968 resultados para Canadian Niagara Power Company


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Appears to be an engineer's drawing of the Hydro Station. It is a cross-section view of the interior.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Plan and profile of discharge tunnel along Niagara River. The horizontal scale is 1 inch = 100 feet, the vertical scale is 1 inch = 40 feet. The drawing is dated November 7, 1902.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Drawing by consulting engineer dated October 19, 1901. Scale is noted as 1/4 inch = 1 foot.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Drawing of "Section thru Wheelpit" dated September 1925. Shows unit no.1 through unit no.11, power house floor and water surface.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Engineer drawing (untitled), some of the labels read "exciter chamber", "fore bay", "power house floor".

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men (unknown) standing in the tunnel wearing hard hats.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A large group of men in hard hats in the tunnel. The names of the men are unknown.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Four men standing in hydro tunnel.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from William Lyon Mackenzie King to The Niagara Power Company in the year 1903. Mackenzie King is Deputy Minister of Labour for the Department of Labour Canada and in this letter he discusses issues with importing of men from the United States to Canada for employment. The letter warns of penalty if found guilty of unlawfully importing men for employment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from 2nd Vice President and General Manager of Canadian General Electric Company, Frederic Nicholls to W. B. Rankine regarding a bid for contract. The letter mentions that the bid for two alternating generators for the Canadian side of Niagara Falls was won by Westinghouse Eletric and Manufacturing Co. Nicholls also mentions that there will be other opportunites to win contracts as more machines are required. Nicholls also implies that Westinghouse may have bid under cost in an effort to secure the first of many contracts with the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Caption title.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Two photographs of turbine drawings from the year 1903. The first drawing is titled "10000HP Turbines. Canadian Niagara Power Company. General Arrangement of Shaft." It was last revised 18 May, 1903. The second drawing is titled "10000HP Turbines Canadian Niagara Power Company. Cross Section of Turbine" This drawing revised 6 May, 1903 and 26 June, 1903.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from Colonel Albert D. Shaw to Francis Lynde Stetson dated March 31, 1892. The letter is in regards to correspondence with the Attorney General in efforts to expedite the passing of an Act through Ontario Parliament. The act was introduced a week later (April 6, 1892) confirming the agreement between the Queen Vctoria Niagara Falls Park and the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from the office of Prime Minister Robert L. Borden to A. Monro Grier (Corporate Secretary) in regards to a pass. The pass, sent to Borden in 1915, would give him access to the Power House at the Canadian Niagara Power Company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A letter from Second V.P. Frederic Nicholls of Canadian General Electric Co. to W.B. Rankine in regards to transformers. The Canadian Niagara Power Co. has agreed to an order of nine transformers (1250 Killowatt) to be installed in the Power House at Niagara Falls. The transformers will cost the Canadian Niagara Power Company forty three thousand two hundred dollars.