989 resultados para Building Capability
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically to support Jisc’s members in the area of Digital Leadership. It is one example of the base model being used in a particular context and is not meant to be definitive.
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically for learners. It is an update on the earlier ‘7 elements of digital literacy’ model (2009) and has many continuities with this framework. This version was produced in response to feedback that the base model alone does not provide enough detail to support embedding into practice. However, it is an example of how the base model could be used to define the digital capabilities of learners and is meant to be adapted to suit specific settings.
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically to support Jisc’s members in the area of Digital Leadership. It is one example of the base model being used in a particular context and is not meant to be definitive.
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically for research students and research sta . It is an update on the earlier ‘7 elements of digital literacy’ model (2009) and has many continuities with this framework. It is one example of how the base model is being used.
Resumo:
A digital capability framework which describes the skills needed by staff in a wide range of academic, administrative and professional roles to thrive in a digital environment. This will provide a structure to help managers and individuals understand what is needed and supports the development of tools. We have produced an initial model of the framework which describes digital capability as six overlapping elements.
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, specifically for teaching sta or for academic sta in their teaching role. It is an update on the earlier ‘7 elements of digital literacy’ model (2009) and has many continuities with this framework. This version was produced in response to feedback that the base model alone does not provide enough detail to support embedding into practice. However, it is an example of how the base model could be used to define the digital capabilities of teaching sta and is meant to be adapted to suit specific settings.
Resumo:
Synchronous generators are essential components of electric power systems. They are present both in hydro and thermal power plants, performing the function of converting mechanical into electrical energy. This paper presents a visual approach to manipulate parameters that affect operation limits of synchronous generators, using a specifically designed software. The operating characteristics of synchronous generators, for all possible modes of operation, are revised in order to link the concepts to the graphic objects. The approach matches the distance learning tool requirements and also enriches the learning process by developing student trust and understanding of the concepts involved in building synchronous machine capability curves. © 2012 IEEE.
Resumo:
"December 8, 1995."
Resumo:
Kralijc’s (1983) purchasing portfolio approach holds that different types of purchases need different sourcing strategies, underpinned by distinct sets of resources and practices. The approach is widely deployed in business and extensively researched, and yet little research has been conducted on how knowledge and skills vary across a portfolio of purchases. This study extends the body of knowledge on purchasing portfolio management, and its application in the strategic development of purchasing in an organization, and on human resource management in the purchasing function. A novel approach to profiling purchasing skills is proposed, which is well suited to dynamic environments which require flexibility. In a survey, experienced purchasing personnel described a specific purchase and profiled the skills required for effective performance in purchasing that item. Purchases were categorized according to their importance to the organization (internally-oriented evaluation of cost and production factors) and to the supply market (externally-oriented evaluation of commercial risk and uncertainty). Through cluster analysis three key types of purchase situations were identified. The skills required for effective purchasing vary significantly across the three clusters (for 22 skills, p<0.01). Prior research shows that global organizations use the purchasing portfolio approach to develop sourcing strategies, but also aggregate analyses to inform the design of purchasing arrangements (local vs global) and to develop their improvement plans. Such organizations would also benefit from profiling skills by purchase type. We demonstrate how the survey can be adapted to provide a management tool for global firms seeking to improve procurement capability, flexibility and performance.
Resumo:
This is a version of the Jisc ‘Six Elements of Digital Capabilities’ model, developed to support student-facing sta working in Careers and Employability roles and curriculum sta working to embed employability issues into the curriculum. It draws on the work of the Jisc Developing Student Employability project e.g. on the model of the ‘employable student’ produced by Peter Chatterton for that project.
Resumo:
The construction industry has adapted information technology in its processes in terms of computer aided design and drafting, construction documentation and maintenance. The data generated within the construction industry has become increasingly overwhelming. Data mining is a sophisticated data search capability that uses classification algorithms to discover patterns and correlations within a large volume of data. This paper presents the selection and application of data mining techniques on maintenance data of buildings. The results of applying such techniques and potential benefits of utilising their results to identify useful patterns of knowledge and correlations to support decision making of improving the management of building life cycle are presented and discussed.
Resumo:
This report presents the current state and approach in Building Information Modelling (BIM). The report is focussed at providing a desktop audit of the current state and capabilities of the products and applications supporting BIM. This includes discussion on BIM model servers as well as discipline specific applications, for which the distinction is explained below. The report presented here is aimed at giving a broad overview of the tools and applications with respect to their BIM capabilities and in no way claims to be an exhaustive report for individual tools. Chapter 4 of the report includes the research and development agendas pertaining to the BIM approach based on the observations and analysis from the desktop audit.
Resumo:
Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.