915 resultados para Allegheny Coal Company.
Resumo:
"To take effect February 29th, 1892."
Resumo:
Paged continuously.
Resumo:
At head of title: No. 9306.
Resumo:
Cover title.
Resumo:
A comprehensive study was undertaken involving chemical (inorganic and organic) and bioanalytical (a suite of 14 in vitro bioassays) assessments of coal seam gas (coal bed methane) associated water (CSGW) in Queensland, Australia. CSGW is a by-product of the gas extraction process and is generally considered as water of poor quality. This was done to better understand what is known about the potential biological and environmental effects associated with the organic constituents of CSGW in Australia. In Queensland, large amounts of associated water must be withdrawn from coal seams to allow extraction of the gas. CSGW is disposed of via release to surface water, reinjected to groundwater or reused for irrigation of crops or pasture, supplied for power station cooling and or reinjected specifically to augment drinking water aquifers. Groundwater samples were collected from private wells tapping into the Walloon Coal Measures, the same coal aquifer exploited for coal seam gas production in the Surat Basin, Australia. The inorganic characteristics of these water samples were almost identical to the CSGW entering the nearby gas company operated Talinga-Condabri Water Treatment Facility. The water is brackish with a pH of 8 to 9, high sodium, bicarbonate and chloride concentrations but low calcium, magnesium and negligible sulphate concentrations. Only low levels of polyaromatic hydrocarbons (PAHs) were detected in the water samples, and neither phenols nor volatile organic compounds were found. Results from the bioassays showed no genotoxicity, protein damage, or activation of hormone receptors (with the exception of the estrogen receptor). However, five of the 14 bioassays gave positive responses: an arylhydrocarbon-receptor gene activation assay (AhR-CAFLUX), estrogenic endocrine activity (ERα-CALUX), oxidative stress response (AREc32), interference with cytokine production (THP1-CPA) and non-specific toxicity (Microtox). The observed effects were benchmarked against known water sources and were similar to secondary treated wastewater effluent, stormwater and surface water. As mixture toxicity modelling demonstrated, the detected PAHs explained less than 5% of the observed biological effects.
Resumo:
In 1846, the governments of Upper Canada and the State of New York initiated the creation of two companies that would be authorized to build a bridge over the Niagara River. The bridge was to be owned by both companies, respectively known as the Niagara Falls Suspension Bridge Company (Canadian) and the International Bridge Company (American). A suspension bridge was completed in 1848. This bridge was later replaced by a second suspension bridge that accommodated railways, built in 1853-54. However, the increasing weight of trains made it necessary for the bridge to be redesigned, and a third bridge was completed in 1886. Eventually, this bridge was replaced by a steel arch bridge, which was completed in 1897.
Resumo:
The study addresses the need to manage the risk of the purchase price of coal in a power company by changing the management model of the purchasing department. It eliminates the risk of price reduces the cost of buying coal and optimizing the performance of all electricity generation plants belonging to the company. You get more flexibility and optionallity to gain additional benefits both economic and efficiency in the supply to our generation fleet. The tools to achieve the above purpose will be financial derivatives that will be used as elements of management and not as mere speculation in the markets.
Resumo:
"Specially compiled and prepared for the convenient use of mine officials, mining engineers, and students preparing themselves for certificates of competency as mine inspectors or mine foremen."
Resumo:
"Grant no. R803971."
Resumo:
Presented at EPA Symposium on Environmental Aspects of Fuel Conversion Technology, May 14, 1974.
Resumo:
Phase I report. Site selection and estimated water costs based on current technology. Phase II report. Investigation of emerging technology, by-product recovery, and very large capacities. Period of performance: June 1965-Oct. 1966.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Type-written letter: "To all employees" from J. F. Welborn, president of the Colorado Fuel and Iron Company, written after the findings of the Colorado Industrial Commission (mounted at end)
Resumo:
Mode of access: Internet.