917 resultados para Three Gorges Project
Resumo:
Although discussions are underway within the Action Team 14 of the United Nations COPUOS, there is currently no concerted international plan addressing the impact threat from near-Earth objects (NEOs) and how to organize, prepare and implement mitigation measures. We report on a new international project to address impact hazard mitigation issues, being the subject of a proposal submitted to the European Commission in response to the 2011 FP7 Call "Prevention of impacts from near-Earth objects on our planet". Our consortium consists of 13 research institutes, universities, and industrial partners from 6 countries and includes leading US and Russian space organizations. The primary aim of the project, NEOShield, is to investigate in detail the three most promising mitigation techniques: the kinetic impactor, blast deflection,and the gravity tractor, and devise feasible demonstration missions. Furthermore, we will investigate options for an international strategy for implementation when an actual impact threat arises. The NEOShield project was formally accepted by the European Commission on 17 November 2011 and funded with a total of 5.8 million Euros for a period of 3.5 years. The kick-off meeting took place at the DLR Institute of Planetary Research, Berlin, in January 2012. In this paper we present a brief overview of the planned scope of the project.
Resumo:
The European Union NEOShield project is desribed.The primary aim of the project is to investigate in detail the three most promising mitigation techniques: the kinetic impactor, blast deflection, and the gravity tractor, and devise feasible demonstration missions.
Resumo:
Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.
Resumo:
viii
Executive Summary
The Pathways Project field studies were targeted at improving the understanding of contaminant transport along different hydrological pathways in Irish catchments, including their associated impacts on water quality and river ecology. The contaminants of interest were phosphorus, nitrogen and sediment. The working Pathways conceptual model included overland flow, interflow, shallow groundwater flow, and deep groundwater flow. This research informed the development of a set of Catchment Management Support Tools (CMSTs) comprising an Exploratory Tool, Catchment Characterization Tool (CCT) and Catchment Modelling Tool (CMT) as outlined in Pathways Project Final Reports Volumes 3 and 4.
In order to inform the CMST, four suitable study catchments were selected following an extensive selection process, namely the Mattock catchment, Co. Louth/Meath; Gortinlieve catchment, Co. Donegal; Nuenna catchment, Co. Kilkenny and the Glen Burn catchment, Co. Down. The Nuenna catchment is well drained as it is underlain by a regionally important karstified limestone aquifer with permeable limestone tills and gravels, while the other three catchments are underlain by poorly productive aquifers and low permeability clayey tills, and are poorly drained.
All catchments were instrumented, and groundwater, surface and near-surface water and aquatic ecology were monitored for a period of two years. Intensive water quality sampling during rainfall events was used to investigate the pathways delivering nutrients. The proportion of flow along each pathway was determined using chemical and physical hydrograph separation techniques, supported by numerical modelling.
The outcome of the field studies broadly supported the use of the initial four-pathway conceptual model used in the Pathways CMT (time-variant model). The artificial drainage network was found to be a significant contributing pathway in the poorly drained catchments, at low flows and during peak flows in wet antecedent conditions. The transition zone (TZ), i.e. the broken up weathered zone at the top of the bedrock, was also found to be an important pathway. It was observed to operate in two contrasting hydrogeological scenarios: in groundwater discharge zones the TZ can be regarded as being part of the shallow groundwater pathway, whereas in groundwater recharge zones it behaves more like interflow.
In the catchments overlying poorly productive aquifers, only a few fractures or fracture zones were found to be hydraulically active and the TZ, where present, was the main groundwater pathway. In the karstified Nuenna catchment, the springs, which are linked to conduits as well as to a diffuse fracture network, delivered the majority of the flow. These findings confirm the two-component groundwater contribution from bedrock but suggest that the size and nature of the hydraulically active fractures and the nature of the TZ are the dominant factors at the scale of a stream flow event.
Diffuse sources of nitrate were found to be typically delivered via the subsurface pathways, especially in the TZ and land drains in the poorly productive aquifer catchments, and via the bedrock groundwater in the Nuenna. Phosphorus was primarily transported via overland flow in both particulate and soluble forms. Where preferential flow paths existed in the soil and subsoil, soluble P, and to a lesser extent particulate P, were also transported via the TZ and in drains and ditches. Arable land was found to be the most important land use for
ix
the delivery of sediment, although channel bank and in-stream sources were the most significant in the Glen Burn catchment. Overland flow was found to be the predominant transport sediment pathway in the poorly productive catchments. These findings informed the development of the transport and attenuation equations used in the CCT and CMT. From an assessment of the relationship between physico-chemical and biological conditions, it is suggested that in the Nuenna, Glen Burn and Gortinlieve catchments, a relationship may exist between biological water quality and nitrogen concentrations, as well as with P. In the Nuenna, there was also a relationship between macroinvertebrate status and alkalinity.
Further research is recommended on the transport and delivery of phosphorus in groundwater, the transport and attenuation dynamics in the TZ in different hydrogeological settings and the relationship between macroinvertebrates and co-limiting factors. High resolution temporal and spatial sampling was found to be important for constraining the conceptual understanding of nutrient and sediment dynamics which should also be considered in future studies.
Resumo:
The From Boys to Men Project was funded by the Economic and Social Research
Council to explore why some boys become domestic abuse perpetrators when
others do not. In so doing, it sought to establish what more could be done to
reduce the number of young men who become perpetrators. The study
involved three phases of data collection including: Phase 1 - a survey of school
children aged 13-14, Phase 2 - focus groups with 69 young people aged 13-19,
and Phase 3 - life history interviews with 30 young men, aged 16-21, who
had experienced domestic violence as victims, perpetrators or witnesses.
Resumo:
Comparisons of international child welfare systems have identified two basic orientations to practice; a ‘child protection’ orientation and a ‘child welfare’ orientation, which are founded upon fundamentally different values and assumptions regarding the family, the origins of child care problems, and the proper role of the state in relation to the family. This paper describes a project which sought to compare how undergraduate social work students from three European Universities perceive risk in referrals about the welfare of children and to explore the impact of different cultural, ideological and educational contexts on the way in which risk is constructed by students. Students from Northern Ireland, Germany and Poland examined three vignettes via ten online discussion fora each of which provided a narrative summary of their discussion. The paper presents some findings from the analysis of the qualitative data emerging from the student discussions and draws out the lessons learned in terms of how the project was designed and implemented using online discussion fora.
Resumo:
PURPOSE:
To assess the knowledge of patients with open angle glaucoma (OAG) and their family members about OAG risk factors and to study the referral of family members for eye examinations.
DESIGN:
Cross-sectional survey and prospective cohort study.
METHODS:
We interviewed OAG patients (probands) at the Wilmer Eye Institute and their biologically related parents, siblings, and children about their knowledge of OAG risk factors. Qualified family members were offered an eye examination through the EyeCare America program. Three months after initial contact, a follow-up telephone questionnaire determined the outcome of the referral.
RESULTS:
Among 102 probands and 100 (of 230 eligible) family members who were interviewed, there was high awareness that OAG is related to older age (85% both groups). More probands knew of the association with higher intraocular pressure (95%) compared with family (78%). Yet, 21% of both groups were not aware that OAG is hereditary, and only 53% of probands and 30% of family members knew that OAG is more common in certain ethnic groups. Only two-thirds of probands had suggested that family members have an eye examination. Eighty percent of family members had had an eye examination within the last year; of 21 with no recent examination, 66% (13/21) accepted referral.
CONCLUSIONS:
The Help the Family Glaucoma project developed a novel approach to identify those at high-risk for OAG. Screening of relatives of OAG patients deserves further study in a more representative selection of the general population.
Resumo:
This paper is a summary of an evaluation of the first two years of a three year poetry project for older people with dementia. The project was set up with a poet in residence who mentored six poets to deliver poetry activities to older people and those with dementia in residential and care homes in Herefordshire. The project was developed and run by the Courtyards Hereford. The evaluation was undertake through the use of questionnaires that were given to staff and carers undertaking training workshops and the poets, staff and carers in the homes who facilitated the activities and finally by the residents who took part in the project. The main findings were that participants that responded to the questionnaire for staff and carers it had increased confidence and assisted them in gaining more knowledge about the residents, whilst for residents it had a number of positive effects including enhanced communication, increased self-esteem and enhanced self-worth whilst making them feel less isolated.
Resumo:
Wetland socio-ecological systems provide livelihood benefits for many poor people throughout the developing world, yet their sustainable development requires local utilisation strategies that balance both environmental and development outcomes. Community-based local institutional arrangements that mediate peoples’ relationships with their environment and facilitate adaptive co-management offer one means of achieving this, and increasingly many NGOs and development practitioners have sought to integrate local institutional capacity-building into development projects. In the context of wider academic debates surrounding the long-term sustainability of externally-facilitated local institutions, this paper draws on the experiences of the three-year Striking a Balance (SAB) project in Malawi which sought to embed sustainable wetland management practices within community-based local institutional arrangements. Drawing on field data collected through participatory methods at three project sites some five years after the cessation of project activities, we examine the extent to which SAB’s local institutional capacity-building has been successful, and from this draw some lessons for externally-driven project interventions which seek win-win outcomes for people and the environment. With reference to Elinor Ostrom’s design principles for long-enduring common property resource institutions, we suggest that the observed declining effectiveness of SAB’s local institutions can be attributed to issues of stakeholder inclusiveness and representations; their sustainability was arguably compromised from their inception on account of them being nested within pre-existing, externally-driven village ‘clubs’ whose membership and decision-making was not congruent with all the wetland stakeholders within the community.
Resumo:
In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.
Resumo:
This research study explored a support system for children with learning disabilities. The Learning Disabilities Association of Niagara Region (LDANR) recently expanded its Better Emotional and Social Times (B.E.S.T.) program to incorporate an innovative, character education initiative called the “Who is NOBODY?” program. The objective of this qualitative case study was two-fold. First, the study aimed to support the LDANR in assessing the efficacy of the “Who is NOBODY?” program, providing the LDANR with empirical support for their programs. Second, the study enabled a more in-depth understanding of how to best support children with LD in regards to their social and emotional well-being. The study explored the “Who is NOBODY?” program through three lenses: design, implementation, and experiences of participating children. Three primary themes emerged from these three data lenses: positive character traits, prosocial behaviour, and strong self-efficacy – leading to the promotion of strong character development and self-esteem. Taken together, the “Who is NOBODY?” program was shown to be a successful remediation program for supporting vulnerable children with LD.
Resumo:
The Autism Acceptance Project was established in 2006 by Estee Klar, an art curator, writer and mother to a child labeled autistic. The Project “is dedicated to promoting acceptance of and accommodations for autistic people in society.” TAAP has an autistic advisory board, and is funded by private donations. In 2006, TAAP organized an exhibition, The Joy of Autism: Redefining Ability and Quality of Life. The event displayed the work of a dozen autistic artists, as well as video and other installations which illustrated the burgeoning autistic rights movement and forwarded the concept of Neurodiversity.
Resumo:
"Suite à plus de deux années de recherches, le projet de l’American Bar Association (ABA) concernant la juridiction du cyberespace, « Achieving Legal and Business Order in Cyberspace: A Report on Global Jurisdiction Issues Created by the Internet », a été publié dans l’édition du mois d’août 2000 de la revue juridique The Business Lawyer. Ce rapport poursuivait deux objectifs distincts : Tout d’abord, effectuer une analyse globale des complexités potentielles entourant les conflits juridictionnels découlant du commerce en ligne. Ensuite, élaborer une liste exhaustive des solutions pouvant être utilisées pour résoudre de tels conflits. Le présent article se veut un résumé concis et accessible des trois grandes sections du « Cyberspace Jurisdiction Report » : (1) les solutions proposées aux problèmes juridictionnels découlant des conflits résultant du commerce électronique ; (2) afin d’appuyer les solutions proposées : l’utilisation d’exemples d’occasions où la technologie a déjà, par le passé, causé la métamorphose de certains paradigmes juridictionnels; et (3) afin d’appuyer les solutions proposées : l’utilisation d’un contexte doctrinal."
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The aim of this study is to investigate the role of operational flexibility for effective project management in the construction industry. The specific objectives are to: a) Identify the determinants of operational flexibility potential in construction project management b) Investigate the contribution of each of the determinants to operational flexibility potential in the construction industry c) Investigate on the moderating factors of operational flexibility potential in a construction project environment d) Investigate whether moderated operational flexibility potential mediates the path between predictors and effective construction project management e) Develop and test a conceptual model of achieving operational flexibility for effective project management The purpose of this study is to findout ways to utilize flexibility inorder to manage uncertain project environment and ultimately achieve effective project management. In what configuration these operational flexibility determinants are demanded by construction project environment in order to achieve project success. This research was conducted in three phases, namely: (i) exploratory phase (ii) questionnaire development phase; and (iii) data collection and analysis phase. The study needs firm level analysis and therefore real estate developers who are members of CREDAI, Kerala Chapter were considered. This study provides a framework on the functioning of operational flexibility, offering guidance to researchers and practitioners for discovering means to gain operational flexibility in construction firms. The findings provide an empirical understanding on kinds of resources and capabilities a construction firm must accumulate to respond flexibly to the changing project environment offering practitioners insights into practices that build firms operational flexibility potential. Firms are dealing with complex, continuous changing and uncertain environments due trends of globalization, technical changes and innovations and changes in the customers’ needs and expectations. To cope with the increasingly uncertain and quickly changing environment firms strive for flexibility. To achieve the level of flexibility that adds value to the customers, firms should look to flexibility from a day to day operational perspective. Each dimension of operational flexibility is derived from competences and capabilities. In this thesis only the influence on customer satisfaction and learning exploitation of flexibility dimensions which directly add value in the customers eyes are studied to answer the followingresearch questions: “What is the impact of operational flexibility on customer satisfaction?.” What are the predictors of operational flexibility in construction industry? .These questions can only be answered after answering the questions like “Why do firms need operational flexibility?” and “how can firms achieve operational flexibility?” in the context of the construction industry. The need for construction firms to be flexible, via the effective utilization of organizational resources and capabilities for improved responsiveness, is important because of the increasing rate of changes in the business environment within which they operate. Achieving operational flexibility is also important because it has a significant correlation with a project effectiveness and hence a firm’s turnover. It is essential for academics and practitioners to recognize that the attainment of operational flexibility involves different types namely: (i) Modification (ii) new product development and (iii) demand management requires different configurations of predictors (i.e., resources, capabilities and strategies). Construction firms should consider these relationships and implement appropriate management practices for developing and configuring the right kind of resources, capabilities and strategies towards achieving different operational flexibility types.