851 resultados para Building construction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2002 in the Ivory Coast three months of armed conflict ended with the division of the country. Two regions were separated by an interposition line controlled by the French Forces Licorne. This significant peace process was maintained over time, but characterized for lack of mutual confidence and political immobility, which led to an impasse and the continuation of Laurent Gbagbo in the presidency. Moreover, the peace building process was less successful because the different political agreements failed to address some of the main national problems, such as land property and identity issues. The following paper aims first to analyze the main facts and causes that instigated the conflict since the coup d’état in 2002. Secondly, the paper will analyze the peace process and point out the key elements of the Ouagadougou Peace Agreement (2007): the creation of a new and unique armed forces structure, as well as the identification of the population and implementation of an electoral process. The main goal is to provide the International Catalan Institute for Peace (ICIP) a working tool in order to send an electoral observation mission to this African country by November 2009.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Introduction: Exposure to environmental tobacco smoke (ETS) is a major environmental risk factor. Indoor contaminants come from a variety of sources, which can include inadequate ventilation, volatile organic compounds (VOCs), biological agents, combustion products, and ETS. Because ETS is one of the most frequent causes of IAQ complaints as well as the high mortality of passive smoking, in June 2004 the University of Geneva made the decision to ban smoking inside the so called "Uni-Mail" building, the biggest Swiss University human science building of recent construction, and the ordinance was applied beginning in October 2004. This report presents the finding related to the IAQ of the "Uni-Mail" building before and after smoking bans using nicotine, suspended dust, condensate and PAHs level in air as tracers to perform an assessment of passive tobacco exposure for non-smokers inside the building. Methods: Respirable particles (RSP) A real time aerosol monitor (model DataRAM)was place at sampling post 1, level ground floor. Condensate It consists in extracting any organic matter taken on the glass fibre filters by MeOH, and then measuring the total absorbent of the MeOH extract to the UV wavelength of 447 nm. Nicotine Nicotine was taken by means of cartridges containing of XAD-4 to the fixed flow of 0.5 L/min. The analytical method used for the determination of nicotine is based on gas chromatography with Nitrogen selective detector GC-NPD. Results: Figure 1 shows the box plot density display of 3 parameters before and after smoking bans for all 7 sampling posts: dust, condensate and nicotine in air in μg/m3. Conclusion: Before the smoking ban, the level of the concentrations of respirable particles (RSP) is raised more, average of the day 320 μg/m3, with peaks of more than 1000 μg/m3, compared with the values of the surrounding air between 22 and 30 μg/m3. The nicotine level is definitely more important (average 5.53 μg/m3, field 1.5 to 17.9 μg/m3). Once the smoking bans inside the building were applied, one notes a clear improvement in terms of concentrations of pollutants. For dust, the concentration fell by 3 times (average: 130 μg/m3, range: 40 to 160 μg/m3) and that of nicotine by 10 times (average: 0.53 μg/m3, range: 0 to 1.69 μg/m3) compared to that found before smoking bans. The outdoor air RSP concentration was 22 μg/m3 or 10 times lower. Nicotine seems to be the best tracer for ETS free of interference, independent of location or season.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Excessive exposure to solar UV light is the main cause of skin cancers in humans. UV exposure depends on environmental as well as individual factors related to activity. Although outdoor occupational activities contribute significantly to the individual dose received, data on effective exposure are scarce and limited to a few occupations. A study was undertaken in order to assess effective short-term exposure among building workers and characterize the influence of individual and local factors on exposure. The effective exposure of construction workers in a mountainous area in the southern part of Switzerland was investigated through short-term dosimetry (97 dosimeters). Three altitudes, of about 500, 1500 and 2500 m were considered. Individual measurements over 20 working periods were performed using Spore film dosimeters on five body locations. The postural activity of workers was concomitantly recorded and static UV measurements were also performed. Effective exposure among building workers was high and exceeded occupational recommendations, for all individuals for at least one body location. The mean daily UV dose in plain was 11.9 SED (0.0-31.3 SED), in middle mountain 21.4 SED (6.6-46.8 SED) and in high mountain 28.6 SED (0.0-91.1 SED). Measured doses between workers and anatomical locations exhibited a high variability, stressing the role of local exposure conditions and individual factors. Short-term effective exposure ranged between 0 and 200% of ambient irradiation, indicating the occurrence of intense, subacute exposures. A predictive irradiation model was developed to investigate the role of individual factors. Posture and orientation were found to account for at least 38% of the total variance of relative individual exposure, and were also found to account more than altitude on the total variance of effective daily exposures. Targeted sensitization actions through professional information channels and specific prevention messages are recommended. Altitude outdoor workers should also benefit from preventive medical examination.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A quarterly report from the Iowa Department of Transportation regarding building project status.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A quarterly report from the Iowa Department of Transportation regarding the Motor Vehicle Division building project status.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A quarterly report from the Iowa Department of Transportation regarding building project status.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A quarterly report from the Iowa Department of Transportation regarding building project status.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: This research presents the construction of an attributional questionnaire concerning the different parental models and factors that are involved in family interactions. Method: A mixed methodology was used as a foundation to develop items and respective pilots that allowed checking the validity and internal consistency of the instrument using expert judgment. Results: An instrument of 36 statements was organized into 12 categories to explore the parental models according to the following factors: parental models, breeding patterns, attachment bonds and guidelines for success, and promoted inside family contexts. Analyzing these factors contributes to the children’s development within the familiar frown, and the opportunity for socio-educational intervention. Conclusion: It is assumed that the family context is as decisive as the school context; therefore, exploring the nature of parental models is required to understand the features and influences that contribute to the development of young people in any social context.





Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction codes establish minimum standards for structural integrity, life safety, accessibility and energy conservation in construction of buildings and facilities intended for human occupancy. These requirements affect all of the major systems of buildings and facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In today's era of advanced methods, it is interesting that a centuries-old Roman road-building concept can be the most attractive alternative available. The need for a less expensive road base construction method is very apparent, especially to the county engineer faced with maintaining quality lower traffic volume farm-to-market roads. The revival of the Macadam stone base is one possible solution. Des Moines County believed a Macadam road had excellent possibilities for their particular needs. They proposed a research project designed to eliminate some of the unknown factors of Macadam stone base construction. It is the intent of this research project to develop standardized design procedures and serve as an aid for others in constructing a Macadam base roadway. The Iowa Department of Transportation has published special provisions for the construction of Macadam stone bases that were adopted as the guideline specifications for the research project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The main goal of this paper is to obtain a granular material formulated with Municipal Solid Waste Incinerarion (MSWI) bottom ash (BA) and air pollution control (APC) ash to be used as secondary building material. Previously, an optimum concrete mixture using both MSWI residues as aggregates was formulated. A compromise between the environmental behaviour and the economy of the process was considered. Unconfined compressive strength and abrasion resistance values were measured in order to evaluate the mechanical properties. From these results, the granular mixture was not suited for certain applications owing to the high BA/APC content and low cement percentages used to reduce the costs of the final product. Nevertheless, the leaching test performed showed that the concentrations of all heavy metals were below the limits established by the current Catalan legislation for their reutilization. Therefore, the material studied might be mainly used in embankments, where high mechanical properties are not needed and environmental safety is assured.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work analyses the political news of eight Spanish television channels in order to see what image is built of politics, and particularly how the news of corruption affects the image of politics in Spanish news broadcasts. Different cases of corruption such as Gürtel, Palma Arena and those associated with judge Baltasar Garzón in his final stage in office, occupy part of the study. A new methodology is therefore proposed that enables the quality of the political information emitted from inside and outside the political content of the news programmes to be observed. Particular attention is paid to the news broadcasts of Televisión Española and Cuatro as those which offer a more balanced view of politics, and channels such as La Sexta, which give priority to a narrative construction of politics in the news programmes around causes of corruption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper aims to explore asynchronous communication in computer supported collaborative learning (CSCL). Thirty virtual forums are analysed in both a quantitative and a qualitative way. Quantitatively, the number of messages written, message threads and original and answer messages are counted. Qualitatively, the content of the notes is analysed, cataloguing these into two different levels: on the one hand, as a set of knowledge building process categories, and on the other hand, following the scaffolds that Knowledge Forum offers. The results show that both an exchange of information and a collaborative work take place. Nevertheless, the construction of knowledge is superficial.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This final project was made for the Broadband department of TeliaSonera. This project gives an overview on how internet service provider might build an access network so that they can offer triple-play services. It also gives information on what equipment is needed and what is required from the access, aggregation and edge networks. The project starts by describing the triple-play service. Then it moves on to optical fiber cables, the network technology and network architecture. At the end of the project there is an example of the process and construction of the access network. It will give an overview of the total process and problems that a network planner might face during the planning phase of the project. It will give some indication on how one area is built from the start to finish. The conclusion of the project presents some points that must be taken into consideration when building an access network. The building of an access network has to be divided to a time span of eight to ten years, where one year is one phase in the project. One phase is divided into three parts; Selecting the areas and targets, Planning the areas and targets, and Documentation. The example area gives indication on the planning of an area. It is almost impossible to connect all targets at the same time. This means that the service provider has to complete the construction in two or three parts. The area is considered to be complete when more than 80% of the real estates have fiber.