829 resultados para 120201 Building Construction Management and Project Planning
Resumo:
We explore the contribution of socio-technical networks approaches to construction management research. These approaches are distinctive for their analysis of actors and objects as mutually constituted within socio-technical networks. They raise questions about the ways in which the content, meaning and use of technology is negotiated in practice, how particular technical configurations are elaborated in response to specific problems and why certain paths or solutions are adopted rather than others. We illustrate this general approach with three case studies: a historical study of the development of reinforced concrete in France, the UK and the US, the recent introduction of 3D-CAD software into four firms and an analysis of the uptake of environmental assessment technologies in the UK since 1990. In each we draw out the ways in which various technologies shaped and were shaped by different socio-technical networks. We conclude with a reflection on the contributions of socio-technical network analysis for more general issues including the study of innovation and analyses of context and power.
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2
Resumo:
Building services are worth about 2% GDP and are essential for the effective and efficient operations of the building. It is increasingly recognised that the value of a building is related to the way it supports the client organisation’s ongoing business operations. Building services are central to the functional performance of buildings and provide the necessary conditions for health, well-being, safety and security of the occupants. They frequently comprise several technologically distinct sub-systems and their design and construction requires the involvement of numerous disciplines and trades. Designers and contractors working on the same project are frequently employed by different companies. Materials and equipment is supplied by a diverse range of manufacturers. Facilities managers are responsible for operation of the building service in use. The coordination between these participants is crucially important to achieve optimum performance, but too often is neglected. This leaves room for serious faults. The need for effective integration is important. Modern technology offers increasing opportunities for integrated personal-control systems for lighting, ventilation and security as well as interoperability between systems. Opportunities for a new mode of systems integration are provided by the emergence of PFI/PPP procurements frameworks. This paper attempts to establish how systems integration can be achieved in the process of designing, constructing and operating building services. The essence of the paper therefore is to envisage the emergent organisational responses to the realisation of building services as an interactive systems network.
Resumo:
Genetic algorithms (GAs) have been introduced into site layout planning as reported in a number of studies. In these studies, the objective functions were defined so as to employ the GAs in searching for the optimal site layout. However, few studies have been carried out to investigate the actual closeness of relationships between site facilities; it is these relationships that ultimately govern the site layout. This study has determined that the underlying factors of site layout planning for medium-size projects include work flow, personnel flow, safety and environment, and personal preferences. By finding the weightings on these factors and the corresponding closeness indices between each facility, a closeness relationship has been deduced. Two contemporary mathematical approaches - fuzzy logic theory and an entropy measure - were adopted in finding these results in order to minimize the uncertainty and vagueness of the collected data and improve the quality of the information. GAs were then applied to searching for the optimal site layout in a medium-size government project using the GeneHunter software. The objective function involved minimizing the total travel distance. An optimal layout was obtained within a short time. This reveals that the application of GA to site layout planning is highly promising and efficient.
Resumo:
The 12 January 2010, an earthquake hit the city of Port-au-Prince, capital of Haiti. The earthquake reached a magnitude Mw 7.0 and the epicenter was located near the town of Léogâne, approximately 25 km west of the capital. The earthquake occurred in the boundary region separating the Caribbean plate and the North American plate. This plate boundary is dominated by left-lateral strike slip motion and compression, and accommodates about 20 mm/y slip, with the Caribbean plate moving eastward with respect to the North American plate (DeMets et al., 2000). Initially the location and focal mechanism of the earthquake seemed to involve straightforward accommodation of oblique relative motion between the Caribbean and North American plates along the Enriquillo-Plantain Garden fault system (EPGFZ), however Hayes et al., (2010) combined seismological observations, geologic field data and space geodetic measurements to show that, instead, the rupture process involved slip on multiple faults. Besides, the authors showed that remaining shallow shear strain will be released in future surface-rupturing earthquakes on the EPGFZ. In December 2010, a Spanish cooperation project financed by the Politechnical University of Madrid started with a clear objective: Evaluation of seismic hazard and risk in Haiti and its application to the seismic design, urban planning, emergency and resource management. One of the tasks of the project was devoted to vulnerability assessment of the current building stock and the estimation of seismic risk scenarios. The study was carried out by following the capacity spectrum method as implemented in the software SELENA (Molina et al., 2010). The method requires a detailed classification of the building stock in predominant building typologies (according to the materials in the structure and walls, number of stories and age of construction) and the use of the building (residential, commercial, etc.). Later, the knowledge of the soil characteristics of the city and the simulation of a scenario earthquake will provide the seismic risk scenarios (damaged buildings). The initial results of the study show that one of the highest sources of uncertainties comes from the difficulty of achieving a precise building typologies classification due to the craft construction without any regulations. Also it is observed that although the occurrence of big earthquakes usually helps to decrease the vulnerability of the cities due to the collapse of low quality buildings and the reconstruction of seismically designed buildings, in the case of Port-au-Prince the seismic risk in most of the districts remains high, showing very vulnerable areas. Therefore the local authorities have to drive their efforts towards the quality control of the new buildings, the reinforcement of the existing building stock, the establishment of seismic normatives and the development of emergency planning also through the education of the population.
Resumo:
This document is intended to lay the foundation for resource reduction strategies in new construction, renovation and demolition. If you have an innovative idea or information that you believe should be included in future updates of this manual please email Shelly Codner at scodner@region12cog.org or Jan Loyson at Jan.Loyson@Iowalifechanging.com. Throughout this manual, we use the term “waste reduction” to define waste management initiatives that will result in less waste going to the landfill. In accordance with the waste management hierarchy these practices include reducing (waste prevention), reusing (deconstruction and salvage), recycling and renewing (making old things new again) - in that order. This manual will explain what these practices are and how to incorporate them into your projects.
Resumo:
The main objective of this PhD research study is to provide a perspective on the urban growth management and sustainable development in Palestine, and more specifically in Hebron district as a case study. Hebron is located 36 km south of Jerusalem, with an overall population size of around 600,000 people living in a total area around1246km2. Hebron is the biggest Palestinian district that has 16 municipalities and 154 localities. The research discusses and analyzes the urban planning system, economical and environmental policies and the solution required to manage and integrate the development elements to develop a sustainable development plan for Hebron. The research provides answers for fundamental questions such as what kind and definition of sustainable development are applicable to the Palestinian case?. What are the sustainability problems there and how the Israeli occupation and unstable political condition affect the sustainable development in Palestine? What are the urban growth management and sustainability policies and actions required from government, public and privets sector in Palestine? The fast urban growth in Palestine is facing many problems and challenges due to the increase in the population size and the resulting impact of this increase including, but not limited to, the demand of new houses, need for more infrastructure services, demands on new industrial, commercial, educational and health projects, which in turn reduces the area of agricultural lands and threatens the natural resources and environment. There are also other associated sustainability problems like the absence of effective plans or regulations that control urban expansion, the absence of sufficient sustainable development plans at the national levels for the district, new job requirements, Israeli restrictions and occupation for more than 60 years, existence of construction factories near residential areas, poor public awareness and poor governmental funds for service projects and development plans. The study consists of nine chapters. Chapter One includes an introduction, study objectives, problems and justifications, while Chapter Two has a theoretical background on sustainability topic and definitions of sustainability. The Palestinian urban planning laws and local government systems are discussed in Chapter Three and the methodology of research is detailed in Chapter Four. As for Chapter Five, it provides a general background on Hebron District including demographical and economical profiles, along with recommendations related to sustainable development for each profile Chapter Six addresses the urban environment, sustainability priorities and policies required. Chapter Seven discusses and analyzes infrastructure services including transportation, water and wastewater. As for Chapter Eight, it addresses the land use, housing and urban expansion beside the cultural heritage, natural heritage with relevant sustainable development polices and recommendations. Finally, Chapter Nine includes a conclusion and comprehensive recommendations integrating all of urban and sustainability event in one map. Hebron has a deep history including a rich cultural heritage aged by thousands of years, with 47% of Hebron district population under 14 years old. Being the biggest Palestinian district, Hebron has thousands of industrial and economical organizations beside a large agricultural sector at Palestine level. This gives Hebron a potential to play major roles in developing a national sustainability plan, as the current urban planning system in Palestine needs urgent reform and development to fulfill the sustainability requirement. The municipalities and ministers should find permanent financial aid for urban planning and development studies so as to face future challenges. The Palestinian government can benefit from available local human resources in development projects; hence Palestinian people have sufficient qualifications in most sectors. The Palestinian people also can invest in the privet sector in Palestine in case businessmen have been encouraged and clear investment laws and plans have been developed. The study provides recommendations associated to the sustainable development in Palestine in general and Hebron, as a case study, in specific. Recommendations include increasing the privet sector as well as the public involvement in urban growth management, and stopping unplanned urban expansion, subjecting granting building permits of new projects to the no-harm environmental impact assessment, increasing the coordination and cooperation between localities and central bodies, protection and renovation of old cites and green areas, increasing the quality and quantity of infrastructure services, establishing district urban planning department to coordinate and organize urban planning and sustainable development activities. Also, among recommendations come dividing Hebron into three planning and administrative areas (north, central and south), and dividing the sustainable development and implementation period (2010 to 2025) into three main phases. Finally, the study strongly recommends benefiting from the same urban development plans in similar districts at national and international levels, also to use new technologies and information systems in urban planning process.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.