783 resultados para Construction Industry Development
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
The construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole Life Cycle Costing (WLCC) is a relatively new concept for the construction industry especially on residential development and particularly for Malaysia. Discussing the speculation in using WLCC for the Malaysian residential constructions is the aim for this paper and it is one of the research questions on my research. This paper also wants to gather more speculation that may involve through others experienced. Basically, this paper is written to facilitate the current or future individual which will involve in residential property development sector with a new sensible approach to what at times seems impressively confusing especially in simplifying the operations and maintenance services and rehabilitation as well.
Resumo:
Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.
Resumo:
As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.
Resumo:
This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme
Resumo:
The internationalization of construction companies has become of significant interest as the global construction market continues to be integrated into a more competitive and turbulent business environment. However, due to the complicated and multifaceted nature of international business and performance, there is as yet no consensus on how to evaluate the performance of international construction firms (ICFs). The purpose of this paper, therefore, is to develop a practical framework for measuring the performance of ICFs. Based on the balanced scorecard (BSC), a framework with detailed measures is developed, investigated, and tested using a three-step research design. In the first step, 27 measures under six dimensions (financial, market, customer, internal business processes, stakeholders, and learning and growth) are determined by literature review, interviews with academics, and seminar discussions. Subsequently, a questionnaire survey is conducted to investigate weights of these 27 performance measures. The questionnaire survey also supports the importance of measuring intangible aspects of international construction performance from the practitioner’s viewpoint. Additionally, a case study is described to test the framework’s robustness and usefulness. This is achieved by benchmarking the performance of a Chinese ICF with nine other counterparts worldwide. It is found that the framework provides an effective basis for benchmarking ICFs to effectively monitor their performance and support the development of strategies for improved competitiveness in the international arena. This paper is the first attempt to present a balanced and practically tested framework for evaluating the performance of ICFs. It contributes to the practice of performance measurement and related internationalization in the construction industry in general.
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
Global climate change is one of the most significant environmental issues that can harm human development. One central issue for the building and construction industry to address global climate change is the development of a credible and meaningful way to measure greenhouse gas (GHG) emissions. While Publicly Available Specification (PAS) 2050, the first international GHG standard, has been proven to be successful in standardizing the quantification process, its contribution to the management of carbon labels for construction materials is limited. With the recent publication of ISO 14067: Greenhouse gases – carbon footprint of products – requirements and guidelines for quantification and communication in May 2013, it is necessary for the building and construction industry to understand the past, present and future of the carbon labelling practices for construction materials. A systematic review shows that international GHG standards have been evolving in terms of providing additional guidance on communication and comparison, as well as less flexibility on the use of carbon labels. At the same time, carbon labelling schemes have been evolving on standardization and benchmarking. In addition, future actions are needed in the aspect of raising consumer awareness, providing benchmarking, ensuring standardization and developing simulation technologies in order for carbon labelling schemes for construction materials to provide credible, accurate and transparent information on GHG emissions.
Resumo:
Purpose To examine the implementation of quality management systems (QMSs) of Grade 7 (G-7) Indonesian construction companies. This includes the initial motives that have driven the development of QMSs, barriers to effective QMS implementation, the current practice and integration of QMS-ISO 9001 principles and elements, and the performance of contractors implementing such QMSs. Design/methodology/approach A survey was conducted involving 403 respondents (Quality Management Representatives, Managers, and Project and Site Engineers) from 77 G-7 as well as ISO 9001 certified Indonesian construction companies. Findings The main motive for G-7 contractors in establishing and implementing ISO 9001 based QMSs are identified as being to effectively and efficiently control project activities. Respondents apparently do not often experience problems related to QMS implementation. However, issues of management attitude and purpose are identified as barriers that may affect effective QMS implementation. The study highlights the ISO 9001 principles and elements that still require to be more critically applied by G-7 contractors in order to fully implement and improve their current QMS effectiveness. The findings also suggest that, although certified, many G-7 contractors have not yet achieved a satisfactory level of performance to be truly competitive in global markets outside Indonesia. Originality/value To date, only limited research has been conducted into the application of ISO 9001 in the Indonesian construction industry. The research findings reinforced the value of pursuing more effective QMS implementation. They also support current attempts to introduce ISO 9001 QMSs to a much wider base of Indonesian construction companies, particularly small and medium sized contractors and builders.
Resumo:
The current state of the prefabricated housing market in Australia is systematically profiled, guided by a theoretical systems model. Particular focus is given to two original data collections. The first identifies manufacturers and builders using prefabrication innovations, and the second compares the context for prefabricated housing in Australia with that of key international jurisdictions. The results indicate a small but growing market for prefabricated housing in Australia, often building upon expertise developed through non-residential building applications. The international comparison highlighted the complexity of the interactions between macro policy decisions and historical influences and the uptake of prefabricated housing. The data suggest factors such as the small scale of the Australian market, and a lack of investment in research, development and training have not encouraged prefabrication. A lack of clear regulatory policy surrounding prefabricated housing is common both in Australia and internationally, with local effects in regards to home warranties and housing finance highlighted. Future research should target the continuing lack of consideration of prefabrication from within the housing construction industry, and build upon the research reported in this paper to further quantify the potential end user market and the continuing development of the industry.
Resumo:
Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.
Resumo:
Observing the working procedure of construction workers is an effective means of maintaining the safety performance of a construction project. It is also difficult to achieve due to a high worker-to-safety-officer ratio. There is an imminent need for the development of a tool to assist in the real-time monitoring of workers, in order to reduce the number of construction accidents. The development and application of a real time locating system (RTLS) based on the Chirp Spread Spectrum (CSS) technique is described in this paper for tracking the real-time position of workers on construction sites. Experiments and tests were carried out both on- and off-site to verify the accuracy of static and dynamic targets by the system, indicating an average error of within one metre. Experiments were also carried out to verify the ability of the system to identify workers’ unsafe behaviours. Wireless data transfer was used to simplify the deployment of the system. The system was deployed in a public residential construction project and proved to be quick and simple to use. The cost of the developed system is also reported to be reasonable (around 1800USD) in this study and is much cheaper than the cost of other RTLS. In addition, the CCS technique is shown to provide an economical solution with reasonable accuracy compared with other positioning systems, such as ultra wideband. The study verifies the potential of the CCS technique to provide an effective and economical aid in the improvement of safety management in the construction industry.
Resumo:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.