745 resultados para cost benefit analysis
Resumo:
The promise of search-driven development is that developers will save time and resources by reusing external code in their local projects. To efficiently integrate this code, users must be able to trust it, thus trustability of code search results is just as important as their relevance. In this paper, we introduce a trustability metric to help users assess the quality of code search results and therefore ease the cost-benefit analysis they undertake trying to find suitable integration candidates. The proposed trustability metric incorporates both user votes and cross-project activity of developers to calculate a "karma" value for each developer. Through the karma value of all its developers a project is ranked on a trustability scale. We present JBENDER, a proof-of-concept code search engine which implements our trustability metric and we discuss preliminary results from an evaluation of the prototype.
Resumo:
BACKGROUND: After bovine spongiform encephalopathy (BSE) emerged in European cattle livestock in 1986 a fundamental question was whether the agent established also in the small ruminants' population. In Switzerland transmissible spongiform encephalopathies (TSEs) in small ruminants have been monitored since 1990. While in the most recent TSE cases a BSE infection could be excluded, for historical cases techniques to discriminate scrapie from BSE had not been available at the time of diagnosis and thus their status remained unclear. We herein applied state-of-the-art techniques to retrospectively classify these animals and to re-analyze the affected flocks for secondary cases. These results were the basis for models, simulating the course of TSEs over a period of 70 years. The aim was to come to a statistically based overall assessment of the TSE situation in the domestic small ruminant population in Switzerland. RESULTS: In sum 16 TSE cases were identified in small ruminants in Switzerland since 1981, of which eight were atypical and six were classical scrapie. In two animals retrospective analysis did not allow any further classification due to the lack of appropriate tissue samples. We found no evidence for an infection with the BSE agent in the cases under investigation. In none of the affected flocks, secondary cases were identified. A Bayesian prevalence calculation resulted in most likely estimates of one case of BSE, five cases of classical scrapie and 21 cases of atypical scrapie per 100'000 small ruminants. According to our models none of the TSEs is considered to cause a broader epidemic in Switzerland. In a closed population, they are rather expected to fade out in the next decades or, in case of a sporadic origin, may remain at a very low level. CONCLUSIONS: In summary, these data indicate that despite a significant epidemic of BSE in cattle, there is no evidence that BSE established in the small ruminant population in Switzerland. Classical and atypical scrapie both occur at a very low level and are not expected to escalate into an epidemic. In this situation the extent of TSE surveillance in small ruminants requires reevaluation based on cost-benefit analysis.
Resumo:
As a consequence of flood impacts, communities inhabiting mountain areas are increasingly affected by considerable damage to infrastructure and property. The design of effective flood risk mitigation strategies and their subsequent implementation is crucial for a sustainable development in mountain areas. The assessment of the dynamic evolution of flood risk is the pillar of any subsequent planning process that is targeted at a reduction of the expected adverse consequences of the hazard impact. Given these premises, firstly, a comprehensive method to derive flood hazard process scenarios for well-defined areas at risk is presented. Secondly, conceptualisations of a static and dynamic flood risk assessment are provided. These are based on formal schemes to compute the risk mitigation performance of devised mitigation strategies within the framework of economic cost-benefit analysis. In this context, techniques suitable to quantify the expected losses induced by the identified flood impacts are provided.
Resumo:
Zukünftigen Lagersystemen werden aufgrund gewandelter Anforderungen Eigenschaften abverlangt, die mitunter in einem Widerspruch zueinander stehen. Im Folgenden sollen dazu betrieblich-technische Anforderungen und systemtechnische Lösungsansätze analysiert werden.
Resumo:
The evolution of pharmaceutical care is identified through a complete review of the literature published in the American Journal of Health-System Pharmacy, the sole comprehensive publication of institutional pharmacy practice. The evolution is categorized according to characteristics of structure (organizational structure, the role of the pharmacist), process (drug delivery systems, formulary management, acquiring drug products, methods to impact drug therapy decisions), and outcomes (cost of drug delivery, cost of drug acquisition and use, improved safety, improved health outcomes) recorded from the 1950s through the 1990s. While significant progress has been made in implementing basic drug distribution systems, levels of pharmacy involvement with direct patient care is still limited.^ A new practice framework suggests enhanced direct patient care involvement through increase in the efficiency and effectiveness of traditional pharmacy services. Recommendations advance internal and external organizational structure relationships that position pharmacists to fully use their unique skills and knowledge to impact drug therapy decisions and outcomes. Specific strategies facilitate expansion of the breadth and scope of each process component in order to expand the depth of integration of pharmacy and pharmaceutical care within the broad healthcare environment. Economic evaluation methods formally evaluate the impact of both operational and clinical interventions.^ Outcome measurements include specific recommendations and methods to increase efficiency of drug acquisition, emphasizing pharmacists' roles that impact physician prescribing decisions. Effectiveness measures include those that improve safety of drug distribution systems, decrease the potential of adverse drug therapy events, and demonstrate that pharmaceutical care can significantly contribute to improvement in overall health status.^ The implementation of the new framework is modeled on a case study at the M.D. Anderson Cancer Center. The implementation of several new drug distribution methods facilitated the redeployment of personnel from distributive functions to direct patient care activities with significant personnel and drug cost reduction. A cost-benefit analysis illustrates that framework process enhancements produced a benefit-to-cost ratio of 7.9. In addition, measures of effectiveness demonstrated significant levels of safety and enhanced drug therapy outcomes. ^
Resumo:
Objective The individual placement and support model of supported employment has been shown to be more effective than other vocational approaches in improving competitive work over 1-2 years in persons with severe mental illness. The authors evaluated the longer-term effects of the model compared with traditional vocational rehabilitation over 5 years. Method A randomized controlled trial compared supported employment to traditional vocational rehabilitation in 100 unemployed persons with severe mental illness. Competitive work and hospital admissions were tracked for 5 years, and interviews were conducted at 2 and 5 years to assess recovery attitudes and quality of life. A cost-benefit analysis compared program and total treatment costs to earnings from competitive employment. Results The beneficial effects of supported employment on work at 2 years were sustained over the 5-year follow-up period. Participants in supported employment were more likely to obtain competitive work than those in traditional vocational rehabilitation (65% compared with 33%), worked more hours and weeks, earned more wages, and had longer job tenures. Reliance on supported employment services for retaining competitive work decreased from 2 years to 5 years for participants in supported employment. Participants were also significantly less likely to be hospitalized, had fewer psychiatric hospital admissions, and spent fewer days in the hospital. The social return on investment was higher for supported employment participants, whether calculated as the ratio of work earnings to vocational program costs or of work earnings to total vocational program and mental health treatment costs. Conclusions The results demonstrate that the greater effectiveness of supported employment in improving competitive work outcomes is sustained beyond 2 years and suggest that supported employment programs contribute to reduced hospitalizations and produce a higher social return on investment.
Resumo:
Background. Obesity in America has increased exponentially since the 1970s with no sign of slowing down. It is a major public health problem, and is currently the second leading cause of preventable deaths in America (Flegal et al., 2010). Bariatric surgery is currently the only approved therapy that has shown to have a lasting impact on obese patients. While the initial cost of the surgery remains high, numerous cost-benefit analyses have demonstrated an overall cost saving within two to five years (McEwen et al., 2010). Only three states, including Texas, do not currently fund bariatric surgery through Medicare and Medicaid. ^ Objectives. To determine whether the current data on the cost-benefit analysis of bariatric surgery supports Texas' decision to not publicly fund bariatric surgery through its Medicare and Medicaid programs. ^ Methods. We conducted literature reviews to determine the current cost of obesity in Texas as well as the methods being employed to treat obesity currently. We then analyzed the history of bariatric surgery and its current implementation, looking at safety and the future benefits of bariatric surgery. We then looked at key cost-benefit analyses and meta-analyses to determine the cost effectiveness of bariatric surgery. We then analyzed both direct medical expenditures and indirect benefits of bariatric surgery. ^ Conclusions. If the obesity epidemic continues unabated, it will become one of the leading health expenditures in Texas within decades. Given that surgery is currently the only approved therapy for obesity that has been shown to be effective in the majority of patients, Texas' decision not to publicly fund bariatric surgery is short sighted.^
Resumo:
Infant Mortality has been made a point of emphasis by the Department of Health and Human Services in the Healthy People 2000, 2010, and 2020 priorities. This study used the Behavioral Model for Vulnerable Populations to consider a number of factors which impact infant mortality in the indigent populations in the State of Texas. The primary focus of this study was the enabling factor of community resources, specifically the program used by each county to provide care to their indigent population. The Legislature of the State of Texas requires that each state have a program set up within a Hospital District, Public Hospital or develop a County Indigent Health Care Program (CIHCP) in order to provide the basic health care needs of their most vulnerable residents. We sought to determine whether the development of a CICHP without an appointed hospital to provide the care would have an adverse effect on residents seeking care and increase infant mortality. A Poisson Regression Analysis was used to analyze incidence rate ratios adjusting for race/ethnicity and wealth/poverty variables. Our study showed that counties using a CIHCP had significantly lower infant mortality rates when compared to counties using a hospital district and were statistically equivalent to counties using a public hospital program or a combination of service programs. This relationship was maintained when adjusted incidence rate ratios were calculated. This may give evidence that counties struggling to fund a public hospital or hospital district may be able to find a more cost-effective alternative in the CIHCP without adversely affecting the health status of their residents. More cost-benefit analysis and controlling analysis must be done to further characterize this relationship. ^
Resumo:
This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.
Resumo:
This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.
Resumo:
La heterogeneidad del medio geológico introduce en el proyecto de obra subterránea un alto grado de incertidumbre que debe ser debidamente gestionado a fin de reducir los riesgos asociados, que son fundamentalmente de tipo geotécnico. Entre los principales problemas a los que se enfrenta la Mecánica de Rocas moderna en el ámbito de la construcción subterránea, se encuentran la fluencia de roca en túneles (squeezing) y la rotura de pilares de carbón. Es ampliamente conocido que su aparición causa importantes perjuicios en el coste y la seguridad de los proyectos por lo que su estudio, ha estado tradicionalmente vinculado a la predicción de su ocurrencia. Entre las soluciones existentes para la determinación de estos problemas se encuentran las que se basan en métodos analíticos y numéricos. Estas metodologías son capaces de proporcionar un alto nivel de representatividad respecto del comportamiento geotécnico real, sin embargo, su utilización solo es posible cuando se dispone de una suficiente caracterización geotécnica y por tanto de una detallada definición de los parámetros que alimentan los complejos modelos constitutivos y criterios de rotura que los fenómenos estudiados requieren. Como es lógico, este nivel de definición solo es posible cuando se alcanzan etapas avanzadas de proyecto, incluso durante la propia construcción, a fin de calibrar adecuadamente los parámetros introducidos en los modelos, lo que supone una limitación de uso en etapas iniciales, cuando su predicción tiene verdadero sentido. Por su parte, los métodos empíricos permiten proporcionar soluciones a estos complejos problemas de un modo sencillo, con una baja parametrización y, dado su eminente enfoque observacional, de gran fiabilidad cuando se implementan sobre condiciones de contorno similares a las originales. La sencillez y escasez de los parámetros utilizados permiten a estas metodologías ser utilizadas desde las fases preliminares del proyecto, ya que estos constituyen en general, información habitual de fácil y económica adquisición. Este aspecto permite por tanto incorporar la predicción desde el principio del proceso de diseño, anticipando el riesgo en origen. En esta tesis doctoral, se presenta una nueva metodología empírica que sirve para proporcionar predicciones para la ocurrencia de squeezing y el fallo de pilares de carbón basada en una extensa recopilación de información de casos reales de túneles y minas en las que ambos fenómenos fueron evaluados. Esta información, recogida de referencias bibliográficas de prestigio, ha permitido recopilar una de las más extensas bases de datos existentes hasta la fecha relativa a estos fenómenos, lo que supone en sí mismo una importante contribución sobre el estado del arte. Con toda esta información, y con la ayuda de la teoría de clasificadores estadísticos, se ha implementado sobre las bases de datos un clasificador lineal de tipo regresión logística que permite hacer predicciones sobre la ocurrencia de ambos fenómenos en términos de probabilidad, y por tanto ponderar la incertidumbre asociada a la heterogeneidad incorporada por el medio geológico. Este aspecto del desarrollo es el verdadero valor añadido proporcionado por la tesis y la principal ventaja de la solución propuesta respecto de otras metodologías empíricas. Esta capacidad de ponderación probabilística permite al clasificador constituir una solución muy interesante como metodología para la evaluación de riesgo geotécnico y la toma de decisiones. De hecho, y como ejercicio de validación práctica, se ha implementado la solución desarrollada en un modelo coste-beneficio asociado a la optimización del diseño de pilares involucrados en una de mina “virtual” explotada por tajos largos. La capacidad del clasificador para cuantificar la probabilidad de fallo del diseño, junto con una adecuada cuantificación de las consecuencias de ese fallo, ha permitido definir una ley de riesgo que se ha incorporado al balance de costes y beneficios, que es capaz, a partir del redimensionamiento iterativo del sistema de pilares y de la propia configuración de la mina, maximizar el resultado económico del proyecto minero bajo unas condiciones de seguridad aceptables, fijadas de antemano. Geological media variability introduces to the subterranean project a high grade of uncertainty that should be properly managed with the aim to reduce the associated risks, which are mainly geotechnical. Among the major problems facing the modern Rock Mechanics in the field of underground construction are both, the rock squeezing while tunneling and the failure of coal pillars. Given their harmfulness to the cost and safety of the projects, their study has been traditionally linked to the determination of its occurrence. Among the existing solutions for the determination of these problems are those that are based on analytical and numerical methods. Those methodologies allow providing a high level of reliability of the geotechnical behavior, and therefore a detailed definition of the parameters that feed the complex constitutive models and failure criteria that require the studied phenomena. Obviously, this level of definition is only possible when advanced stages of the project are achieved and even during construction in order to properly calibrate the parameters entered in the models, which suppose a limited use in early stages, when the prediction has true sense. Meanwhile, empirical methods provide solutions to these complex problems in a simple way, with low parameterization and, given his observational scope, with highly reliability when implemented on similar conditions to the original context. The simplicity and scarcity of the parameters used allow these methodologies be applied in the early stages of the project, since that information should be commonly easy and cheaply to get. This aspect can therefore incorporate the prediction from the beginning of the design process, anticipating the risk beforehand. This thesis, based on the extensive data collection of case histories of tunnels and underground mines, presents a novel empirical approach used to provide predictions for the occurrence of both, squeezing and coal pillars failures. The information has been collected from prestigious references, providing one of the largest databases to date concerning phenomena, a fact which provides an important contribution to the state of the art. With all this information, and with the aid of the theory of statistical classifiers, it has been implemented on both databases, a type linear logistic regression classifier that allows predictions about the occurrence of these phenomena in terms of probability, and therefore weighting the uncertainty associated with geological variability. This aspect of the development is the real added value provided by the thesis and the main advantage of the proposed solution over other empirical methodologies. This probabilistic weighting capacity, allows being the classifier a very interesting methodology for the evaluation of geotechnical risk and decision making. In fact, in order to provide a practical validation, we have implemented the developed solution within a cost-benefit analysis associated with the optimization of the design of coal pillar systems involved in a "virtual" longwall mine. The ability of the classifier to quantify the probability of failure of the design along with proper quantification of the consequences of that failure, has allowed defining a risk law which is introduced into the cost-benefits model, which is able, from iterative resizing of the pillar system and the configuration of the mine, maximize the economic performance of the mining project under acceptable safety conditions established beforehand.
Resumo:
- Towards a methodology for prospective deployment of ICT infrastructures - (Technologies & Architectures) - Key deployment parameters (network requirements) - User requirements - A proposal for Cost‐Benefit Analysis
Resumo:
This paper groups recent supply chain management research focused on organizational design and its software support. The classification encompasses criteria related to research methodology and content. Empirical studies from management science focus on network types and organizational fit. Novel planning algorithms and innovative coordination schemes are developed mostly in the field of operations research in order to propose new software features. Operations and production management realize cost-benefit analysis of IT software implementations. The success of software solutions for network coordination depends strongly on the fit of three dimensions: network configuration, coordination scheme and software functionality. This paper concludes with proposals for future research on unaddressed issues within and among the identified research streams.
Resumo:
There exist different ways for defining a welfare function. Traditionally, welfare economic theory foundation is based on the Net Present Value (NPV) calculation where the time dependent preferences of considered agents are taken into account. However, the time preferences, remains a controversial subject. Currently, the traditional approach employs a unique discount rate for various agents. Nevertheless, this way of discounting appears inconsistent with sustainable development. New research work suggests that the discount rate may not be a homogeneous value. The discount rates may change following the individual’s preferences. A significant body of evidence suggests that people do not behave following a constant discount rate. In fact, UK Government has quickly recognized the power of the arguments for time-varying rates, as it has done in its official guidance to Ministries on the appraisal of investments and policies. Other authors deal with not just time preference but with uncertainty about future income (precautionary saving). In a situation in which economic growth rates are similar across time periods, the rationale for declining social optimal discount rates is driven by the preferences of the individuals in the economy, rather than expectations of growth. However, these approaches have been mainly focused on long-term policies where intergenerational risks may appear. The traditional cost-benefit analysis (CBA) uses a unique discount rate derived from market interest rates or investment rates of return for discounting the costs and benefits of all social agents included in the CBA. However, recent literature showed that a more adequate measure of social benefit is possible by using different discount rates including inter-temporal preferences rate of users, private investment discount rate and intertemporal preferences rate of government. Actually, the costs of opportunity may differ amongst individuals, firms, governments, or society in general, as do the returns on savings. In general, the firms or operators require an investment rate linked to the current return on savings, while the discount rate of consumers-users depends on their time preferences with respect of the current and the future consumption, as well as society can take into account the intergenerational well-being, adopting a lower discount rate for today’s generation. Time discount rate of social actors (users, operators, government and society) places a lower value in a future gain, but the uncertainty about future income strongly determines the individual preferences. These time and uncertainty depends on preferences and should be integrated into a transport policy formulation that may have significant social impacts. The discount rate of a user cannot be the same than the operator’s discount rate. The preferences of both are different. In addition, another school of thought suggests that people, such as a social group, may have different attitudes towards future costs and benefits. Particularly, the users have different discount rates related to their income. Some research work tried to modify user discount rates using a compensating weight which represents the inverse of household income level. The inter-temporal preferences are a proxy of the willingness to pay during the time. Its consideration is important in order to make acceptable or not a policy or investment
Resumo:
Los sistemas transaccionales tales como los programas informáticos para la planificación de recursos empresariales (ERP software) se han implementado ampliamente mientras que los sistemas analíticos para la gestión de la cadena de suministro (SCM software) no han tenido el éxito deseado por la industria de tecnología de información (TI). Aunque se documentan beneficios importantes derivados de las implantaciones de SCM software, las empresas industriales son reacias a invertir en este tipo de sistemas. Por una parte esto es debido a la falta de métodos que son capaces de detectar los beneficios por emplear esos sistemas, y por otra parte porque el coste asociado no está identificado, detallado y cuantificado suficientemente. Los esquemas de coordinación basados únicamente en sistemas ERP son alternativas válidas en la práctica industrial siempre que la relación coste-beneficio esta favorable. Por lo tanto, la evaluación de formas organizativas teniendo en cuenta explícitamente el coste debido a procesos administrativos, en particular por ciclos iterativos, es de gran interés para la toma de decisiones en el ámbito de inversiones en TI. Con el fin de cerrar la brecha, el propósito de esta investigación es proporcionar métodos de evaluación que permitan la comparación de diferentes formas de organización y niveles de soporte por sistemas informáticos. La tesis proporciona una amplia introducción, analizando los retos a los que se enfrenta la industria. Concluye con las necesidades de la industria de SCM software: unas herramientas que facilitan la evaluación integral de diferentes propuestas de organización. A continuación, la terminología clave se detalla centrándose en la teoría de la organización, las peculiaridades de inversión en TI y la tipología de software de gestión de la cadena de suministro. La revisión de la literatura clasifica las contribuciones recientes sobre la gestión de la cadena de suministro, tratando ambos conceptos, el diseño de la organización y su soporte por las TI. La clasificación incluye criterios relacionados con la metodología de la investigación y su contenido. Los estudios empíricos en el ámbito de la administración de empresas se centran en tipologías de redes industriales. Nuevos algoritmos de planificación y esquemas de coordinación innovadoras se desarrollan principalmente en el campo de la investigación de operaciones con el fin de proponer nuevas funciones de software. Artículos procedentes del área de la gestión de la producción se centran en el análisis de coste y beneficio de las implantaciones de sistemas. La revisión de la literatura revela que el éxito de las TI para la coordinación de redes industriales depende en gran medida de características de tres dimensiones: la configuración de la red industrial, los esquemas de coordinación y las funcionalidades del software. La literatura disponible está enfocada sobre todo en los beneficios de las implantaciones de SCM software. Sin embargo, la coordinación de la cadena de suministro, basándose en el sistema ERP, sigue siendo la práctica industrial generalizada, pero el coste de coordinación asociado no ha sido abordado por los investigadores. Los fundamentos de diseño organizativo eficiente se explican en detalle en la medida necesaria para la comprensión de la síntesis de las diferentes formas de organización. Se han generado varios esquemas de coordinación variando los siguientes parámetros de diseño: la estructura organizativa, los mecanismos de coordinación y el soporte por TI. Las diferentes propuestas de organización desarrolladas son evaluadas por un método heurístico y otro basado en la simulación por eventos discretos. Para ambos métodos, se tienen en cuenta los principios de la teoría de la organización. La falta de rendimiento empresarial se debe a las dependencias entre actividades que no se gestionan adecuadamente. Dentro del método heurístico, se clasifican las dependencias y se mide su intensidad basándose en factores contextuales. A continuación, se valora la idoneidad de cada elemento de diseño organizativo para cada dependencia específica. Por último, cada forma de organización se evalúa basándose en la contribución de los elementos de diseño tanto al beneficio como al coste. El beneficio de coordinación se refiere a la mejora en el rendimiento logístico - este concepto es el objeto central en la mayoría de modelos de evaluación de la gestión de la cadena de suministro. Por el contrario, el coste de coordinación que se debe incurrir para lograr beneficios no se suele considerar en detalle. Procesos iterativos son costosos si se ejecutan manualmente. Este es el caso cuando SCM software no está implementada y el sistema ERP es el único instrumento de coordinación disponible. El modelo heurístico proporciona un procedimiento simplificado para la clasificación sistemática de las dependencias, la cuantificación de los factores de influencia y la identificación de configuraciones que indican el uso de formas organizativas y de soporte de TI más o menos complejas. La simulación de eventos discretos se aplica en el segundo modelo de evaluación utilizando el paquete de software ‘Plant Simulation’. Con respecto al rendimiento logístico, por un lado se mide el coste de fabricación, de inventario y de transporte y las penalizaciones por pérdida de ventas. Por otro lado, se cuantifica explícitamente el coste de la coordinación teniendo en cuenta los ciclos de coordinación iterativos. El método se aplica a una configuración de cadena de suministro ejemplar considerando diversos parámetros. Los resultados de la simulación confirman que, en la mayoría de los casos, el beneficio aumenta cuando se intensifica la coordinación. Sin embargo, en ciertas situaciones en las que se aplican ciclos de planificación manuales e iterativos el coste de coordinación adicional no siempre conduce a mejor rendimiento logístico. Estos resultados inesperados no se pueden atribuir a ningún parámetro particular. La investigación confirma la gran importancia de nuevas dimensiones hasta ahora ignoradas en la evaluación de propuestas organizativas y herramientas de TI. A través del método heurístico se puede comparar de forma rápida, pero sólo aproximada, la eficiencia de diferentes formas de organización. Por el contrario, el método de simulación es más complejo pero da resultados más detallados, teniendo en cuenta parámetros específicos del contexto del caso concreto y del diseño organizativo. ABSTRACT Transactional systems such as Enterprise Resource Planning (ERP) systems have been implemented widely while analytical software like Supply Chain Management (SCM) add-ons are adopted less by manufacturing companies. Although significant benefits are reported stemming from SCM software implementations, companies are reluctant to invest in such systems. On the one hand this is due to the lack of methods that are able to detect benefits from the use of SCM software and on the other hand associated costs are not identified, detailed and quantified sufficiently. Coordination schemes based only on ERP systems are valid alternatives in industrial practice because significant investment in IT can be avoided. Therefore, the evaluation of these coordination procedures, in particular the cost due to iterations, is of high managerial interest and corresponding methods are comprehensive tools for strategic IT decision making. The purpose of this research is to provide evaluation methods that allow the comparison of different organizational forms and software support levels. The research begins with a comprehensive introduction dealing with the business environment that industrial networks are facing and concludes highlighting the challenges for the supply chain software industry. Afterwards, the central terminology is addressed, focusing on organization theory, IT investment peculiarities and supply chain management software typology. The literature review classifies recent supply chain management research referring to organizational design and its software support. The classification encompasses criteria related to research methodology and content. Empirical studies from management science focus on network types and organizational fit. Novel planning algorithms and innovative coordination schemes are developed mostly in the field of operations research in order to propose new software features. Operations and production management researchers realize cost-benefit analysis of IT software implementations. The literature review reveals that the success of software solutions for network coordination depends strongly on the fit of three dimensions: network configuration, coordination scheme and software functionality. Reviewed literature is mostly centered on the benefits of SCM software implementations. However, ERP system based supply chain coordination is still widespread industrial practice but the associated coordination cost has not been addressed by researchers. Fundamentals of efficient organizational design are explained in detail as far as required for the understanding of the synthesis of different organizational forms. Several coordination schemes have been shaped through the variation of the following design parameters: organizational structuring, coordination mechanisms and software support. The different organizational proposals are evaluated using a heuristic approach and a simulation-based method. For both cases, the principles of organization theory are respected. A lack of performance is due to dependencies between activities which are not managed properly. Therefore, within the heuristic method, dependencies are classified and their intensity is measured based on contextual factors. Afterwards the suitability of each organizational design element for the management of a specific dependency is determined. Finally, each organizational form is evaluated based on the contribution of the sum of design elements to coordination benefit and to coordination cost. Coordination benefit refers to improvement in logistic performance – this is the core concept of most supply chain evaluation models. Unfortunately, coordination cost which must be incurred to achieve benefits is usually not considered in detail. Iterative processes are costly when manually executed. This is the case when SCM software is not implemented and the ERP system is the only available coordination instrument. The heuristic model provides a simplified procedure for the classification of dependencies, quantification of influence factors and systematic search for adequate organizational forms and IT support. Discrete event simulation is applied in the second evaluation model using the software package ‘Plant Simulation’. On the one hand logistic performance is measured by manufacturing, inventory and transportation cost and penalties for lost sales. On the other hand coordination cost is explicitly considered taking into account iterative coordination cycles. The method is applied to an exemplary supply chain configuration considering various parameter settings. The simulation results confirm that, in most cases, benefit increases when coordination is intensified. However, in some situations when manual, iterative planning cycles are applied, additional coordination cost does not always lead to improved logistic performance. These unexpected results cannot be attributed to any particular parameter. The research confirms the great importance of up to now disregarded dimensions when evaluating SCM concepts and IT tools. The heuristic method provides a quick, but only approximate comparison of coordination efficiency for different organizational forms. In contrast, the more complex simulation method delivers detailed results taking into consideration specific parameter settings of network context and organizational design.