Resumo:

Inner city developments are a common feature within many urban environments. Where these construction sites are not managed effectively, they can negatively impact their surrounding community. The aim of this paper is to identify and document, in an urban context, the numerous issues encounter and subsequent strategies adopted by on-site contractors and local people, in the mitigation of factors which negatively impact their surrounding community. The objectives in achieving this aim are to identify what effect, if any, an urban construction site has on its surrounding environment, the issues and resulting strategies adopted by contractors on the factors identified, and also what measures are put in place to minimise such disturbances to the local community. In order to meet the requirements, a mixed methodology is adopted culminating in a literature review, case study analysis, contractor and community interviews, concluding in the development of two specific questions for both perspectives in question. The data is assessed using severity indices based on mean testing in the development of key findings. The results indicate that the main forms of disturbance to the local community from an urban development include noise, dust and traffic congestion. With respect to a contractor on-site, the key issues include damaging surrounding buildings, noise control and off-site parking. The resulting strategies identified in the mitigation of such issues include the implementation of noise and dust containment measures and minimising disruption to local infrastructure. It is envisaged that the results of this study will provide contractors operating in such environments, with the required information which can assist in minimising disruption and therefore, avoiding disputes with the local community members. By consulting with and surveying those most affected, this research will illustrate to on-site management, the difficulties faced by those who accommodate such developments within their living environment.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

This research concentrates on the critical success factors driving construction quality and the barriers that must be overcome to achieve quality in Brunei. It hopes to identify methods of quality improvement and clearly justify investment in this area of local industry. Over the past number of years, Brunei has attempted to diversify its industry from the dominant oil and gas sector into secondary sectors,
including construction. To date, very little research has been carried out in many areas of construction management that take into account the specific industry context in Brunei. A comprehensive literature review has been employed to enable a questionnaire to be constructed and distributed among Brunei construction
professionals. The results have been analyzed through mean testing. This analysis reveals that the key barriers to construction quality in Brunei relate to lack of skills, lack of clarity in responsibility and communication and poor commitment among the design team. The critical success factors include issues relating to competency, capability, commitment and effectiveness, primarily among managers and decision-makers. The results of this study will hopefully contribute to fill the knowledge gap related to construction management in the context of Brunei and facilitate movement towards improved techniques and strategies that will foster higher quality in construction. The findings can be generalised across similar
developing economies and it is suggested that in general, the management concepts governing construction quality remain similar across the borders of East and West.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Current research agendas are increasingly encouraging the construction industry to operate on the basis of 'added value'. Such debates echo the established concept of 'high value manufacturing' and associated trends towards servitization. Within construction, the so-called 'value agenda' draws heavily from the notion of integrated solutions. This is held to be especially appropriate in the context of PFI projects. Also relevant is the concept of service-led projects whereby the project rationale is driven by the client's objectives for delivering an enhanced service to its own customers. Such ideas are contextualized by a consideration of broader trends of privatization and outsourcing within and across the construction industry's client base. The current emphasis on integrated solutions reflects long-term trends within privatized client organizations towards the outsourcing of asset management capabilities. However, such trends are by no means uniform or consistent. An in-depth case study of three operating divisions within a major construction company illustrates that firms are unlikely to reorientate their business in response to the 'value agenda'. In the case of PFI, the tendency has been to establish specialist units for the purposes of winning work. Meanwhile, institutionally embedded operating routines within the rest of the business remain broadly unaffected.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Research in construction management is diverse in content and in quality. There is much to be learned from more fundamental disciplines. Construction is a sub-set of human experience rather than a completely separate phenomenon. Therefore, it is likely that there are few problems in construction requiring the invention of a completely new theory. If construction researchers base their work only on that of other construction researchers, our academic community will become less relevant to the world at large. The theories that we develop or test must be of wider applicability to be of any real interest. In undertaking research, researchers learn a lot about themselves. Perhaps the only difference between research and education is that if we are learning about something which no-one else knows, then it is research, otherwise it is education. Self-awareness of this will help to reduce the chances of publishing work which only reveals a researcher’s own learning curve. Scientific method is not as simplistic as non-scientists claim and is the only real way of overcoming methodological weaknesses in our work. The reporting of research may convey the false impression that it is undertaken in the sequence in which it is written. Construction is not so unique and special as to require a completely different set of methods from other fields of enquiry. Until our research is reported in mainstream journals and conferences, there is little chance that we will influence the wider academic community and a concomitant danger that it will become irrelevant. The most useful insights will come from research which challenges the current orthodoxy rather than research which merely reports it.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Although the construction pollution index has been put forward and proved to be an efficient approach to reducing or mitigating pollution level during the construction planning stage, the problem of how to select the best construction plan based on distinguishing the degree of its potential adverse environmental impacts is still a research task. This paper first reviews environmental issues and their characteristics in construction, which are critical factors in evaluating potential adverse impacts of a construction plan. These environmental characteristics are then used to structure two decision models for environmental-conscious construction planning by using an analytic network process (ANP), including a complicated model and a simplified model. The two ANP models are combined and called the EnvironalPlanning system, which is applied to evaluate potential adverse environmental impacts of alternative construction plans.