844 resultados para Project 2006-036-A : Multi-Outcome Construction Policies


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Multi-level concrete buildings requrre substantial temporary formwork structures to support the slabs during construction. The primary function of this formwork is to safely disperse the applied loads so that the slab being constructed, or the portion of the permanent structure already constructed, is not overloaded. Multi-level formwork is a procedure in which a limited number of formwork and shoring sets are cycled up the building as construction progresses. In this process, each new slab is supported by a number of lower level slabs. The new slab load is, essentially, distributed to these supporting slabs in direct proportion to their relative stiffness. When a slab is post-tensioned using draped tendons, slab lift occurs as a portion of the slab self-weight is balanced. The formwork and shores supporting that slab are unloaded by an amount equivalent to the load balanced by the post-tensioning. This produces a load distribution inherently different from that of a conventionally reinforced slab. Through , theoretical modelling and extensive on-site shore load measurement, this research examines the effects of post-tensioning on multilevel formwork load distribution. The research demonstrates that the load distribution process for post-tensioned slabs allows for improvements to current construction practice. These enhancements include a shortening of the construction period; an improvement in the safety of multi-level form work operations; and a reduction in the quantity of form work materials required for a project. These enhancements are achieved through the general improvement in safety offered by post-tensioning during the various formwork operations. The research demonstrates that there is generally a significant improvement in the factors of safety over those for conventionally reinforced slabs. This improvement in the factor of safety occurs at all stages of the multi-level formwork operation. The general improvement in the factors of safety with post-tensioned slabs allows for a shortening of the slab construction cycle time. Further, the low level of load redistribution that occurs during the stripping operations makes post-tensioned slabs ideally suited to reshoring procedures. Provided the overall number of interconnected levels remains unaltered, it is possible to increase the number of reshored levels while reducing the number of undisturbed shoring levels without altering the factors of safety, thereby, reducing the overall quantity of formwork and shoring materials.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Government of Indonesia (GoI) increasingly relies on the private sector financing to build and operate infrastructures through public private partnership (PPP) schemes. However, PPP does not automatically provide the solution for the financing scheme due to value for money (VFM) issues. The procurement authority must show whether a PPP proposal is the optimal solution that provides best VFM outcome. The paper presents a literature review of comparing quantitative VFM methodology for PPP infrastructure project procurement in Indonesia and Australia. Public Sector Comparator (PSC) is used to assess the potential project VFM quantitatively in Australia. In Indonesia, the PSC has not been applied, where the PPP procurement authority tends to utilize a common project evaluation method that ignores the issues of risk. Unlike the conventional price bid evaluation, the PSC enables a financial comparison including costs/gains and risks. Since the construction of PSC is primarily on risk management approach, it can facilitate risk negotiation processes between the involved parties. The study indicates that the quantitative VFM methodology of PSC is potentially applicable in Indonesia for water supply sector. Various supporting regulations are available that emphasize the importance of VFM and risk management in infrastructure investment. However, the study also reveals a number of challenges that need to be anticipated, such as the need of a more comprehensive PPP policy at both central and local government level, a more specific legal instrument for bidding evaluation method and the issue of institutional capacity development in PPP Units at the local level.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Acton Peninsula project alliance is the first project alliance in building construction in the world. The project alliance is set out to achieve the best possible outcome for the project with all participants in the alliance sharing both risks and rewards. The construction of the National Museum of Australia and the Australian Institute of Aboriginal and Torres Strait Islander Studies, on Acton Peninsula in Canberra, will be a significant Australian architectural and construction achievement. The design and construction project team is committed to achieve outstanding results in all aspects of the design, construction and delivery of this significant national project. Innovation and creativity are valued, and outstanding performance will be rewarded.