954 resultados para Construction industry - Cost effectiveness


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

If there is a silver lining to the adversarial, dispute-prone nature of the building and construction industry, it can be found in the concomitant rise of innovative dispute resolution mechanisms. Time, cost and relationship concerns have meant that the formal adversarial system holds little appeal for disputing parties. As these alternative forms of dispute avoidance/resolution have matured in Australia over the last 20 years, attention has turned to the key characteristics of each process and their suitability to the building and construction industry. This article considers the role of dispute review boards (DRBs) and mediation as two alternative methods for avoiding/resolving disputes in the construction industry. Criteria are established for evaluating the efficacy of these procedures and their sensitivity to the needs of construction industry disputants. The ultimate conclusion reached is that DRBs represent a powerful, yet underutilised dispute resolution tool in Australia, and possess many industry-specific advantages that more traditional forms of alternative dispute resolution (particularly mediation) do not provide.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Building Information Modelling (BIM) has been regarded as a one stop shop capable of addressing the ills of the construction industry. Yet, while some firms have accepted BIM as a new way to work and gone on to record success, others (which have not so done) have raised such questions as: ‘How is BIM defined? Is it a tool or a process? Which kinds and sizes of organisations stand to benefit from BIM?’ These questions form the basis of this research. Hence, having explored the relevant body of literature, this research investigates three organisations within the UK – described as the earliest adopters of BIM – and considers how they have fared in terms of project performance in the years since adopting BIM; focusing on project cost, delivery time and quality achievement. This investigation also probed two of the leading voices in BIM in the UK in search of the much needed answers. The findings of the research show that successful projects executed in the organisations that have used BIM is predicated on its adoption as a process, rather than as a tool of technology; a process that changes the way work in the construction industry is typically done. Moreover, the successes recorded in the firms researched give credence to project success consequent upon adopting BIM. Nevertheless, the findings of this research show that the cornerstone of this success is leadership-driven innovation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While comparing both the size and structure between the UK and Australian construction industries, this study reveals that the UK construction industry is about two and a half times larger than the Australian construction industry, and both industries are dominated by the proportion of small firms. The issue of fragmentation is characteristic of the construction industries in these two countries, and beyond. This study then develops a self recruiting-subletting cost indifference point model to explain why fragmentation occurs. Although the high proportion of small firms in the construction industry has been criticised as it prevents the exploitation of economies of scale, the self recruiting-subletting cost indifference point model theoretically proposes that subletting is usually profitable for construction firms. Thus the size distribution of the construction industry has a propensity to skew towards small firms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trust is an underlying psychological condition that can cause cooperation or risk-taking. Trust is considered as a predominant feature and a central mechanism in business transactions, especially among Chinese. Trust-based relationships create advantages in conducting business such as lowering cost, shortening duration, and improving performance. Indispensable conditions for trust to arise are relationships and risks. Different risks surface as a result of different levels of relationships. Sustained trust is therefore fostered by various means to counterbalance those risks. In order to assess the links between distinct trust-related features, a model is constructed and tested through a questionnaire survey in China. The findings generally support the model in terms of explaining the dominant relationships, inherent risks, and trust-fostering tools. It is recommended that firms adopt the refined model and utilize successful practices verified in this paper to foster trust and relationships and in turn secure project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many parties involved in the construction industry have convinced the importance of electronic commerce (EC) for improving business processes, cutting cost, and providing comprehensive information. However, currently the application of EC is relatively limited and ineffective. These systems are always non-interoperable which creates problems for the stakeholders in construction projects. This paper aims to analyze the E-commerce application system and develop a system for the parties to collaborate and share information effectively. In this paper, four information flats are summarized based on the literature survey and field investigation, and the information integration model for EC is built up using IFC and XML. It should provide a useful reference for China to promote the development of EC in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Introduction: Cost-effectiveness analyses are important tools in efforts to prioritise interventions for obesity prevention.
Modelling facilitates evaluation of multiple scenarios with varying assumptions. This study compares the cost-effectiveness of
conservative scenarios for two commonly proposed policy-based interventions: front-of-pack ‘traffic-light’ nutrition labelling
(traffic-light labelling) and a tax on unhealthy foods (‘junk-food’ tax).
Methods: For traffic-light labelling, estimates of changes in energy intake were based on an assumed 10% shift in consumption
towards healthier options in four food categories (breakfast cereals, pastries, sausages and preprepared meals) in 10% of adults. For the ‘junk-food’ tax, price elasticities were used to estimate a change in energy intake in response to a 10% price increase in seven food categories (including soft drinks, confectionery and snack foods). Changes in population weight and body mass index by sex were then estimated based on these changes in population energy intake, along with subsequent impacts on disability-adjusted life years (DALYs). Associated resource use was measured and costed using pathway analysis, based on a health sector perspective (with some industry costs included). Costs and health outcomes were discounted at 3%. The cost-effectiveness of each intervention was modelled for the 2003 Australian adult population.
Results: Both interventions resulted in reduced mean weight (traffic-light labelling: 1.3 kg (95% uncertainty interval (UI): 1.2;
1.4); ‘junk-food’ tax: 1.6 kg (95% UI: 1.5; 1.7)); and DALYs averted (traffic-light labelling: 45 100 (95% UI: 37 700; 60 100);
‘junk-food’ tax: 559 000 (95% UI: 459 500; 676 000)). Cost outlays were AUD81 million (95% UI: 44.7; 108.0) for traffic-light
labelling and AUD18 million (95% UI: 14.4; 21.6) for ‘junk-food’ tax. Cost-effectiveness analysis showed both interventions were
‘dominant’ (effective and cost-saving).
Conclusion: Policy-based population-wide interventions such as traffic-light nutrition labelling and taxes on unhealthy foods are
likely to offer excellent ‘value for money’ as obesity prevention measures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Risks exist in every form of construction project. The risks associated with construction projects are often diverse and varied and the management of these risks is nowadays considered compulsory in order to achieve project success. This paper analyses the diverse strategies of risk mitigation that have been employed in construction projects. These strategies are classified into analysed categories of procurement strategies. contingency and co-operative approach along with the utilisation of a designated risk manager. The analysis showed that in order to improve risk mitigation within the construction industry, there is a requirement tor an industry based standard. This standard will improve the efficiency and effectiveness of the risk mitigation response technique to risk management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lithographed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis deals with the problems associated with the planning and control of production, with particular reference to a small aluminium die casting company. The main problem areas were identified as: (a) A need to be able to forecast the customers demands upon the company's facilities. (b) A need to produce a manufacturing programme in which the output of the foundry (or die casting section) was balanced with the available capacity in the machine shop. (c) The need to ensure that the resultant system enabled the company's operating budget to have a reasonable chance of being achieved. At the commencement of the research work the major customers were members of the automobile industry and had their own system of forecasting, from which they issued manufacturing schedules to their component suppliers, The errors in the forecast were analysed and the distributions noted. Using these distributions the customer's forecast was capable of being modified to enable his final demand to be met with a known degree of confidence. Before a manufacturing programme could be developed the actual manufacturing system had to be reviewed and it was found that as with many small companies there was a remarkable lack of formal control and written data. Relevant data with regards to the component and the manufacturing process had therefore to be collected and analysed. The foundry process was fixed but the secondary machining operations were analysed by a technique similar to Component Flow Analysis and as a result the machines were arranged in a series of flow lines. A system of manual production control was proposed and for comparison, a local computer bureau was approached and a system proposed incorporating the production of additional management information. These systems are compared and the relative merits discussed and a proposal made for implementation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis examines the ways that libraries have employed computers to assist with housekeeping operations. It considers the relevance of such applications to company libraries in the construction industry, and describes more specifically the development of an integrated cataloguing and loan system. A review of the main features in the development of computerised ordering, cataloguing and circulation control systems shows that fully integrated packages are beginning to be completed, and that some libraries are introducing second generation programs. Cataloguing is the most common activity to be computerised, both at national and company level. Results from a sample of libraries in the construction industry suggest that the only computerised housekeeping system is at Taylor Woodrow. Most of the firms have access to an in-house computer, and some of the libraries, particularly those in firms of consulting engineers, might benefit from computerisation, but there are differing attitudes amongst the librarians towards the computer. A detailed study of the library at Taylor Woodrow resulted in a feasibility report covering all the areas of its activities. One of the main suggestions was the possible use of a computerised loans and cataloguing system. An integrated system to cover these two areas was programmed in Fortran and implemented. This new system provides certain benefits and saves staff time, but at the cost of time on the computer. Some improvements could be made by reprogramming, but it provides a general system for small technical libraries. A general equation comparing costs for manual and computerised operations is progressively simplified to a form where the annual saving from the computerised system is expressed in terms of staff and computer costs and the size of the library. This equation gives any library an indication of the savings or extra cost which would result from using the computerised system.