973 resultados para Grant funded projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on the outcomes of an ICT enabled social sustainability project “Green Lanka1” trialled in the Wilgamuwa village, which is situated in the Dambulla district of Sri Lanka. The main goals of the project were focused towards the provision of information about market prices, transportation options, agricultural decision support and modern agriculture practices of the farmer communities to improve their livelihood with the effective use of technologies. The project used Web and Mobile (SMS) enabled systems. The Green Lanka project was sponsored by the Information Communication Technology Agency (ICTA) of Sri Lanka under the Institutional Capacity Building Programme (ICBP) grant scheme which was sponsored by the World Bank. Six hundred families in Wilgamuwa village participated in the project activities. The project was designed, executed and studied through an Action Research approach. The lessons learned through the project activities provide an important understanding of the complex interaction between different stakeholders in the process of implementation of ICT enabled solutions within digitally divided societies. The paper analyses the processes used to reduce the resistance to change and improved involvement of farmer communities in ICT enabled projects. It also analyses the interaction between stakeholders involved in design and implementation of the project activities to improve the chances of project success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The DEHub Virtual Worlds Working Group has an informal membership of nearly 200 members with an interest in education and virtual worlds within the Australian and New Zealand context. Members come from a variety of academic disciplines and may be teaching or research academics, Research Higher Degree candidates, project managers, virtual world builders and developers. The group acts as an informal Community of Practice, facilitating learning and the transfer of skills through social contact, opportunities to collaborate on projects and publications, and through the sharing of knowledge and experience. This poster provides a snapshot of the activity of this highly active group.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

THE UVI working group acknowledges the contribution of Vitamin D to bone health as stated in our paper. However, we concluded that an optimal level of Vitamin D for humans has not yet been established with any certainty...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this presentation, renowned arts practitioner, Sean Mee, and Nigel Lavender, Executive Director of the Queensland Music Festival, talk about how community arts practice can be used to build cultural captial in communities, using examples such large-scale musicals such as The Road We're ON (Charleville) and Behind the Cand (Bowen), Mee and Lavender highlight the importance of community-driven narrative and particiaption.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Post–disaster reconstruction projects are often considered ineffectual or unproductive because on many occasions in the past they have performed extremely poorly during post-contract occupation, or have failed altogether to deliver acceptable outcomes. In some cases, these projects have already failed even before their completion, leading many sponsor aid organisations to hold these projects up as examples of how not to deliver housing reconstruction. Research into some previous unsuccessful projects has revealed that often the lack of adequate knowledge regarding the context and complexity involved in the implementation of these projects is generally responsible for their failure. Post-disaster reconstruction projects are certainly very complex in nature, often very context-specific and they can vary widely in magnitude. Despite such complexity, reconstruction projects can still have a high likelihood of success if adequate consideration is given to the importance of factors which are known to positively influence reconstruction efforts. Good outcomes can be achieved when planners and practitioners ensure best practices are embedded in the design of reconstruction projects at the time reconstruction projects they are first instigated. This paper outlines and discusses factors that significantly contribute to the successful delivery of post-disaster housing reconstruction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the construction industry, contractors have to improve the efficiency of markup decision-making to survive from fierce business competition. The effect of client type on markup decision has been aware in previous studies and contractors are advocated to take account of decision factors properly when they are confronted with different types of projects. Nevertheless, the rationales behind the inclusion of different factors in markup decision-making for different projects sustain unknown. In this study, fifty-three factors were identified after extensive literature review and interviews with professionals. The identified factors were afterwards grouped under the headings of nine attributes and compiled in a questionnaire for survey in China. Using the Hotelling’s T-square test, it is found that three attributes (i.e., project characteristic, client characteristic, and macro condition) can explain the effect of client type on contractors’ markup decision. The research findings provide useful insights into the cognition of bid pricing as well as the improvement of bidding efficiency. While the research works were situated in China, contractors in other countries could benefit from the research findings in a similar vein.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) delivery system is an effective means of delivering a green construction project and selecting an appropriate contractor is critical to project success. Moreover, the delivery of green buildings requires specific design, construction and operation and maintenance considerations not generally encountered in the procurement of conventional buildings. Specifying clear sustainability requirements to potential contractors is particularly important in achieving sustainable project goals. However, many client/owners either do not explicitly specify sustainability requirements or do so in a prescriptive manner during the project procurement process. This paper investigates the current state-of-the-art procurement process used in specifying the sustainability requirements of the public sector in the USA construction market by means of a robust content analysis of 40 design-build requests for proposals (RFPs). The results of the content analysis indicate that the sustainability requirement is one of the most important dimensions in the best-value evaluation of DB contractors. Client/owners predominantly specify the LEED certification levels (e.g. LEED Certified, Silver, Gold, and Platinum) for a particular facility, and include the sustainability requirements as selection criteria (with specific importance weightings) for contractor evolution. Additionally, larger size projects tend to allocate higher importance weightings to sustainability requirements.This study provides public DB client/owners with a number of practical implications for selecting appropriate design-builders for sustainable DB projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

New Australian research has found scientists spent the equivalent of 550 working years applying for grants from the country's largest health and medical research grants scheme in 2012, and that around 75% of this time was spent on unsuccessful applications. The Queensland University of Technology (QUT) study also found that spending more time on a funding proposal did not equate to a greater chance of success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Human computer interaction and interaction design have recognised the need for participatory methods of co-design to contribute to designing human-centred interfaces, systems and services. Design thinking has recently developed as a set of strategies for human-centred co-design in product innovation, management and organisational transformation. Both developments place the designer in a new mediator role, requiring new skills than previously evident. This paper presents preliminary findings from a PhD case study of strategy and innovation consultancy Second Road to discuss these emerging roles of design lead, facilitator, teacher and director in action.