759 resultados para Australian construction industry


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is susceptible to extreme weather events (EWEs) due to most of its activities being conducted by manual workers outdoors. Although research has been conducted on the effects of EWEs, such as flooding and snowfall, limited research has been conducted on the effects of heatwaves and hot weather conditions. Heatwaves present a somewhat different risk profile to construction, unlike EWEs such as flooding and heavy snowfall that present physical obstacles to work onsite. However, heatwaves have affected the construction industry in the UK, and construction claims have been made due to adverse weather conditions. With heatwaves being expected to occur more frequently in the coming years, the construction industry may suffer unlike any other industry during the summer months. This creates the need to investigate methods that would allow construction activities to progress during hot summer months with minimal effect on construction projects. Hence, the purpose of this paper. Regions such as the Middle East and the UAE in particular flourish with mega projects, although temperatures soar to above 40̊C in the summer months. Lessons could be learnt from such countries and adapted in the UK. Interviews have been conducted with a lead representative of a client, a consultant and a contractor, all of which currently operate on UAE projects. The key findings include one of the preliminary steps taken by international construction companies operating in the UAE. This involves restructuring their entire regional team by employing management staff from countries such as Lebanon, Palestine, Iraq, and their labour force from the sub-continent such as India and Pakistan. This is not only due to the cheap wage rate but also to the ability to cope and work in such extreme hot weather conditions. The experience of individuals working in the region allows for future planning, where the difference in labour productivity during the extreme hot weather conditions is known, allowing precautionary measures to be put in place.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper the behavior of economic actors shown in the uncertain quality goods markets is examined from the perspective of the sociology of markets. The analysis uses the findings of in-depth interviews conducted in 2011 and 2012 respectively amongst small and medium size entrepreneurs working in construction industry. In the Hungarian construction industry neither formal rules, nor vocational chambers, are able to create a safe environment for entrepreneurs. Nevertheless, networks created as a result of micro-selection steps might be able to enforce the quality of services, observe deadlines and what is more, ensure payment discipline. In this market, the typical high risk can be reduced by relationships. Networks reduce also the cost of transactions, since the important part of the services in this field could only be standardized at significant costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the U.S., construction accidents remain a significant economic and social problem. Despite recent improvement, the Construction industry, generally, has lagged behind other industries in implementing safety as a total management process for achieving zero accidents and developing a high-performance safety culture. One aspect of this total approach to safety that has frustrated the construction industry the most has been “measurement”, which involves identifying and quantifying the factors that critically influence safe work behaviors. The basic problem attributed is the difficulty in assessing what to measure and how to measure it—particularly the intangible aspects of safety. Without measurement, the notion of continuous improvement is hard to follow. This research was undertaken to develop a strategic framework for the measurement and continuous improvement of total safety in order to achieve and sustain the goal of zero accidents, while improving the quality, productivity and the competitiveness of the construction industry as it moves forward. The research based itself on an integral model of total safety that allowed decomposition of safety into interior and exterior characteristics using a multiattribute analysis technique. Statistical relationships between total safety dimensions and safety performance (measured by safe work behavior) were revealed through a series of latent variables (factors) that describe the total safety environment of a construction organization. A structural equation model (SEM) was estimated for the latent variables to quantify relationships among them and between these total safety determinants and safety performance of a construction organization. The developed SEM constituted a strategic framework for identifying, measuring, and continuously improving safety as a total concern for achieving and sustaining the goal of zero accidents.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK construction industry is notorious for the sheer amount of disputes which are likely to arise on each building and engineering project. Despite numerous creative attempts at “dispute avoidance” and “dispute resolution”, this industry is still plagued with these costly disputes. Whilst both academic literature and professional practices have investigated the causes of disputes and the mechanisms for avoidance/resolution of these disputes, neither has studied in any detail the nature of the construction disputes and why they develop as they do once a construction lawyer is engaged. Accordingly, this research explores the question of what influences the outcome of a construction dispute and to what extent do construction lawyers control or direct this outcome? The research approach was ethnographic. Fieldwork took place at a leading construction law firm in London over 18 months. The primary focus was participant observation in all of the firm’s activities. In addition, a database was compiled from the firm’s files and archives, thus providing information for quantitative analysis. The basis of the theoretical framework, and indeed the research method, was the Actor‐Network Theory (ANT). As such, this research viewed a dispute as a set of associations – an entity which takes form and acquires its attributes as a result of its relations with other entities. This viewpoint is aligned with relational contract theories, which in turn provides a unified platform for exploring the disputes. The research investigated the entities and events which appeared to influence the dispute’s identity, shape and outcome. With regard to a dispute’s trajectory, the research took as its starting point that a dispute follows the transformation of “naming, blaming, claiming…”, as identified by Felstiner, Abel and Sarat in 1980. The research found that construction disputes generally materialise and develop prior to any one of the parties approaching a lawyer. Once the lawyer is engaged, we see the reverse of the trajectory “naming, blaming, claiming…” this being: “claiming, blaming, naming…” The lawyers’ role is to identify or name (or rename) the dispute in the best possible light for their client in order to achieve the desired outcome – the development of which is akin to the design process. The transformation of a dispute and the reverse trajectory is by no means linear, but rather, iterative and spatial as it requires alliances, dependencies and contingencies to assemble and take the shape it does. The research concludes that construction disputes are rarely ever completely “resolved” as such. Whilst an independent third party may hand down a judgment, or the parties may reach a settlement agreement, this state is only temporal. Some construction disputes dissipate whist others reach a state of hibernation for a period of time only to pick up momentum and energy some years later. Accordingly, this research suggests that the concept of “dispute resolution” does not exist in the UK construction industry. The ultimate goal should be for parties to reach this ultimate and perpetual state of equilibrium as quickly and as cost effectively as possible: “dispute dissolution”, the slowing down of the dispute’s momentum. Rather than focusing on the design and assemblage of the dispute, the lawyers’ role therein is, or should be, to assist with the “disassembling” of the dispute.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A key driver of Australian sweetpotato productivity improvements and consumer demand has been industry adoption of disease-free planting material systems. On a farm isolated from main Australian sweetpotato areas, virus-free germplasm is annually multiplied, with subsequent 'pathogen-tested' (PT) sweetpotato roots shipped to commercial Australian sweetpotato growers. They in turn plant their PT roots into specially designated plant beds, commencing in late winter. From these beds, they cut sprouts as the basis for their commercial fields. Along with other intense agronomic practices, this system enables Australian producers to achieve worldRSQUOs highest commercial yields (per hectare) of premium sweetpotatoes. Their industry organisation, ASPG (Australian Sweetpotato Growers Inc.), has identified productivity of mother plant beds as a key driver of crop performance. Growers and scientists are currently collaborating to investigate issues such as catastrophic plant beds losses; optimisation of irrigation and nutrient addition; rapidity and uniformity of initial plant bed harvests; optimal plant bed harvest techniques; virus re-infection of plant beds; and practical longevity of plant beds. A survey of 50 sweetpotato growers in Queensland and New South Wales identified a substantial diversity in current plant bed systems, apparently influenced by growing district, scale of operation, time of planting, and machinery/labour availability. Growers identified key areas for plant bed research as: optimising the size and grading specifications of PT roots supplied for the plant beds; change in sprout density, vigour and performance through sequential cuttings of the plant bed; optimal height above ground level to cut sprouts to maximise commercial crop and plant bed performance; and use of structures and soil amendments in plant bed systems. Our ongoing multi-disciplinary research program integrates detailed agronomic experiments, grower adaptive learning sites, product quality and consumer research, to enhance industry capacity for inspired innovation and commercial, sustainable practice change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Changes in the circumstances of the Australian pineapple industry left growers with a leadership vacuum, limited technical support and no funds for conducting research and marketing. Inspirational leadership training together with regular district farm meetings were used to assist the Australian pineapple industry to successfully adapt to these challenges. All growers were assigned to one of a number of regional grower study groups and regular on-farm meetings commenced to facilitate communication between growers, transfer of technology, awareness of industry affairs and an opportunity to become involved in industry business. A leader was appointed within each study group and these leaders attended a leadership course consisting of three, three-day modules. These original course graduates formed the nucleus of a new grower representative group which subsequently instigated levies to fund research and marketing. Two more courses have since been conducted to provide the depth of leadership to satisfy the growers' desire to rotate industry leadership on a regular basis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

'Abnormal vertical growth' (AVG) was recognised in Australia as a dysfunction of macadamia (Macadamia spp.) in the mid-1990s. Affected trees displayed unusually erect branching, and poor flowering and yield. Since 2002, the commercial significance of AVG, its cause, and strategies to alleviate its affects, has been studied. The cause is still unknown, and AVG remains a serious threat to orchard viability. AVG affects both commercial and urban macadamia. It occurs predominantly in the warmer-drier production regions of Queensland and New South Wales. An estimated 100,000 orchard trees are affected, equating to an annual loss of $ 10.5 M. In orchards, AVG occurs as aggregations of affected trees, affected tree number can increase by 4.5% per year, and yield reduction can exceed 30%. The more upright cultivars 'HAES 344' and '741' are highly susceptible, while the more spreading cultivars 'A4', 'A16' and 'A268' show tolerance. Incidence is higher (p<0.05) in soils of high permeability and good drainage. No soil chemical anomaly has been found. Fine root dry weight of AVG trees (0-15 cm depth) was found lower (p<0.05) than non-AVG. Next generation sequencing has led to the discovery of a new Bacillus sp. and a bipartite Geminivirus, which may have a role in the disease. Trunk cinctures will increase (p<0.05) yield of moderately affected trees. Further research is needed to clarify whether a pathogen is the cause, the role of soil moisture in AVG, and develop a varietal solution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Collaboration is acknowledged as a key to continued growth in the Australian construction industry. Government, as a major industry client, has an important role to play with respect to fostering collaboration and ensuring the global competitiveness of the industry. The paper draws upon data collected for the Construction 2020 study and aims to demonstrate that government can a) help to break down the adversarial situation that currently exists between clients, project managers and subcontractors; and b) allow the supply chain to collaborate more effectively in terms of satisfying the relational and financial needs of all parties. Government can also provide a clear set of guidelines (backed up by a functional dispute resolution system) that will promote confidence with respect to forging relationships. Thus, the paper will discuss the way in which public policy can be more closely aligned with actual industry needs in order to promote greater collaboration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the project “Value Alignment Process for Project Delivery” is to provide a catalyst and tools for reform in the building and construction industry to transform business-as-usual performance into exceptional performance. The outcomes of this project will be beneficial to not only the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. The research project consists of a study into best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best approach for a specific project. These resources will be focused on promoting the principles that underlie best practice project delivery, rather than on identifying a particular delivery system. The need for such tools and resources becomes more and more acute as the environment within which the construction industry operates becomes more and more complex, and as business and political imperatives shift to encompass or represent diverse stakeholder interests. To this end, this literature review looks at why it is essential to achieve transformation in the Australian construction industry in the context of its importance to the Australian economy. It seeks to investigate the concepts of ‘alignment’ and value’ as they pertain to construction industry processes and relationships. It comprehensively reviews drivers of project excellence and best practice project delivery principles and looks at how clients approach selection of project delivery systems. It critiques existing project delivery strategies and gives an overview of recent best practice initiatives. The literature review represents a milestone against the Project Agreement and forms a foundation document for this research project

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Off-site Manufacture (OSM) has long been recognised, both in Australia and internationally, as offering numerous benefits to all parties in the construction process. More importantly, it is recognised as a key vehicle for driving improvement within the construction industry. The uptake of OSM in construction is however limited, despite well documented benefits. The research aims to determine the ‘state-of-the-art’ of OSM in Australia. It confirms the benefits and identifies the real and perceived barriers to the widespread adoption of OSM. Further the project identifies opportunities for future investment and research. Although numerous reports have been produced in the UK on the state of OSM adoption within that region, no prominent studies exist for the Australian context. This scoping study is an essential component upon which to build any initiatives that can take advantage of the benefits of OSM in construction. The Construction 2020 report predicted that OSM is set to increase in use over the next 5-15 years, further justifying the need for such a study. The long-term goal of this study is to contribute to the improvement of the Australian construction industry through a realisation of the potential benefits of OSM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This document reports on an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in NSW, Vic and Qld, covering main contractors, trade contractors, consultants, suppliers and clients. One-third of this population was sampled and a response rate of 30% was achieved. The survey investigates innovation determinants in the industry, comprising various aspects of business strategy and business environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report summarises the fi ndings of an innovation survey of the Australian construction industry undertaken by the BRITE Project of the CRC for Construction Innovation in 2004. The BRITE Innovation Survey can be viewed in full at www.brite.crcci.info.The objective of the BRITE project is to improve the incidence and quality of innovation in the Australian construction industry. Many stakeholders in the industry are sceptical about the potential for innovation and its likely benefi ts. Many also lack the linkages and capabilities required for successful innovation. The BRITE Project is redressing this situation through demonstration and benchmarking activities. The term ‘innovation’ is defi ned as a new or signifi cantly improved technology or advanced business practice. Innovation may be technological or organisational, and it may be new to the world, or just new to the industry or business concerned. The defi nition includes the adoption of existing advancements developed outside a particular business. The survey sample was drawn from 3,500 businesses in the road/bridge and commercial building sectors in New South Wales, Victoria and Queensland, covering main contractors, trade contractors, consultants, suppliers and clients. Onethird of this population was sampled and a response rate of almost 30% was achieved. The survey collected information about respondents’ perceptions of innovation determinants in the industry, comprising various aspects of business strategy and business environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines knowledge management and innovation in the Australian Construction Industry. A conceptual model is presented, based upon analysis of the literature and a series of preliminary construction industry interviews. Extensive knowledge management (KM) research has focused upon types of knowledge contained within specific organizational settings. However, we argue that a crucial missing link in KM research concerns the interface between flows of knowledge from external sources of innovations and its channelization in and out, and between organizations. This interface, regulating and facilitating knowledge from external sources of innovation into the organisation, operates under the influence of two main forces visualized as “pulling” and “pushing” forces in the model presented in this paper. The premise of the model lies in a hypothesis that as an organization changes itself into a more mature, learning organization (LO) over time, knowledge flows into it through “pull” rather than “push” forces. We conclude that a successful knowledge management initiative installs a learning and knowledge sharing culture, which is easily adaptable to new learning offering little resistance to new knowledge that flows into the organisation. The model bridges the gap between research and its application in construction practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A ‘scoping study' has recently been undertaken to determine the ‘state-of-the-art’ of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.