814 resultados para project management, construction projects, Brunei
Resumo:
Eight steps for projectizing continuous improvement to deliver desired change
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
This paper examines the international diffusion of one business practice, project management, through the prism of prior literature and data on the diffusion of ISO 9000. The study took an inductive approach, building theory through the iterative collection and analysis of quantitative and qualitative data. The findings problematise the central position accorded to the S-curve model and neo-institutional theory in explaining technology diffusion. The research posits three distinct processes driving the diffusion process: utility, institutional isomorphism, and competitive isomorphism, with the latter consisting of three primary mechanisms: competitive imitation, trendslators and fashion retailers. Contrary to prior literature, national, quasi-professional associations are found to be central to the diffusion process and play a key role in advocating and containing management technologies.
Resumo:
This research inquires into the value of two common ‘management technologies’, namely ISO 9001 and project management. To avoid certain methodological problems, we study the value of these micro-level practices by inductively analysing macro-level data, specifically the intensity of project management and ISO 9001 certification (termed project management score and ISO 9001 score) in different countries against national measures of wealth and innovation. There is no correlation between ISO 9001 score and innovation, while high ISO 9001 scores are correlated with decreasing levels of wealth. The project management score is positively correlated with wealth and with innovation, though very high project management scores are negatively correlated with innovation. The study includes a cluster analysis which finds that, with one exception, countries tend to adopt either project management or ISO 9001 but not both. The analysis indicates that project management is more likely to be associated with high innovation and high wealth than ISO 9001.
Resumo:
This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to incorporate a greater focus on project management in their project development process. A technical advisory committee (TAC) was assembled to accomplish this effort. The TAC took into consideration the current status of project management with the Iowa DOT, their experience during the demonstration workshop held in Iowa as part of the implementation assistance they received, the project management peer exchange hosted by the Iowa DOT, and additional examples of project management that were presented. With this basis, the TAC participated in a number of discussions to develop draft guidance for the foundation of a Project Management Office (PMO) within the Iowa DOT. The final report describes the process that was used in establishing this guidance. The report details the decisions and decision process that the TAC employed in this endeavor and provides additional thoughts and insight into the draft guidance. Appendix A includes the draft guidance in the form of PMO function details and detailed lists of project management roles and responsibilities. Appendix B includes a starter list of project management resources for the PMO.