938 resultados para Ashland Flood Control Project (Ill.)
Resumo:
Mode of access: Internet.
Resumo:
Considers (90) S. 537, (90) S. 1144, , (90) S. 1215, (90) S. 1529, (90) S. 1549, (90) S. 1622 , (90) S. 1812, (90) S. 2024, (90) S. 2059, (90) S. 2169. (90) S. 2236,(90) S. 2611.
Resumo:
Stamped at head of cover title: Also issued as 88/2 H. doc. 308.
Resumo:
Copy consists of first six pages only.
Resumo:
"July 2005."
Resumo:
"Authority for the preparation of this report and state participation in the flood protection recommendations contained herein is provided by the Flood Control Act of 1945 [615 ILCS 15]."--Leaf 2.
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
"OWR/SPS/99-003."
Resumo:
Includes pages and exhibits from the Christopher B. Burke Engineering, Ltd. report analyzing the problems and recommending remedial measures to mitigate flooding in Lemont.
Resumo:
"December, 1987."
Resumo:
"February, 1989."
Resumo:
Volume 2 is Executive summary.
Resumo:
"DOWR/SPS/90-003."
Resumo:
"July, 2002"
Resumo:
"DOWR/SPS/90-001"