939 resultados para Rights-of-Way.
Resumo:
The Irish service was last reviewed in 1980. Much of the valuable recommendations made at that time have been given effect. The present Review Group examined that report and, to the extend that recommendations then made have not been acted upon, incorporated them in this report. The views and rights of mothers were of course paramount in the consideration of the members of the Group and issues of choice, privacy, consent and information were considered and appropriate recommendations made. Download the Report here
Resumo:
The Strategy sets out an ambitious series of objectives to guide childrenâ?Ts policy over the next ten years. It sets out a common vision to work towards. It identifies six principles to guide all actions to be taken and it proposes a more holistic way of thinking about children which reflects contemporary understanding of childhood. To realise the vision the Strategy then sets three National Goals: to listen, think and act more effectively for children. New structures are proposed to deliver better co-ordination between government departments and the agencies providing services to children so that the Goals can be achieved. Rooted in the positive vision of the UN Convention on the Rights of the Child, it represents a different way of doing business, which will, if we all work together, help us become a society which fully values and respects its children. Download the Report here
Resumo:
Interim Report of the Steering Group on the Review of the Mental Health Act 2001 There is a commitment in the Programme for Government to review the Mental Health Act 2001. In line with this, Minister Lynch appointed a Steering Group to review the Mental Health Act 2001. Their report is now with an Expert Group. The review takes accounts of the significant changes in thinking about the delivery of mental health services that have taken place in the last ten years (including the introduction of the UN Convention on the Rights of People with Disabilities (CRPD), the shift to community based services, the adoption of a recovery approach in every aspect of service delivery and the involvement of service users as partners in their own care and in the development of the service). Click here to download PDF 471kb
Resumo:
Barnardos supports children whose well-being is under threat, by working with them, their families and communities and by campaigning for the rights of children. Barnardos was established in Ireland in 1962 and is Ireland’s leading independent Children's charity. Â
Resumo:
This article discusses the construction of tri-sector partnerships in three projects conducted in Brazil in different fields of intervention of public policy (access to water, basic education and performance of boards of rights of children and adolescents). Collaborative articulations involving the players from three sectors (the State, civil society and the market) are practices that are little studied in the Brazilian and even in the international context, as tri-sector partnerships are rare, despite the proliferation of lines of discourse in support of alliances between governments and civil society or between companies and NGOs in the management of public policy. As a research strategy, this study resorted to cooperative inquiry, a method that involves breaking down the boundaries between the subjects and the objects of the analysis. Besides working toward a better understanding of the challenges of building tri-sector partnerships in the Brazilian context, the article also tries to show the relevance to public policy studies of investigative methods based on the subjects studied, as a means of developing an understanding of the practices, lines of discourse and dilemmas linked to social action in social programs.
Resumo:
Stability berms are commonly constructed where roadway embankments cross soft or unstable ground conditions. Under certain circumstances, the construction of stability berms cause unfavorable environmental impacts, either directly or indirectly, through their effect on wetlands, endangered species habitat, stream channelization, longer culvert lengths, larger right-of-way purchases, and construction access limits. Due to an ever more restrictive regulatory environment, these impacts are problematic. The result is the loss of valuable natural resources to the public, lengthy permitting review processes for the department of transportation and permitting agencies, and the additional expenditures of time and money for all parties. The purpose of this project was to review existing stability berm alternatives for potential use in environmentally sensitive areas. The project also evaluates how stabilization technologies are made feasible, desirable, and cost-effective for transportation projects and determines which alternatives afford practical solutions for avoiding and minimizing impacts to environmentally sensitive areas. An online survey of engineers at state departments of transportation was also conducted to assess the frequency and cost effectiveness of the various stabilization technologies. Geotechnical engineers that responded to the survey overwhelmingly use geosynthetic reinforcement as a suitable and cost-effective solution for stabilizing embankments and cut slopes. Alternatively, chemical stabilization and installation of lime/cement columns is rarely a remediation measure employed by state departments of transportation.
Resumo:
This paper aims to identify and assess the main items in the strategy followed by the EU and its member states on the externalisation of their asylum function. First, it analyses the European harmonisation of the return to safe third countries and to countries of first asylum, which is carried out by means of readmission agreements. Second, it refers to the strategies defined by the Hague and the Stockholm programs concerning the External Aspects of the European Union Asylum Policy, on the detention centres for illegal immigrants abroad, and on the proposals for delocalisation of asylum applications processing centres beyond the EU borders. Finally, this paper considers whether the strategy of externalisation of the function of asylum sometimes lacks legitimacy, and to what extent there is a fair balance between the interests of the states and the protection of the human rights of refugees and asylum seekers.
Resumo:
It is commonly regarded that the overuse of traffic control devices desensitizes drivers and leads to disrespect, especially for low-volume secondary roads with limited enforcement. The maintenance of traffic signs is also a tort liability concern, exacerbated by unnecessary signs. The Federal Highway Administration’s (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) and the Institute of Transportation Engineer’s (ITE) Traffic Control Devices Handbook provide guidance for the implementation of STOP signs based on expected compliance with right-of-way rules, provision of through traffic flow, context (proximity to other controlled intersections), speed, sight distance, and crash history. The approach(es) to stop is left to engineering judgment and is usually dependent on traffic volume or functional class/continuity of system. Although presently being considered by the National Committee on Traffic Control Devices, traffic volume itself is not given as a criterion for implementation in the MUTCD. STOP signs have been installed at many locations for various reasons which no longer (or perhaps never) met engineering needs. If in fact the presence of STOP signs does not increase safety, removal should be considered. To date, however, no guidance exists for the removal of STOP signs at two-way stop-controlled intersections. The scope of this research is ultra-low-volume (< 150 daily entering vehicles) unpaved intersections in rural agricultural areas of Iowa, where each of the 99 counties may have as many as 300 or more STOP sign pairs. Overall safety performance is examined as a function of a county excessive use factor, developed specifically for this study and based on various volume ranges and terrain as a proxy for sight distance. Four conclusions are supported: (1) there is no statistical difference in the safety performance of ultra-low-volume stop-controlled and uncontrolled intersections for all drivers or for younger and older drivers (although interestingly, older drivers are underrepresented at both types of intersections); (2) compliance with stop control (as indicated by crash performance) does not appear to be affected by the use or excessive use of STOP signs, even when adjusted for volume and a sight distance proxy; (3) crash performance does not appear to be improved by the liberal use of stop control; (4) safety performance of uncontrolled intersections appears to decline relative to stop-controlled intersections above about 150 daily entering vehicles. Subject to adequate sight distance, traffic professionals may wish to consider removal of control below this threshold. The report concludes with a section on methods and legal considerations for safe removal of stop control.
Resumo:
In urban communities, there are often limited amounts of right-of-way available for establishing a large setback distance from the curb for fixed objects. Urban communities must constantly weigh the cost of purchasing additional right-of-way for clear zones against the risk of fixed object crashes. From 2004 to 2006, this type of crash on curbed roads represented 15% of all fatal crashes and 3% of all crashes in the state of Iowa. Many states have kept the current minimum AASHTO recommendations as their minimum clear zone standards; however, other states have decided that these recommendations are insufficient and have increased the required minimum clear zone distance to better suit the judgment of local designers. This report presents research on the effects of the clear zone on urban curbed streets. The research was conducted in two phases. The first phase involved a synthesis of practice that included a literature review and a survey of practices in jurisdictions that have developmental and historical patterns similar to those of Iowa. The second phase involved investigating the benefits of a 10 ft clear zone, which included examining urban corridors in Iowa that meet or do not meet the 10 ft clear zone goal. The results of this study indicate that a consistent fixed object offset results in a reduction in the number of fixed object crashes, a 5 ft clear zone is most effective when the goal is to minimize the number of fixed object c ashes, and a 3 ft clear zone is most effective when the goal is to minimize the cost of fixed object crashes.
Resumo:
In an earlier research project, HR-204, the magnitude and nature of highway related tort claims against counties in Iowa were investigated. However, virtually all of the claims identified in that research resulted from incidents that occurred in areas with predominantly agricultural land use. With recent increases in the rural non-farm population, many traditionally urban problems are also appearing in built-up areas under county jurisdiction. This trend is expected to continue so that counties must anticipate a change in the nature of the tort claims they will encounter. Problems that heretofore have been unique to cities may become commonplace in areas for which counties are responsible. The research reported here has been directed toward an investigation of those problems in rural subdivisions that lead to claims growing out of the provision of highway services by counties. Lacking a sufficient database among counties for the types of tort claims of interest in this research, a survey was sent to 259 cities in Iowa in order to identify highway related problems leading to those claims. The survey covered claims during a five year period from 1975 to 1980. Over one-third of the claims reported were based on alleged street defects. Another 34 percent of the claims contained allegations of damages due to backup of sanitary sewers or defects in sidewalks. By expanding the sample from the 164 cities that responded to the survey, it was estimated that a total of $49,000,000 in claims had been submitted to all 259 cities. Over 34% of this amount resulted from alleged defects in the use of traffic signs, signals, and markings. Another 42% arose from claims of defects in streets and sidewalks. Payments in settlement of claims were about 13.4% of the amount asked for those claims closed during the period covered by the survey. About $9,000,000 in claims was pending on June 30, 1980 according to the information furnished. Officials from 23 cities were interviewed to provide information on measures to overcome the problems leading to tort claims. On the basis of this information, actions have been proposed that can be undertaken by counties to reduce the potential for highway-related claims resulting from their responsibilities in rural subdivisions and unincorporated communities. Suggested actions include the eight recommendations contained in the final report for the previous research under HR-204. In addition, six recommendations resulted from this research, as follows: 1. Counties should adopt county subdivision ordinances. 2. A reasonable policy concerning sidewalks should be adopted. 3. Counties should establish and implement a system for setting road maintenance priorities. 4. Counties should establish and implement a procedure for controlling construction or maintenance activities within the highway right of way. 5. Counties should establish and implement a system to record complaints that are received relating to highway maintenance and to assure timely correction of defective conditions leading to such complaints. 6. Counties should establish and implement a procedure to ensure timely advice of highway defects for which notice is not otherwise received.
Resumo:
Borrow areas are created where soil is removed to provide needed fill material for highway and other construction projects. Where these areas are located beyond the highway right-of-way, they must be restored and returned to useful purposes. In Iowa, borrow areas are often developed on agricultural lands and therefore, it is necessary to return them to agricultural uses whenever possible. This research project was established to evaluate the changes in row crop productivity where borrow is removed for highway construction. Secondly, several reclamation techniques were selected to be applied to borrow area research sites and the response of crops to each treatment will be evaluated. All borrow area research sites were selected in 1977 from Iowa Department of Transportation construction plans. The Audubon and Buchanan County sites were completed in the fall of 1977 and May 1978, respectively. Both were used for research in 1978, 1979, and 1980. The two remaining sites in Hamilton and Lee Counties were completed in the fall of 1978 and research was conducted at these sites in 1979, 1980, and 1981. In this report, the 1981 results from the Hamilton and Lee County borrow sites will be presented. Secondly, a summary of the three years of research from each borrow area will be presented along with specific and general conclusions from the research project.
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway.
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1973 revision to 1970 policy.)
Resumo:
This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1990 revision to 1985 policy.)
Resumo:
This chapter covers initial placement, adjustment, and maintenance of utility facilities in, on, above or below the right-of-way of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed to ensure the safety of the highway user and the integrity of the highway. (2012 revision to 2005 policy.)