891 resultados para Construction and demolition waste
Resumo:
The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.
Resumo:
Construction and demolition waste can contain considerable amounts of polyvinyl chloride (PVC). This paper describes a study of the recycling of PVC pipes collected from such waste materials. In a sorting facility for the specific disposal of construction and demolition waste, PVC was found to represent one-third of the plastics separated by workers. Pipes were sorted carefully to preclude any possible contamination by poly(ethylene terephthalate) (PET) found in the waste. The material was ground into two distinct particle sizes (final mesh of 12.7 and 8 mm), washed, dried and recycled. The average formulation of the pipes was determined based on ash content tests and used in the fabrication of a similar compound made mainly of virgin PVC. Samples of recycled pipes and of compound based on virgin material were subjected to tensile and impact tests and provided very similar results. These results are a good indication of the application potential of the recycled material and of the fact that longer grinding to obtain finer particles is not necessarily beneficial.
Resumo:
Concern for the environment has lately heightened awareness about the need for recycling in the construction industry. However, some standards, such as the Spanish standard, only accept the recycling of aggregates derived from concrete, which limits the extensive use of construction and demolition waste, which are produced in much bigger volumes. The aim of this work was to explore the possibility of using recycled mixed aggregates (RMA) in the preparation of precast non-structural concretes. To that end different percentages of natural aggregate were replaced by RMA in non-structural elements (25, 50, 75 and 100%). Contents of cement, water, and the dosages commonly used by companies were unchanged by the introduction of RMA. The characterization of the prepared elements has been done using the specific tests for each type of non-structural element (terrazzo for indoor use, hollow tiles, kerbstones and paving blocks): compression and flexural strength, water absorption, dimensional tolerances, abrasion and slipping resistance. The paving blocks, kerbstones, and hollow tiles prepared were tested for 360 days. The stability of the tested properties confirmed the possibility of using these wastes on an industrial scale satisfying the standard requirements. However, the surface of terrazzo with RMA is not as good as that prepared with natural aggregate.
Resumo:
Current EU Directives force the Member States to assure by 2020 that 70% of the Construction and Demolition (C&D) waste is recovered instead of landfilled. While some countries have largely achieved this target, others still have a long way to go. For better understanding the differences arising from local disparities, six factors related to technical, economic, legislative and environmental aspects have been identified as crucial influences in the market share of C&D waste recycling solutions. These factors are able to identify the causes that limit the recycling rate of a certain region. Moreover, progress towards an efficient waste management can vary through the improvement of a single factor. This study provides the background for further fine-tuning the factors and their combination into a mathematical model for assessing the market share of C&D recycling solutions.
Resumo:
There have been considerable developments in Merseyside over the last fifteen years with regards to the commercialisation of recycled demolition aggregate. Liverpool is an urban region that at the time was undergoing regeneration. This required the demolition of old infrastructure. Subsequent reconstruction required new construction materials. A project started in 2001 to investigate the economics, practicalities and technicalities of using recycled demolition aggregates in concrete precast products. It was estimated that if all six demolition contractors around Liverpool worked round the clock (i.e. assuming there was enough feed material) they would still have found it difficult to maintain the required supplies for a single precast factory. Investment in equipment was therefore required to guarantee supply and improve the quality of the recycled demolition aggregate. The market forces and the incentives/drivers for construction companies to adopt sustainable practises have encouraged investment of several million pounds to be made in new recycling plants and has resulted in ‘urban quarries’. This paper describes the developments in recycling of construction and demolition waste over the last decade in Merseyside and shows that recycling is not only sustainable but also profitable.
Resumo:
Carbon taxation governance is becoming increasingly popular, further evolving the polluter pays concept already well established in the built environment as a mechanism to controlling and licensing waste generation. This paper presents an explanation of property asset ‘regeneration reuse’ principles following deconstruction, which reduce waste generation associated with the process of demolition, construction and operation. An analysis is made of strategies in Australia and the United Kingdom, comparing jurisdiction targets pertaining to construction and demolition waste that encourage ‘regeneration reuse’. From examination of applicable Australian and United Kingdom legislation, strategic, fiscal and policy that influence on the 'regeneration reuse' of property assets, an evaluation to the variety of issues relevant to waste and resource management practices is reached. The paper concludes that a systematic evaluation framework to selecting building components and structures suitable for reuse after deconstruction must be considered in legislation.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
This original study creates a philosophy of regeneration reuse, which is a conceptual framework that utilises construction and demolition waste products by building component, relocation and adaptive reuse. Case studies from the greater Brisbane, wider southeast Queensland region and greater London area are used to demonstrate the principles of regeneration reuse through research activities, analysis and evaluation. The regeneration reuse conceptual process draws upon assessing embodied carbon and sustainable benefits to deconstruct rather than destruct, and consider alternative options to waste treatment technologies in the built environment. The importance of waste management is examined, specifically the impacts of governance to the principles of regeneration reuse through analysis of legislation in the Australian and UK jurisdictions. Design process considerations when incorporating the principles of regeneration reuse are defined, and phasing and staging assessment explored to determine the most effective point of intervention in the design process to include waste management strategies.
Resumo:
A study undertaken at the University of Liverpool has investigated the potential for using construction and demolition waste (C&DW) as aggregate in the manufacture of a range of precast concrete products, i.e. building and paving blocks and pavement flags. Phase II, which is reported here, investigated concrete paving blocks. Recycled demolition aggregate can be used to replace newly quarried limestone aggregate, usually used in coarse (6 mm) and fine (4 mm-to-dust) gradings. The first objective, as was the case with concrete building blocks, was to replicate the process used by industry in fabricating concrete paving blocks in the laboratory. The compaction technique used involved vibration and pressure at the same time, i.e. a vibro-compaction technique. An electric hammer used previously for building blocks was not sufficient for adequate compaction of paving blocks. Adequate compaction could only be achieved by using the electric hammer while the specimens were on a vibrating table. The experimental work involved two main series of tests, i.e. paving blocks made with concrete- and masonry-derived aggregate. Variables that were investigated were level of replacement of (a) coarse aggregate only, (b) fine aggregate only, and (c) both coarse and fine aggregate. Investigation of mechanical properties, i.e. compressive and tensile splitting strength, of paving blocks made with recycled demolition aggregate determined levels of replacement which produced similar mechanical properties to paving blocks made with newly quarried aggregates. This had to be achieved without an increase in the cement content. The results from this research programme indicate that recycled demolition aggregate can be used for this new higher value market and therefore may encourage demolition contractors to develop crushing and screening facilities for this. (C) 2011 Published by Elsevier Ltd.
Resumo:
A study undertaken at the University of Liverpool has investigated the potential for using recycled demolition aggregate in the manufacture of precast concrete building blocks. Recycled aggregates derived from construction and demolition waste (C&DW) can be used to replace quarried limestone aggregate, usually used in coarse (6 mm) and fine (4 mm-to-dust) gradings. The manufacturing process used in factories, for large-scale production, involves a “vibro-compaction” casting procedure, using a relatively dry concrete mix with low cement content (˜100 kg/m3). Trials in the laboratory successfully replicated the manufacturing process using a specially modified electric hammer drill to compact the concrete mix into oversize steel moulds to produce blocks of the same physical and mechanical properties as the commercial blocks. This enabled investigations of the effect of partially replacing newly quarried with recycled demolition aggregate on the compressive strength of building blocks to be carried out in the laboratory. Levels of replacement of newly quarried with recycled demolition aggregate have been determined that will not have significant detrimental effect on the mechanical properties. Factory trials showed that there were no practical problems with the use of recycled demolition aggregate in the manufacture of building blocks. The factory strengths obtained confirmed that the replacement levels selected, based on the laboratory work, did not cause any significant strength reduction, i.e. there was no requirement to increase the cement content to maintain the required strength, and therefore there would be no additional cost to the manufacturers if they were to use recycled demolition aggregate for their routine concrete building block production.
Resumo:
A study undertaken at the University of Liverpool has investigated the potential for using construction and demolition waste (C&DW) derived aggregate in the manufacture of a range of precast concrete products, i.e. building and paving blocks and pavement flags. Phase III, which is reported here, investigated
concrete pavement flags. This was subsequent to studies on building and paving blocks. Recycled demolition aggregate can be used to replace newly quarried limestone aggregate, usually used in coarse (6 mm) and fine (4 mm-to-dust) gradings. The first objective was, as was the case with concrete building
and paving blocks, to replicate the process used by industry in fabricating concrete pavement flags in the laboratory. The ‘‘wet’’ casting technique used by industry for making concrete flags requires a very workable mix so that the concrete flows into the mould before it is compressed. Compression squeezes out water from the top as well as the bottom of the mould. This industrial casting procedure was successfully replicated in the laboratory by using an appropriately modified cube crushing machine and a special mould typical of what is used by industry. The mould could be filled outside of the cube crushing machine and then rolled onto a steel frame and into the machine for it to be compressed. The texture and mechanical properties of the laboratory concrete flags were found to be similar to the factory ones. The experimental work involved two main series of tests, i.e. concrete flags made with concrete- and
masonry-derived aggregate. Investigation of flexural strength was required for concrete paving flags. This is different from building blocks and paving blocks which required compressive and tensile splitting strength respectively. Upper levels of replacement with recycled demolition aggregate were determined
that produced similar flexural strength to paving flags made with newly quarried aggregates, without requiring an increase in the cement content. With up to 60% of the coarse or 40% of the fine fractions replaced with concrete-derived aggregates, the target mean flexural strength of 5.0 N/mm2 was still
achieved at the age of 28 days. There was similar detrimental effect by incorporating the fine masonry-derived aggregate. A replacement level of 70% for coarse was found to be satisfactory and also conservative. However, the fine fraction replacement could only be up to 30% and even reduced to 15% when used for mixes where 60% of the coarse fraction was also masonry-derived aggregate.
Resumo:
The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate
Resumo:
The purpose of this work is to find a methodology in order to make possible the recycling of fines (0 - 4 mm) in the Construction and Demolition Waste (CDW) process. At the moment this fraction is a not desired by-product: it has high contaminant content, it has to be separated from the coarse fraction, because of its high water absorption which can affect the properties of the concrete. In fact, in some countries the use of fines recycled aggregates is highly restricted or even banned. This work is placed inside the European project C2CA (from Concrete to Cement and Clean Aggregates) and it has been held in the Faculty of Civil Engineering and Geosciences of the Technical University of Delft, in particular, in the laboratory of Resources And Recycling. This research proposes some procedures in order to close the loop of the entire recycling process. After the classification done by ADR (Advanced Dry Recovery) the two fractions "airknife" and "rotor" (that together constitute the fraction 0 - 4 mm) are inserted in a new machine that works at high temperatures. The temperatures analysed in this research are 600 °C and 750 °C, cause at that temperature it is supposed that the cement bounds become very weak. The final goal is "to clean" the coarse fraction (0,250 - 4 mm) from the cement still attached to the sand and try to concentrate the cement paste in the fraction 0 - 0,250 mm. This new set-up is able to dry the material in very few seconds, divide it into two fractions (the coarse one and the fine one) thanks to the air and increase the amount of fines (0 - 0,250 mm) promoting the attrition between the particles through a vibration device. The coarse fraction is then processed in a ball mill in order to improve the result and reach the final goal. Thanks to the high temperature it is possible to markedly reduce the milling time. The sand 0 - 2 mm, after being heated and milled is used to replace 100% of norm sand in mortar production. The results are very promising: the mortar made with recycled sand reaches an early strength, in fact the increment with respect to the mortar made with norm sand is 20% after three days and 7% after seven days. With this research it has been demonstrated that once the temperature is increased it is possible to obtain a clean coarse fraction (0,250 - 4 mm), free from cement paste that is concentrated in the fine fraction 0 - 0,250 mm. The milling time and the drying time can be largely reduced. The recycled sand shows better performance in terms of mechanical properties with respect to the natural one.
Resumo:
On a global level the population growth and increase of the middle class lead to a growing demand on material resources. The built environment has an enormous impact on this scarcity. In addition, a surplus of construction and demolition waste is a common problem. The construction industry claims to recycle 95% of this waste but this is in fact mainly downcycling. Towards the circular economy, the quality of reuse becomes of increasing importance. Buildings are material warehouses that can contribute to this high quality reuse. However, several aspects to achieve this are unknown and a need for more insight into the potential for high quality reuse of building materials exists. Therefore an instrument has been developed that determines the circularity of construction waste in order to maximise high quality reuse. The instrument is based on three principles: ‘product and material flows in the end of life phase’, ‘future value of secondary materials and products’ and ‘the success of repetition in a new life cycle’. These principles are further divided into a number of criteria to which values and weighting factors are assigned. A degree of circularity can then be determined as a percentage. A case study for a typical 70s building is carried out. For concrete, the circularity is increased from 25% to 50% by mapping out the potential for high quality reuse. During the development of the instrument it was clarified that some criteria are difficult to measure. Accurate and reliable data are limited and assumptions had to be made. To increase the reliability of the instrument, experts have reviewed the instrument several times. In the long-term, the instrument can be used as a tool for quantitative research to reduce the amount of construction and demolition waste and contribute to the reduction of raw material scarcity.
Resumo:
This research project aims to improve economic, social and environmental sustainability of the pre-cast concrete and construction and demolition waste supply chains through the development, trial and evaluation of an innovative supply chain management strategy. The long-term goals are to improve competitive behaviour and market sector performance and improve business process efficiency and effectiveness of public sector program delivery by influencing policy development, changing organisational behaviour and implementation development to achieve more economic, social and environmental sustainable markets.