an interrelated element-constraint-element (ECE) sub-net. To illustrate this approach, an example of the process within precast concrete cladding has been used.
Resumo:
A proper method to assess contractor competitiveness is important both for assisting clients in the selection of proper contractors and for assisting contractors in the development of more competitive bidding strategies. Previous studies have identified various indicators for assessing contractor competitiveness, and several assessment methods have been introduced. Nevertheless, these studies are limited because they are unable to tell which indicators are more important in different market environments. This paper identifies the key competitiveness indicators �KCIs� for assessing contractor competitiveness in the Chinese construction market. An index value is used to indicate the relative significance of various competitiveness indicators based on which KCIs are identified. The data applied in this study are from a survey of the construction industry in mainland China. The research findings provide valuable information for both existing businesses and the construction professionals who plan to compete for construction works in the Chinese market. The study provides useful references for further studies that compare the KCIs used in the Chinese construction industry and those used in other construction industries.
Resumo:
Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the five remaining projects were calculated by contractors. Cost estimates prepared by contractors seemed to be closer to actual costs than estimates calculated by consultants. Projects estimated by consultants experienced an average cost overrun of 40% and time overrun of 62% whereas projects priced by contractors experienced an average cost overrun of 6% and time overrun of 41%. It seemed that contractors had a better understanding of the actual construction processes and a clearer expectation of the needs of the client hence an ability to calculate estimates that were closer to reality. Construction clients in Ghana should rely on contractors for more realistic cost estimates as estimates by consultants may be inaccurate. Where consultants are employed, an allowance of up 40% should be added to the estimated costs as a margin for inaccuracy.
Resumo:
Over the past decade, the independent sales contractor (ISC) has emerged as both an important distribution channel and a management challenge. This study makes two contributions to this evolving field. First, it explores the interrelations of the psychological contract with sales performance, voluntary turnover and organisational advocacy of ISCs, which have hitherto been largely unexplored. Second, it examines differences between high- and low-performing sales contractors on these linkages, due to findings in the literature that a small number of sales contractors often achieve a majority of sales. Based on survey data as well as 7 years of contractor-level data related to sales performance and voluntary turnover (n = 189), results indicate that psychological contract fulfilment and perceived dependency are important determinants of subsequent sales performance, voluntary turnover and organisational advocacy, with significant differences reported between high- and low-performing ISCs. A notable finding pertinent for sales managers responsible for managing ISCs is that high-performing sales contractors are motivated by psychological contract fulfilment and a low perception of dependency, while low-performing sales contractors are more likely to act as advocates for the firm due to perceived dependency, but may concurrently engage in organisational advocacy as a means to leave the firm.
Resumo:
Beryllium is a widely distributed, highly toxic metal. When beryllium particulates enter the body, the body's defense mechanisms are engaged. When the body's defenses cannot easily remove the particulates, then a damage and repair cycle is initiated. This cycle produces chronic beryllium disease (CBD), a progressive, fibrotic respiratory involvement which eventually suffocates exposed individuals. ^ Beryllium disease is an occupational disease, and as such it can be prevented by limiting exposures. In the 1940s journalists reported beryllium deaths at Atomic Energy Commission (AEC) facilities, the Department of Energy's (DOE) predecessor organization. These reports energized public pressure for exposure limits, and in 1949 AEC implemented a 2 μg/m3 permissible exposure limit (PEL). ^ The limits appeared to stop acute disease. In contrast, CBD has a long latency period between exposure and diagnosable disease, between one and thirty years. The lack of immediate adverse health consequences masked the seriousness of chronic disease and pragmatically removed CBD from AEC/DOE's political concern. ^ Presently the PEL for beryllium at DOE sites remains at 2 μg/m 3. This limit does not prevent CBD. This conclusion has long been known, although denied until recently. In 1999 DOE acknowledged the limit's ineffectiveness in its federal regulation governing beryllium exposure, 10 CFR 850. ^ Despite this admission, the PEL has not been reduced. The beryllium manufacturer and AEC/DOE have a history of exerting efforts to maintain and protect the status quo. Primary amongst these efforts has been creation and promotion of disinformation within peer reviewed health literature which discusses beryllium, exposures, health effects and treatment, and targeting graduate school students so that their perspective is shaped early. ^ Once indoctrinated with incorrect information, professionals tend to overlook aerosol and respiratory mechanics, immunologic and carcinogenic factors. They then apply tools and perspectives derived from the beryllium manufacturer and DOE's propaganda. Conclusions drawn are incorrect. The result is: health research and associated policy is conducted with incorrect premises. Effective disease management practices are not implemented. ^ Public health protection requires recognition of the disinformation and its implications. When disinformation is identified, then effective health policies and practices can be developed and implemented. ^
Resumo:
"November 1964."
Resumo:
Mode of access: Internet.
Resumo:
At head of title: Engineering and design.
Resumo:
Mode of access: Internet.