833 resultados para Probabilistic methodology


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following paper introduces a new approach to the analysis of offensive game in football. Therefore, the main aim of this study was to create an instrument for collecting information for the analysis of offensive action and interactions game. The observation instrument that was used to accomplish the main objective of this work consists of a combination of format fields (FC) and systems of categories (SC). This methodology is a particular strategy of the scientific method that has as an objective to analyse the perceptible behaviour that occurs in habitual contexts, allowing them to be formally recorded and quantified and using an ad hoc instrument in order to obtain a behaviour systematic registration that, since they have been transformed in quantitative data with the necessary reliability and validity determined level, will allow analysis of the relations between these behaviours. The codifications undertaken to date in various games of football have shown that it serves the purposes for which it was developed, allowing more research into the offensive game methods in football.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new model for dealing with decision making under risk by considering subjective and objective information in the same formulation is here presented. The uncertain probabilistic weighted average (UPWA) is also presented. Its main advantage is that it unifies the probability and the weighted average in the same formulation and considering the degree of importance that each case has in the analysis. Moreover, it is able to deal with uncertain environments represented in the form of interval numbers. We study some of its main properties and particular cases. The applicability of the UPWA is also studied and it is seen that it is very broad because all the previous studies that use the probability or the weighted average can be revised with this new approach. Focus is placed on a multi-person decision making problem regarding the selection of strategies by using the theory of expertons.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We describe the version of the GPT planner to be used in the planning competition. This version, called mGPT, solves mdps specified in the ppddllanguage by extracting and using different classes of lower bounds, along with various heuristic-search algorithms. The lower bounds are extracted from deterministic relaxations of the mdp where alternativeprobabilistic effects of an action are mapped into different, independent, deterministic actions. The heuristic-search algorithms, on the other hand, use these lower bounds for focusing the updates and delivering a consistent value function over all states reachable from the initial state with the greedy policy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introducció: Els errors de medicació són definits com qualsevol incident prevenible que pot causar dany al pacient o donar lloc a una utilització inapropiada dels medicaments, quan aquests estan sota el control dels professionals sanitaris o del pacient. Els errors en la preparació i l’administració de medicació són els més comuns de l’àrea hospitalària i, tot i la llarga cadena per la qual passa el fàrmac, el professional d’infermeria és el últim responsable de l’acció, tenint així, un paper molt important en la seguretat del pacient. Les infermeres dediquen el 40% del temps de la seva jornada laboral en tasques relacionades amb la medicació. Objectiu: Determinar si les infermeres produeixen més errors si treballen amb sistemes de distribució de medicació de stock o en sistemes de distribució unidosis de medicació. Metodologia: Estudi quantitatiu, observacional i descriptiu, on la notificació d’errors (o oportunitats d’error) realitzats per la infermera, en les fases de preparació i administració de medicació, es farà mitjançant un qüestionari autoelaborat. Els elements a identificar seran: el tipus d’error, les causes que poden haver--‐lo produït, la seva potencial gravetat i qui l’ha pogut evitar; així com el tipus de professional que l’ha produït. Altres dades rellevants són: el medicament implicat junt amb la dosis i la via d’administració i el sistema de distribució utilitzat. Mostreig i mostra: El mostreig serà no probabilístic i per conveniència. S’escolliran aquelles infermeres que l’investigador consideri amb les característiques necessàries per participar en l’estudi, així que la mostra estarà formada per les infermeres les quals treballen a la unitat 40 de l’Hospital del Mar i utilitzen un sistema de distribució de medicació de dosis unitàries i les infermeres que treballen a urgències (concretament a l’àrea de nivell dos) de l’Hospital del Mar les quals treballen amb un sistema de distribució de medicació de stock.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present prospective study, with a five-year follow-up, presents an extensive psychiatric and educational assessment of an adolescent population (N = 30) in the age range 14-20, suffering from several psychiatric disorders, though apt to follow a normal academic program. The residential settings where the study took place provide both psychiatric and schooling facilities. In this environment, what is the effectiveness of long-term hospitalization? Are there any criteria for predicting results? After discharge, could social adjustments difficulties be prevented? Assessment instruments are described and the results of one preliminary study are presented. The actual data seems to confirm the impact of the special treatment facilities combining schooling and psychiatric settings on the long term outcome of adolescents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Questionnaires were sent to transportation agencies in all 50 states in the U.S., to Puerto Rico, and all provinces in Canada asking about their experiences with uplift problems of - corrugated metal pipe (CMP). Responses were received from 52 agencies who reported 9 failures within the last 5 years. Some agencies also provided design standards for tiedowns to resist uplift. There was a wide variety in restraining forces used; for example for a pipe 6 feet in diameter, the resisting force ranged from 10 kips to 66 kips. These responses verified the earlier conclusion based on responses from Iowa county engineers that a potential uplift danger exists.when end restraint is not provided for CMP and that existing designs have an unclear theoretical or experimental basis. In an effort to develop more rational design standards, the longitudinal stiffness of three CMP ranging from 4 to 8 feet in diameter were measured in the laboratory. Because only three tests were conducted, a theoretical model to evaluate the stiffness of pipes of a variety of gages and corrugation geometries was also developed. The experimental results indicated a "stiffness" EI in the range of 9.11 x 10^5 k-in^2 to 34.43 x 10^5 k-in^2 for the three pipes with the larger diameter pipes having greater stiffness. The theoretical model developed conservatively estimates these stiffnesses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This investigation is the final phase of a three part study whose overall objectives were to determine if a restraining force is required to prevent inlet uplift failures in corrugated metal pipe (CMP) installations, and to develop a procedure for calculating the required force when restraint is required. In the initial phase of the study (HR-306), the extent of the uplift problem in Iowa was determined and the forces acting on a CMP were quantified. In the second phase of the study (HR- 332), laboratory and field tests were conducted. Laboratory tests measured the longitudinal stiffness ofCMP and a full scale field test on a 3.05 m (10 ft) diameter CMP with 0.612 m (2 ft) of cover determined the soil-structure interaction in response to uplift forces. Reported herein are the tasks that were completed in the final phase of the study. In this phase, a buried 2.44 m (8 ft) CMP was tested with and without end-restraint and with various configurations of soil at the inlet end of the pipe. A total of four different soil configurations were tested; in all tests the soil cover was constant at 0.61 m (2 ft). Data from these tests were used to verify the finite element analysis model (FEA) that was developed in this phase of the research. Both experiments and analyses indicate that the primary soil contribution to uplift resistance occurs in the foreslope and that depth of soil cover does not affect the required tiedown force. Using the FEA, design charts were developed with which engineers can determine for a given situation if restraint force is required to prevent an uplift failure. If an engineer determines restraint is needed, the design charts provide the magnitude of the required force. The design charts are applicable to six gages of CMP for four flow conditions and two types of soil.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The research reported in this series of article aimed at (1) automating the search of questioned ink specimens in ink reference collections and (2) at evaluating the strength of ink evidence in a transparent and balanced manner. These aims require that ink samples are analysed in an accurate and reproducible way and that they are compared in an objective and automated way. This latter requirement is due to the large number of comparisons that are necessary in both scenarios. A research programme was designed to (a) develop a standard methodology for analysing ink samples in a reproducible way, (b) comparing automatically and objectively ink samples and (c) evaluate the proposed methodology in forensic contexts. This report focuses on the last of the three stages of the research programme. The calibration and acquisition process and the mathematical comparison algorithms were described in previous papers [C. Neumann, P. Margot, New perspectives in the use of ink evidence in forensic science-Part I: Development of a quality assurance process for forensic ink analysis by HPTLC, Forensic Sci. Int. 185 (2009) 29-37; C. Neumann, P. Margot, New perspectives in the use of ink evidence in forensic science-Part II: Development and testing of mathematical algorithms for the automatic comparison of ink samples analysed by HPTLC, Forensic Sci. Int. 185 (2009) 38-50]. In this paper, the benefits and challenges of the proposed concepts are tested in two forensic contexts: (1) ink identification and (2) ink evidential value assessment. The results show that different algorithms are better suited for different tasks. This research shows that it is possible to build digital ink libraries using the most commonly used ink analytical technique, i.e. high-performance thin layer chromatography, despite its reputation of lacking reproducibility. More importantly, it is possible to assign evidential value to ink evidence in a transparent way using a probabilistic model. It is therefore possible to move away from the traditional subjective approach, which is entirely based on experts' opinion, and which is usually not very informative. While there is room for the improvement, this report demonstrates the significant gains obtained over the traditional subjective approach for the search of ink specimens in ink databases, and the interpretation of their evidential value.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unlike the evaluation of single items of scientific evidence, the formal study and analysis of the jointevaluation of several distinct items of forensic evidence has to date received some punctual, ratherthan systematic, attention. Questions about the (i) relationships among a set of (usually unobservable)propositions and a set of (observable) items of scientific evidence, (ii) the joint probative valueof a collection of distinct items of evidence as well as (iii) the contribution of each individual itemwithin a given group of pieces of evidence still represent fundamental areas of research. To somedegree, this is remarkable since both, forensic science theory and practice, yet many daily inferencetasks, require the consideration of multiple items if not masses of evidence. A recurrent and particularcomplication that arises in such settings is that the application of probability theory, i.e. the referencemethod for reasoning under uncertainty, becomes increasingly demanding. The present paper takesthis as a starting point and discusses graphical probability models, i.e. Bayesian networks, as frameworkwithin which the joint evaluation of scientific evidence can be approached in some viable way.Based on a review of existing main contributions in this area, the article here aims at presentinginstances of real case studies from the author's institution in order to point out the usefulness andcapacities of Bayesian networks for the probabilistic assessment of the probative value of multipleand interrelated items of evidence. A main emphasis is placed on underlying general patterns of inference,their representation as well as their graphical probabilistic analysis. Attention is also drawnto inferential interactions, such as redundancy, synergy and directional change. These distinguish thejoint evaluation of evidence from assessments of isolated items of evidence. Together, these topicspresent aspects of interest to both, domain experts and recipients of expert information, because theyhave bearing on how multiple items of evidence are meaningfully and appropriately set into context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter describes the profile of the HIA, provides insight into the process and gives an example of how political decisions may be made on behalf of a concerned population through an HIA approach. [Introduction p. 284]

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration mandates that states collect traffic count information at specified intervals to meet the needs of the Highway Performance Monitoring System (HPMS). A manual land use change detection method was employed to determine the effects of land use change on traffic for Black Hawk County, Iowa, from 1994 to 2002. Results from land use change detection could enable redirecting traffic count activities and related data management resources to areas that are experiencing the greatest changes in land use and related traffic volume. Including a manual land use change detection process in the Iowa Department of Transportation’s traffic count program has the potential to improve efficiency by focusing monitoring activities in areas more likely to experience significant increase in traffic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Center for Transportation Research and Education (CTRE) issued a report in July 2003, based on a sample study of the application of remote sensed image land use change detection to the methodology of traffic monitoring in Blackhawk County, Iowa. In summary, the results indicated a strong correlation and a statistically significant regression coefficient between the identification of built-up land use change areas from remote sensed data and corresponding changes in traffic patterns, expressed as vehicle miles traveled (VMT). Based on these results, the Iowa Department of Transportation (Iowa DOT) requested that CTRE expand the study area to five counties in the southwest quadrant of the state. These counties are scheduled for traffic counts in 2004, and the Iowa DOT desired the data to 1) evaluate the current methodology used to place the devices; 2) potentially influence the placement of traffic counting devices in areas of high built-up land use change; and 3) determine if opportunities exist to reduce the frequency and/or density of monitoring activity in lower trafficked rural areas of the state. This project is focused on the practical application of built-up land use change data for placement of traffic count data recording devices in five southwest Iowa counties.