897 resultados para wind energy potential
Resumo:
The oily sludge is a complex mix of hydrocarbons, organic impurities, inorganic and water. One of the major problems currently found in petroleum industry is management (packaging, storage, transport and fate) of waste. The nanomaterials (catalysts) mesoporous and microporous are considered promising for refining and adsorbents process for environment protection. The aim of this work was to study the oily sludge from primary processing (raw and treated) and vacuum residue, with application of thermal analyses technique (pyrolysis), thermal and catalytic pyrolysis with nanomaterials, aiming at production petroleum derived. The sludge and vacuum residue were analyzed using a soxhlet extraction system, elemental analysis, thin layer chromatography, thermogravimetry and pyrolysis coupled in gas chromatography/mass spectrometry (Py GC MS). The catalysts AlMCM-41, AlSBA-15.1 e AlSBA-15.2 were synthesized with molar ratio silicon aluminum of 50 (Si/Al = 50), using tetraethylorthosilicante as source of silicon and pseudobuhemita (AlOOH) as source of aluminum. The analyzes of the catalysts indicate that materials showed hexagonal structure and surface area (783,6 m2/g for AlMCM-41, 600 m2/g for AlSBA-15.1, 377 m2/g for AlSBA-15.2). The extracted oily sludge showed a range 65 to 95% for organic components (oil), 5 to 35% for inorganic components (salts and oxides) and compositions different of derivatives. The AlSBA-15 catalysts showed better performance in analyzes for production petroleum derived, 20% increase in production of kerosene and light gas oil. The energy potential of sludge was high and it can be used as fuel in other cargo processed in refinery
Resumo:
Performance measurement in highly competitive markets is a necessary measure for those who aim the top positions. The business performance measurement approach have reached relevant results in the literature, however, a different approach has recently appeared that broadened the perception of competition, where companies do not seek the competition among companies only, but also among supply chains. Brazilian Wind energy supply chain is living a structuring and expanding moment, with the major global players in the industry making investments in the country. This research aims to answer which are the key performance indicators that must be considered by the Brazilian wind energy sector companies, which are part in a broad perspective of supply chain competition. The research was executed in two steps: exploratory (literature review and a field research in the companies) and later a survey was conducted with the Brazilian Wind energy companies workers with the purpose to validate the performance indicators found in the exploratory step. The survey evaluated 40 performance indicators distributed among five major activities: Project prospection, building/execution, operation and maintenance, logistics and transverse processes, which summarize the performance of the entire supply chain, pointing the sinergy and the competitive level of the supply chain. The selected performance indicators reflect the high relevance of the costs dimension in the Brazilian energy companies performance, acting as a key performance indicator, is also indicates the limited performance management integration throughout the Brazilian wind energy supply chain
Resumo:
At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
In the last decade, the renewable energy sources have present a major propulsion in the world due to several factors: political, environmental, financial and others. Within this context, we have in particular the energy obtained through wind, wind energy - that has highlighted with rapid growth in recent years, including in Brazil, mostly in the Northeast, due to it s benefit-cost between the clean energies. In this context, we propose to compare the variable structure adaptive pole placement control (VS-APPC) with a traditional control technique proportional integral controller (PI), applied to set the control of machine side in a conversion system using a wind generator based on Double-Fed Induction Generator (DFIG). Robustness and performance tests were carried out to the uncertainties of the internal parameters of the machine and variations of speed reference.
Resumo:
This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model
Resumo:
Due to the increasing need to promote the use of resources that support the environment and the clean industry, the science has developed in the area of natural resource use as well as enhanced use of the renewable energy sources. Considering also the great need for clean water and wide availability of salt or brackish water, added to the great solar energy potential in northeastern of the Brazil, it was developed a solar distiller whose main difference is its system of pre-solar heating also. From experimental adjustments, the system was developed by the use of a cylindrical solar concentrator coupled to a conventional distiller. The system is designed such that attempt to facilitate the process termination trap to ensure constant movement of the fluid mass and thus enable higher temperatures to the system and thus fetch a higher amount of distillate collected. In a stage of the experiment were used a forced circulation to try to further increase the amount of energy exchange system. To develop the study were set up four settings for comparison in which one was only distiller simple as basic parameter, the second proposed configuration were with the coupling of the concentration triggered manually every 30 minutes to monitor the sun, the third configuration occurred with automatic triggering of a timer, and the fourth configuration was also used a pumping system that tried to improve the circulation of the fluid. With the comparative analysis of the results showed a gain in the amount of distillate system, especially in the forced model
Resumo:
After the Protocol of Kyoto and of the ECHO 92 - Rio de Janeiro, the attentions of the world focus to the preservation of the environment and of the maintainable use of the natural resources. People were looking for preserving environment for the future generations. Ever since, solutions are looked for the supply of energy in its more acquaintances forms and the substitution of the use of fossil fuels for the such alternative forms as: Photovoltaics, solar heat systems for water, wind , bio-diesel, etc. and in this context the Company of Engineering of the State of Bahia - Cerb changed a diesel pumping system by an wind one, It´s the first community system of this nature in Bahia. Facing problems with the model, a Cerb involved the academic segment of the Federal Center of Technological Education of Bahia Cefetba looking for a solution. This work intends to demonstrate the possibilities of optimization of the pumping communit system that supply water to approximately 50 people in the place of Romão, municipal district of São Gabriel-Ba. Technical reports were published in AGRENERGD2004-Unicamp SP and Scientific Magazine ETC,Cefetba, 2005. A simulation of the increase of energy is presented for heights of 15 and 20m, considering the eletromecanical balance from the pumping energy to the wind turbine. From the accomplished bibliographical revision, we emphasized the mechanical aspects of the engineering once in UFRN, those studies concentrate on the Department of Mechanical Engineering while, in others eletroelectronic are more emphasized. Finally, documents that we judged important were enclosed for the perfect understanding of this work
Resumo:
The purpose of this study was to investigate the social-environmental implications of the first large scale wind farm recently built in Brazil (2006), Parque Eólico de Rio do Fogo (PERF), to the nearby communities. The research was base on the adjustment of the DIS/BCN tool to analyze social impact and it was linked to the multi-method approach. Applying the autophotography strategy, cameras were given to five children from the district of Zumbi, the nearest location to PERF, and they were asked to individually photograph the six places they liked the most and the six places they liked the least in their community. Then, these children were interviewed individually and collectively about the photographs. Adult locals in Zumbi, residents of Zumbi/Rio do Fogo settlement, members of the State and Municipal government and representatives of the PERF were also interviewed with the aid of some of the pictures taken by the children and others that might trigger something to say, as a strategy called sample function. The five children presented positive image towards PERF; all of them chose to photograph it as one of places they liked. Adult population of Zumbi presented positive visual evaluation towards PERF. A small number of the interviewees were aware of the environmental and social benefits of wind energy production. Residents did not participate of the decision making process regarding PERF. They approved the project, especially because of the jobs provided during construction. Nowadays, PERF is something apart from their lives because it no longer provides jobs or any other interaction between the facility and the locals. Residents relate to the land, not with the facility. However, there is no evidence of rejection towards PERF, it is simply seen as something neutral to their lives. The low levels of education, traditional lack of social commitment and citizenship, and the experience accumulated by PERF´s planners and builders in other countries, may be contributing points to the fact that Zumbi residents did not oppose to PERF. It is clear that the country needs a legislation which seriously considers the psycho-social dimension involved in the implementation of wind farms
Resumo:
The human being has a fundamental role in issues concerning scarcity of energy resources as well as in the success of technologies which favor the use of renewable sources, such as wind energy. But what does wind energy mean for people? What are the psychological meanings concerning this term? Aiming to answer these questions, the general objective of this dissertation was to identify and to analyze the knowledge about wind energy taking into account a network of psychological meanings. One hundred and ninety one (191) university students from Natal-RN participated in the study, being male the majority (53%); aged between 17 and 51 years old (M=23.3 years; SD=5.7). Participants responded to self reports using the Natural Semantic Networks (NSW) technique, as well as to several sociodemographic questions. The results showed a consistent, positive and useful general semantic network. In this semantic network, knowledge about wind energy was represented by words that correspond to the appeal of (pro) environmental stance (e.g., clean and nature), that evinced both the technological aspect (e.g., force) and the economic aspect (e.g., economy). Results from different groups were also analyzed. The first set of groups (non-environemental and environmental) was divided considering the course (e.g., ecology and economy). The second set of groups(non-caretaker and caretaker) was divided based on the practice of environmental care expressed. Subtle differences were observed in the semantic networks of caretakers, who emphasized environment, an attribute not mentioned by non-caretakes. This indicates a construction of knowledge that is influenced by the presence or absence of the environmental commitment. Such findings may be useful in the construction of instruments for surveys and in the development of public and educational policies. Additionally, they may assist the media towards a more objective performance concerning wind energy
Resumo:
In the spatial electric load forecasting, the future land use determination is one of the most important tasks, and one of the most difficult, because of the stochastic nature of the city growth. This paper proposes a fast and efficient algorithm to find out the future land use for the vacant land in the utility service area, using ideas from knowledge extraction and evolutionary algorithms. The methodology was implemented into a full simulation software for spatial electric load forecasting, showing a high rate of success when the results are compared to information gathered from specialists. The importance of this methodology lies in the reduced set of data needed to perform the task and the simplicity for implementation, which is a great plus for most of the electric utilities without specialized tools for this planning activity. © 2008 IEEE.
Resumo:
In this work the multiarea optimal power flow (OPF) problem is decoupled into areas creating a set of regional OPF subproblems. The objective is to solve the optimal dispatch of active and reactive power for a determined area, without interfering in the neighboring areas. The regional OPF subproblems are modeled as a large-scale nonlinear constrained optimization problem, with both continuous and discrete variables. Constraints violated are handled as objective functions of the problem. In this way the original problem is converted to a multiobjective optimization problem, and a specifically-designed multiobjective evolutionary algorithm is proposed for solving the regional OPF subproblems. The proposed approach has been examined and tested on the RTS-96 and IEEE 354-bus test systems. Good quality suboptimal solutions were obtained, proving the effectiveness and robustness of the proposed approach. ©2009 IEEE.
Resumo:
In this paper, a methodology based on Unconstrained Binary Programming (UBP) model and Genetic Algorithms (GAs) is proposed for estimating fault sections in automated distribution substations. The UBP model, established by using the parsimonious set covering theory, looks for the match between the relays' protective alarms informed by the SCADA system and their expected states. The GA is developed to minimize the UBP model and estimate the fault sections in a swift and reliable manner. The proposed methodology is tested by utilizing a real-life automated distribution substation. Control parameters of the GA are tuned to achieve maximum computational efficiency and reduction of processing time. Results show the potential and efficiency of the methodology for estimating fault section in real-time at Distribution Control Centers. ©2009 IEEE.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Pós-graduação em Microbiologia Agropecuária - FCAV