818 resultados para ground improvement
Resumo:
Our procedure to detect moving groups in the solar neighbourhood (Chen et al., 1997) in the four-dimensional space of the stellar velocity components and age has been improved. The method, which takes advantadge of non-parametric estimators of density distribution to avoid any a priori knowledge of the kinematic properties of these stellar groups, now includes the effect of observational errors on the process to select moving group stars, uses a better estimation of the density distribution of the total sample and field stars, and classifies moving group stars using all the available information. It is applied here to an accurately selected sample of early-type stars with known radial velocities and Strömgren photometry. Astrometric data are taken from the HIPPARCOS catalogue (ESA, 1997), which results in an important decrease in the observational errors with respect to ground-based data, and ensures the uniformity of the observed data. Both the improvement of our method and the use of precise astrometric data have allowed us not only to confirm the existence of classical moving groups, but also to detect finer structures that in several cases can be related to kinematic properties of nearby open clusters or associations.
Resumo:
Inhibitory control, a core component of executive functions, refers to our ability to suppress intended or ongoing cognitive or motor processes. Mostly based on Go/NoGo paradigms, a considerable amount of literature reports that inhibitory control of responses to "NoGo" stimuli is mediated by top-down mechanisms manifesting ∼200 ms after stimulus onset within frontoparietal networks. However, whether inhibitory functions in humans can be trained and the supporting neurophysiological mechanisms remain unresolved. We addressed these issues by contrasting auditory evoked potentials (AEPs) to left-lateralized "Go" and right NoGo stimuli recorded at the beginning versus the end of 30 min of active auditory spatial Go/NoGo training, as well as during passive listening of the same stimuli before versus after the training session, generating two separate 2 × 2 within-subject designs. Training improved Go/NoGo proficiency. Response times to Go stimuli decreased. During active training, AEPs to NoGo, but not Go, stimuli modulated topographically with training 61-104 ms after stimulus onset, indicative of changes in the underlying brain network. Source estimations revealed that this modulation followed from decreased activity within left parietal cortices, which in turn predicted the extent of behavioral improvement. During passive listening, in contrast, effects were limited to topographic modulations of AEPs in response to Go stimuli over the 31-81 ms interval, mediated by decreased right anterior temporoparietal activity. We discuss our results in terms of the development of an automatic and bottom-up form of inhibitory control with training and a differential effect of Go/NoGo training during active executive control versus passive listening conditions.
Resumo:
The first part of a three year plan to evaluate and recommend improvements to Iowa's Juvenile Courts.
Resumo:
A report of a one year assessment of Iowa's Juvenile Courts handling of Child in Need of Assistance cases and a plan for improvement.
Resumo:
A plan for improvement of Iowa's Juvenile Courts handling of Child in Need of Assistance cases. A brief report focusing on just the plan for improvement pulled from the main report: A Study of Iowa's Court Performance in Child Abuse and Neglect Cases and Plan for Improvement.
Resumo:
Background and objective: Optimal care of diabetic patients (DPs) decreases the risk of complications. Close blood glucose monitoring can improve patient outcomes and shorten hospital stay. The objective of this pilot study was to evaluate the treatment of hospitalized DPs according to the current standards, including their diabetic treatment and drugs to prevent diabetes related complications [=guardian drugs: angiotensin converting enzyme inhibitors (ACEI) or Angiotensin II Receptor Blockers (ARB), antiplatelet drugs, statins]. Guidelines of the American Diabetes Association (ADA) [1] were used as reference as they were the most recent and exhaustive for hospital care. Design: Observational pilot study: analysis of the medical records of all DPs seen by the clinical pharmacists during medical rounds in different hospital units. An assessment was made by assigning points for fulfilling the different criteria according to ADA and then by dividing the total by the maximum achievable points (scale 0-1; 1 = all criteria fulfilled). Setting: Different Internal Medicine and Geriatric Units of the (multi-site) Ho^pital du Valais. Main outcome measures: - Completeness of diabetes-related information: type of diabetes, medical history, weight, albuminuria status, renal function, blood pressure, (recent) lipid profile. - Management of blood glucose: Hb1Ac, glycemic control, plan for treating hyper-/hypoglycaemia. - Presence of guardian drugs if indicated. Results: Medical records of 42 patients in 10 different units were analysed (18 women, 24 men, mean age 75.4 ± 11 years). 41 had type 2 diabetes. - Completeness of diabetes-related information: 0.8 ± 0.1. Information often missing: insulin-dependence (43%) and lipid profile (86%). - Management of blood glucose: 0.5 ± 0.2. 15 patients had suboptimal glycemic balance (target glycaemia 7.2-11.2 mmol/ l, with values[11.2 or\3.8 mmol/l, or Hb1Ac[7%), 10 patients had a deregulated balance (more than 10 values[11.2 mmol/l or \3.8 mmol/l and even values[15 mmol/l). - Presence of guardian drugs if indicated: ACEI/ARB: 19 of 23 patients (82.6%), statin: 16 of 40 patients (40%), antiplatelet drug: 16 of 39 patients (41%). Conclusions: Blood glucose control was insufficient in many DPs and prescription of statins and antiplatelet drugs was often missing. If confirmed by a larger study, these two points need to be optimised. As it is not always possible and appropriate to make those changes during hospital stay, a further project should assess and optimise diabetes care across both inpatient and outpatient settings.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
Concerning improvements to the State Capitol Grounds including placement of the Allison memorial and Soldiers and Sailor's momuments; removal of heating plant and relieving the state of coal, ashes, gas and smoke; provision of office space to the Adjutant General; an eventual executive mansion; provision of office buildings; and for a Supreme Court building where together with its library auxiliaries will have perpetual growth and constant accessbility; and propose restoration of natural scenic value of the capitol site.
Resumo:
On June 24, 2010, the Rebuild Iowa Office (RIO) held a discussion-based tabletop exercise for the purpose of creating a framework to support disaster recovery coordination within the State of Iowa. The purpose of this report is to provide an overview of the tabletop exercise, summarize and analyze exercise results, identify strengths which should be maintained and built upon, identify areas for further improvement, and support development of recommendations and corrective actions.
Resumo:
Time-lapse geophysical measurements are widely used to monitor the movement of water and solutes through the subsurface. Yet commonly used deterministic least squares inversions typically suffer from relatively poor mass recovery, spread overestimation, and limited ability to appropriately estimate nonlinear model uncertainty. We describe herein a novel inversion methodology designed to reconstruct the three-dimensional distribution of a tracer anomaly from geophysical data and provide consistent uncertainty estimates using Markov chain Monte Carlo simulation. Posterior sampling is made tractable by using a lower-dimensional model space related both to the Legendre moments of the plume and to predefined morphological constraints. Benchmark results using cross-hole ground-penetrating radar travel times measurements during two synthetic water tracer application experiments involving increasingly complex plume geometries show that the proposed method not only conserves mass but also provides better estimates of plume morphology and posterior model uncertainty than deterministic inversion results.
Resumo:
This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).
Resumo:
Ground-penetrating radar (GPR) and microgravimetric surveys have been conducted in the southern Jura mountains of western Switzerland in order to map subsurface karstic features. The study site, La Grande Rolaz cave, is an extensive system in which many portions have been mapped. By using small station spacing and careful processing for the geophysical data, and by modeling these data with topographic information from within the cave, accurate interpretations have been achieved. The constraints on the interpreted geologic models are better when combining the geophysical methods than when using only one of the methods, despite the general limitations of two-dimensional (2D) profiling. For example, microgravimetry can complement GPR methods for accurately delineating a shallow cave section approximately 10 X 10 mt in size. Conversely, GPR methods can be complementary in determining cavity depths and in verifying the presence of off-line features and numerous areas of small cavities and fractures, which may be difficult to resolve in microgravimetric data.
Resumo:
A systematic method to improve the quality (Q) factor of RF integrated inductors is presented in this paper. The proposed method is based on the layout optimization to minimize the series resistance of the inductor coil, taking into account both ohmic losses, due to conduction currents, and magnetically induced losses, due to eddy currents. The technique is particularly useful when applied to inductors in which the fabrication process includes integration substrate removal. However, it is also applicable to inductors on low-loss substrates. The method optimizes the width of the metal strip for each turn of the inductor coil, leading to a variable strip-width layout. The optimization procedure has been successfully applied to the design of square spiral inductors in a silicon-based multichip-module technology, complemented with silicon micromachining postprocessing. The obtained experimental results corroborate the validity of the proposed method. A Q factor of about 17 have been obtained for a 35-nH inductor at 1.5 GHz, with Q values higher than 40 predicted for a 20-nH inductor working at 3.5 GHz. The latter is up to a 60% better than the best results for a single strip-width inductor working at the same frequency.
Resumo:
O GPR utiliza técnica indireta para investigação das estruturas de subsuperfície, sendo caracterizado como método não-invasivo, o qual permite extrair informações ao longo do perfil de solo sem perfurar, sondar ou escavar. Este trabalho teve o objetivo de avaliar a utilização do GPR no estabelecimento de atributos físicos do solo em área de cultivo com cana-de-açúcar, além de estabelecer sua correlação com o método do cilindro volumétrico. A área de estudo está localizada no município de Bom Sucesso - PR, sendo utilizada com cultura da cana há mais de 20 anos. Foram obtidas amostras de solos indeformadas com cilindro volumétrico nas profundidades de 0-0,1, 0,1-0,2, 0,2-0,3, 0,3-0,4 e 0,4-0,5 m, ao longo de três transeptos paralelos, sendo o central referente à linha de plantio (transepto 2) e os outros dois correspondentes às entrelinhas laterais (transeptos 1 e 3). Os valores de densidade e porosidade total, obtidos por meio das amostras físicas, foram inicialmente interpretados para verificar o estado do solo nas linhas e nas entrelinhas de cana, nas cinco profundidades. Posteriormente, foram correlacionados com os valores das constantes dielétricas (K) adquiridos pelo georradar, porém apenas para a camada de 0,4-0,5 m, uma vez que as camadas superficiais até a profundidade de 0,4 m não puderam ser avaliadas devido às limitações técnicas do equipamento, aliadas às condições físicas e químicas do solo, que acabaram por prejudicar as reflexões. A densidade mostrou-se menor nas linhas, quando comparada às entrelinhas, para as camadas de 0-0,1 e 0,2-0,3 m. A porosidade total foi menor nas entrelinhas do que nas linhas na camada de 0-0,1 m. Os valores de K foram maiores nas linhas, onde a umidade e a porosidade total foram maiores, e menores nas entrelinhas, onde as densidades encontravam se próximas ao limite crítico. A correlação de K com a densidade e porosidade total não foi significativa. Pequenas modificações na porosidade do solo em função do aumento da densidade foram suficientes para diminuir o valor de K nas entrelinhas, devido à redução na quantidade de água nos poros. Esse fato pode ser confirmado pela correlação de K com a umidade. Assim, pode-se dizer que o georradar foi extremamente sensível à variação de umidade no solo, apresentando melhores resultados para esta variável do que para a densidade e porosidade total determinada por meio do cilindro volumétrico.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.