806 resultados para Audiovisual projects management


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Ciência da Informação - FFC

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Land use management has becoming a very important activity. Aerial photo interpretation is a basic resource and constitutes in a technique which enables infinite refining. Agricultural development and land use require a careful initial planning in order not only to protect them against superficial changing provoked by natural phenomenon but also to gradually develop its productive capacity. For the efficiency of land management, it is necessary to access correct and detailed information which can be available through aerial images of remote sensing. The use of vertical aerial photography through Remote Sensing has become more common in boundary survey projects, management and exploration, mainly because it substitutes, with lots of advantage, for cartographic bases, besides offering detailed characteristics, eliminating access difficulties in inaccessible areas, as well as facilitating a tridimensional view once it increases map efficiency and accuracy by combining field and laboratory work with photography interpretation. This work, using panchromatic aerial photography in nominal scale 1:25000 (1962), 1:45000 (1977) , and approximate nominal scale of 1:30.000, originating from aerial survey obtained in 2005, aimed at showing through the Geographic Information System (GIS) the possibility of developing a more complete and accurate analysis of the area values, obtained directly from photos without scale correction, and after comparing it with area values obtained from aerial photography with correct scale referred in IGC (Brazilian Cartography and Geography Institute) guidelines, resulting in an error coefficient which shows area differences through two proposed study. Considering the aerial photography in three different years: 1962, 1977 and 2005 it is possible to affirm that the 2005’s images presented lower values of area difference (43, 48 square meters) than determined area values in reference chart and the 2005’s colored images has facilitated the photo interpretation of the landscape, becoming accurate the confronting traces and among land owners and consequently offering precision during land marking.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Los Objetivos de Desarrollo del Milenio comprometieron a los países con una nueva alianza mundial de alcanzar gradualmente una cobertura universal de los niveles mínimos de bienestar en los países en desarrollo (reducir la pobreza y el hambre y dar respuesta a problemas como la mala salud, las desigualdades de género, la falta de educación, el acceso a agua salubre y la degradación ambiental). Para dar continuidad a esta iniciativa, recientemente en septiembre de 2015, la ONU promulgó la declaración de los Objetivos de Desarrollo Sostenible. Los ODM sitúan la salud en el corazón del desarrollo y establecen un novedoso pacto mundial que vincula a los países desarrollados y los países en desarrollo por medio de obligaciones claras y recíprocas. En este sentido, diversos organismos de cooperación a través de sus programas de cooperación internacional, tratan de mejorar el acceso a la asistencia sanitaria, especialmente a la población vulnerable que vive en zonas rurales de países en desarrollo. Con el fin de ayudar a cumplir los ODM que apoyan los temas de salud en dicha población, estos organismos desarrollan proyectos que despliegan sistemas de e-salud. Las intervenciones se enfrentan a múltiples retos: condicionantes de los países en desarrollo, las necesidades y demandas de los sistemas sanitarios y la complejidad de implantar las TIC en entornos complejos y altamente dinámicos como son los países en desarrollo. Estos condicionantes ocasionan la mayoría de proyectos fallidos que terminan convirtiéndose en soluciones aisladas, que anteponen la tecnología a las necesidades de la población y no generan el impacto esperado en su desarrollo. En este contexto tuvo origen esta tesis doctoral, que persigue como objetivo analizar, planificar, diseñar, verificar y validar un marco arquitectónico de implantación de sistemas de e-salud en áreas rurales de países en desarrollo, que promueva el mejoramiento de la calidad de vida de la población vulnerable de estas regiones y la efectividad de las intervenciones de e-salud en el marco de proyectos de cooperación al desarrollo. Para lograrlo, tomé como punto de partida, diversas estrategias, modelos, metodologías de implantación de e-salud, modelos de gestión de proyectos propuestos por distintos organismos internacionales y propuse una instanciación de estos modelos a proyectos de implantación de sistemas de e-salud en países en desarrollo. Apliqué la metodología action research y los enfoques twin track, middle out y design thinking que me permitieron el refinamiento iterativo del modelo propuesto en la tesis doctoral mediante el trabajo de campo realizado en dos zonas rurales de países de Centroamérica: Jocotán (Guatemala) y San José de Cusmapa (Nicaragua). Como resultado obtuve un modelo experimental basado en cuatro componentes: un modelo de referencia tipo, un modelo conceptual de e-salud, los procesos de gestión y de implantación de sistemas de e-salud en países en desarrollo y una arquitectura de referencia. El modelo experimental resultante aporta herramientas importantes para el despliegue de sistemas de e-salud en países en desarrollo. Se ha propuesto un modelo de referencia que proporciona una visión holística del contexto del país en desarrollo donde se desarrollarán las intervenciones. Un modelo conceptual de e-salud que representa los principales conceptos involucrados en un sistema de e-salud. Los procesos ii- de gestión del proyecto y de implantación del sistema que proporcionan a los grupos de cooperación, herramientas para el análisis, diseño, desarrollo y despliegue de los sistemas de e-salud en áreas rurales de países en desarrollo. Y finalmente la arquitectura de referencia que sienta las bases para la aplicación de estos procesos a un contexto en particular. Las líneas futuras de trabajo sugieren extender el modelo a más casos de estudio que permitan su refinamiento y evaluar los futuros usos que pueden surgir de los sistemas de e-salud resultantes. ABSTRACT Millennium Development Goals (MDGs) committing the countries with a new global partnership to achieve universal coverage of minimum levels of well-being in Developing Countries (for addressing extreme poverty in its many dimensions-income poverty, hunger, disease, lack of adequate housing, and exclusion-while promoting gender equality, education, and environmental sustainability). From September 2015, these goals are replaces with Sustainable Development Goals (SDGs). The MDG place health at the heart of development and establish a novel global compact, linking developed and developing countries through clear, reciprocal obligations. Many public and private institutions promote international cooperation programs to support in achieving the MDGs. Some of these cooperation programs deal improving access to healthcare to poor people living in isolated areas from developing countries. In order to accomplish this goal organizations perform projects (interventions or cooperation projects) that deploy e-health systems in these zones. Nevertheless, this kind of projects face multiple challenges that dismiss the effectiveness of the projects results. In particular, cooperation teams face issues such as constraints in developing countries, lack of electrical and ICT infrastructure, scarce transport, extreme climate conditions, lack ICT capacity, lack of access to healthcare and inefficient delivery methods, etc. Hence, these issues increase the complexity of implementing e-health in developing countries and then causes the most projects fail. In other words, the solutions do not meet population needs and do not generate the expected impact on development. This context is the starting point of this doctoral thesis, which deals with analysing, planning, designing, testing and validating an architectural framework in order to implement e-health systems in rural areas from developing countries, promote development of the population in these regions, and thus improve the impact of interventions of development cooperation projects. To achieve this goal, I took as a starting point the strategies, models, e-health implementation methodologies and projects management models proposed by various international agencies. Then I proposed an instantiation of these models to manage the intervention and implement e-health systems in developing countries. I applied the action research methodology and the approaches twin track, middle out and design thinking which allowed me the iterative refinement of the model proposed in this doctoral thesis. The proposed framework was validated by running two cases studies in rural areas of Central America: Jocotán (Guatemala) and San José de Cusmapa (Nicaragua). As a result, I obtained an experimental model based on four components: a Type reference model, an e-health conceptual model, both process management and implementation e-health systems in developing countries and a reference architecture. The resulting experimental model provides important tools for the deployment of e-health systems in developing countries. The model become as reference model that provides a holistic view of the developing countries context where the interventions will be running. The conceptual model of e-health represents the main concepts involved into an e-health system. The project management and implementation processes of the iv- system provide to the cooperation teams with tools for analysing, designing, developing and deploying e-health systems in rural areas from developing countries. Finally, the reference architecture provides the basis for the implementation of these processes into a particular context. The future research suggest the extension the model to other cases studies in order to refine and evaluate the viability the model.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Enterprise System (ES) implementation and management are knowledge intensive tasks that inevitably draw upon the experience of a wide range of people with diverse knowledge capabilities. Knowledge Management (KM) has been identified as a critical success factor in ES projects. Despite the recognized importance of managing knowledge for ES benefits realization, systematic attempts to conceptualize KM-structures have been few. Where the adequacy of KM-structures is assessed, the process and measures are typically idiosyncratic and lack credibility. Using the ‘KM-process’, itself based in sociology of knowledge, this paper conceptualizes four main constructs to measure the adequacy of KM-structures. The SEM model is tested using 310 responses gathered from 27 ES installations that had implemented SAP R/3. The findings reveal six constructs for KM-structure. Furthermore, the paper demonstrates the application of KM-structures in the context of ES using the Adaptive Structuration Theory. The results demonstrate that having adequate KM-structures in place, while necessary, is not sufficient. These rules and resources must be appropriated to have greater positive influence on the Enterprise System. Furthermore, the study provides empirical support for knowledge-based theory by illustrating the importance of knowledge use/re-use (vs. knowledge creation) as the most important driver in the process of KM.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a practicable systems-based approach to knowledge management (KM) in a project environment, to encourage organisations to unlock the value in their review processes. It relies on knowledge capture and storage at decision review points, to enrich individual, team and organisational learning during the project life cycle. The project's phases are typically represented horizontally with deliverables (objectives) or project "promises" as the desirable outcomes. The purpose of this paper is to give expression through introducing a vertical dimension to facilitate the KM process. A model is proposed that conceptualises project-specific knowledge drawing on and feeding into the organisation's knowledge management system (KMS) at tactical and strategic levels. Design/methodology/approach – This conceptual paper links concepts from systems theory with KM, to produce a model to identify, collate, and optimise project-based knowledge and integrate it into the management process. Findings – The application of the system theory approach enriches the knowledge generated by a project, and feeds it into the next phase of that project. At the same time, it contributes to the individual's and project team's KM, specifies possible courses of action, together with risks, costs and benefits and thus it expands the organisation's higher level KMS. Research limitations/implications – The concept suggests that the knowledge capture, storage and sharing process may best be undertaken holistically, in view of the systems relationships between the tasks. Systems theory structures this process. Research opportunities include studying the interfaces between levels of KM, in relation to the project's progress. Practical implications – Reconceptualisation of the project as a knowledge creation process may improve the project's progress as well as add to the individual's, project team's, and wider organisation's knowledge base. An example is given. Originality/value – This paper illuminates the broader potential of under-utilised opportunities in well-known management approaches to add dimension to the business project, of knowledge creation, storage and sharing.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Life-cycle management (LCM) has been employed in the management of construction projects for many years in order to reduce whole life cost, time, risk and improve the service to owners. However, owing to lack of an effective information sharing platform, the current LCM of construction projects is not effectively used in the construction industry. Based upon the analysis of the information flow of LCM, a virutal prototyping (VP)-based communication and collaboration information platform is proposed. Following this, the platform is customized using DASSAULT sofware. The whole process of implementing the VP-based LCM are also discussed and, from a simple case study, it is demonstrated that the VP-based communication and collaboration information platform is an effective tool to support the LCM of construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

40.00% 40.00%

Publicador:

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.