1000 resultados para Simulação de sistemas de Microgeração


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In an ever more competitive environment, power distribution companies must satisfy two conflicting objectives: minimizing investment costs and the satisfaction of reliability targets. The network reconfiguration of a distribution system is a technique that well adapts to this new deregulated environment for it allows improvement of reliability indices only opening and closing switches, without the onus involved in acquiring new equipment. Due to combinatorial explosion problem characteristic, in the solution are employed metaheuristics methods, which converge to optimal or quasi-optimal solutions, but with a high computational effort. As the main objective of this work is to find the best configuration(s) of the distribution system with the best levels of reliability, the objective function used in the metaheuristics is to minimize the LOLC - Loss Of Load Cost, which is associated with both, number and duration of electric power interruptions. Several metaheuristics techniques are tested, and the tabu search has proven to be most appropriate to solve the proposed problem. To characterize computationally the problem of the switches reconfiguring was developed a vector model (with integers) of the representation of the switches, where each normally open switch is associated with a group of normally closed switches. In this model simplifications have been introduced to reduce computational time and restrictions were made to exclude solutions that do not supply energy to any load point of the system. To check violation of the voltage and loading criteria a study of power flow for the ten best solutions is performed. Also for the ten best solutions a reliability evaluation using Monte Carlo sequential simulation is performed, where it is possible to obtain the probability distributions of the indices and thus calculate the risk of paying penalty due to not meeting the goals. Finally, the methodology is applied in a real Brazilian distribution network, and the results are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEIS

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The discussions about the energy rationalization are gaining more and more space on the everyday of engineers and other professionals in the field of energy. A greater focus is being tied to commercial buildings, because they are one of the biggest responsible for the high energetic expenditure according to the National Energetic Balance, especially by the use of air conditioners for the people’s thermal comfort. Such finding made INMETRO to develop a building labeling procedure through th National Program of Electric Energy Conservation in Buildings; by means of this systematic, the built areas are classified by levels that go from A(the best) to E(the worst), taking into account envelopment, illumination system and air conditioning. A bonus process based on water rationalization, use of renewable energy sources, cogeneration systems or technical innovations, allows the classification to be changed up to one level. A study made exactly on a commercial building, the building of Foundation for Technological and Scientific Development located inside of the College of Engineering of Guaratinguetá, sought to identify technical/economic alternatives for the building certification and appealed to the bonus based on water rationalization. The present study is based on analysis of deploying a cogeneration system formed by internal combustion engine and an absorption refrigeration system as bonus alternative, so that the costs are analyzed regarding energy consumption and use of the motor. With the calculations and results, the viability of the building to receive a bonus from INMETRO through its National Program for Energy Conservation in Buildings is studied and concluded from this study whether or not you can get a better level of energy efficiency for the building in question... (Complete abstract click electronic access below)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A great competition between companies happens nowadays, due to, among other factors, the globalized economic system, the growing consumer demand and the technological advances. This fact implies the need for fast and efficient tools in decision making. A validated simulation model is able to perform this task. Thus, it was parameterized a simulation model of a fuel distribution terminal. It is a complex system because of its great variability. The model´s data input were collected, however the model was not statistically validated, in other word, does not adequately represent the real system. A search was made for the possible causes of this fact: dividing the compartments of tanker trucks, data collection may have been insufficient, inefficient model for unloading of biofuels

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In radiotherapy, computational systems are used for radiation dose determination in the treatment’s volume and radiometric parameters quality analysis of equipment and field irradiated. Due to the increasing technological advancement, several research has been performed in brachytherapy for different computational algorithms development which may be incorporated to treatment planning systems, providing greater accuracy and confidence in the dose calculation. Informatics and information technology fields undergo constant updating and refinement, allowing the use Monte Carlo Method to simulate brachytherapy source dose distribution. The methodology formalization employed to dosimetric analysis is based mainly in the American Association of Physicists in Medicine (AAPM) studies, by Task Group nº 43 (TG-43) and protocols aimed at dosimetry of these radiation sources types. This work aims to analyze the feasibility of using the MCNP-5C (Monte Carlo N-Particle) code to obtain radiometric parameters of brachytherapy sources and so to study the radiation dose variation in the treatment planning. Simulations were performed for the radiation dose variation in the source plan and determined the dosimetric parameters required by TG-43 formalism for the characterization of the two high dose rate iridium-192 sources. The calculated values were compared with the presents in the literature, which were obtained with different Monte Carlo simulations codes. The results showed excellent consistency with the compared codes, enhancing MCNP-5C code the capacity and viability in the sources dosimetry employed in HDR brachytherapy. The method employed may suggest a possible incorporation of this code in the treatment planning systems provided by manufactures together with the equipment, since besides reducing acquisition cost, it can also make the used computational routines more comprehensive, facilitating the brachytherapy ...

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEIS

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper shows the modeling and control of a single-phase full-bridge inverter with high-frequency transformer that may be used as part of a two-stage converter with transformerless DC-DC side or as a single-stage converter (simple DC-AC converter) for grid-connected PV applications. The inverter is modeled in order to obtain a small-signal transfer function used to design the P+Resonant current controller. A highfrequency step-up transformer results in reduced voltage switches and better efficiency compared with converters in which the transformer is used on the DC-DC side. Simulations and experimental results with a 200 W prototype are shown. 1

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)