905 resultados para Residential building construction
Resumo:
The delivery of products and services for construction-based businesses is increasingly becoming knowledge-driven and information-intensive. The proliferation of building information modelling (BIM) has increased business opportunities as well as introduced new challenges for the architectural, engineering and construction and facilities management (AEC/FM) industry. As such, the effective use, sharing and exchange of building life cycle information and knowledge management in building design, construction, maintenance and operation assumes a position of paramount importance. This paper identifies a subset of construction management (CM) relevant knowledge for different design conditions of building components through a critical, comprehensive review of synthesized literature and other information gathering and knowledge acquisition techniques. It then explores how such domain knowledge can be formalized as ontologies and, subsequently, a query vocabulary in order to equip BIM users with the capacity to query digital models of a building for the retrieval of useful and relevant domain-specific information. The formalized construction knowledge is validated through interviews with domain experts in relation to four case study projects. Additionally, retrospective analyses of several design conditions are used to demonstrate the soundness (realism), completeness, and appeal of the knowledge base and query-based reasoning approach in relation to the state-of-the-art tools, Solibri Model Checker and Navisworks. The knowledge engineering process and the methods applied in this research for information representation and retrieval could provide useful mechanisms to leverage BIM in support of a number of knowledge intensive CM/FM tasks and functions.
Resumo:
Construction firms that employ collaborative procurement approaches develop operating routines through joint learning so as to improve infrastructure project performance. This paper reports a study based on a survey sample of 320 construction practitioners which were involved in collaborative infrastructure delivery in Australia. The study developed valid and reliable scales for measuring collaborative learning capability (CLC), and used the scales to evaluate the CLC of contractor and consultant firms within the sample. The evaluation suggests that whilst these firms explore knowledge from both internal and external sources, transform both explicit and tacit knowledge, and apply and internalise new knowledge, they can improve the extent to which these routines are applied to optimise project performance.
Resumo:
This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
Building with Scottish Stone aims to encourage more use of stone sourced from Scotland’s working quarries and to provide a better understanding of those mineralogical properties which give each stone its distinctive quality. The nation’s architectural history is synonymous with the use of natural stone, and the principles of construction developed over generations in response to Scotland’s particular climatic conditions still find relevance today in the design and detailing of new buildings. Equally, an understanding of the ways in which stone is extracted and processed is as fundamental to its contemporary use as having up-to-date knowledge of the continuously changing legislation that affects its specification and procurement. Building with Scottish Stone is a stimulating introduction to these and many other factors to be considered when using this richly-varied and timeless resource in the design of new buildings.
Resumo:
In order to resist lateral loads, modern methods of timber construction are reliant on the in-plane shear strength of the walls orientated parallel to the applied action. In closed panel systems, the shear stresses are transferred to the foundations by the sole plate through the sheathing board, which is usually mechanically jointed to the timber frame. Since closed panels are delivered to site as single units, access to the internal bottom rail is rather restricted and novel, efficient solutions to secure the panel to the substrate are required. Sole plate fixing components for open and closed panel systems were tested in isolation and combination in order to validate a simplistic version of the weakest link theory. As a result, findings were embedded into a software database with a direct link to a previously developed sole plate and racking design application. This integrated process facilitates the structural optimization of the sole plate detail.
Resumo:
The purpose of this paper is to describe and demonstrate some of the advanced behavioral features currently being developed for the building-EXODUS evacuation model. These advanced features involve the ability to specify roles for particular individuals during the evacuation. With these enhancements to the Behavioral Sub model of building-EXODUS, it is possible to include a number of procedural and behavioral aspects previously ignored in evacuation simulations. These include the behavioral aspect of group bonding, the procedural aspects involved with the role of the fire warden and rescue operations undertaken by the fire services. The importance of these enhancements are discussed and demonstrated through three simple simulations.
Resumo:
In this article, the representation of the merging process at the floor— stair interface is examined within a comprehensive evacuation model and trends found in experimental data are compared with model predictions. The analysis suggests that the representation of floor—stair merging within the comprehensive model appears to be consistent with trends observed within several published experiments of the merging process. In particular: (a) The floor flow rate onto the stairs decreases as the stair population density increases. (b) For a given stair population density, the floor population's flow rate onto the stairs can be maximized by connecting the floor to the landing adjacent to the incoming stair. (c) In situations where the floor is connected adjacent to the incoming stair, the merging process appears to be biased in favor of the floor population. It is further conjectured that when the floor is connected opposite the incoming stair, the merging process between the stair and floor streams is almost in balance for high stair population densities, with a slight bias in favor of the floor stream at low population densities. A key practical finding of this analysis is that the speed at which a floor can be emptied onto a stair can be enhanced simply by connecting the floor to the landing at a location adjacent to the incoming stair rather than opposite the stair. Configuring the stair in this way, while reducing the floor emptying time, results in a corresponding decrease in the descent flow rate of those already on the stairs. While this is expected to have a negligible impact on the overall time to evacuate the building, the evacuation time for those higher up in the building is extended while those on the lower flows is reduced. It is thus suggested that in high-rise buildings, floors should be connected to the landing on the opposite side to the incoming stair. Information of this type will allow engineers to better design stair—floor interfaces to meet specific design objectives.
Resumo:
This paper presents a description of a new agent based elevator sub-model developed as part of the buildingEXODUS software intended for both evacuation and circulation applications. A description of each component of the newly developed model is presented, including the elevator kinematics and associated pedestrian behaviour. The elevator model is then used to investigate a series of full building evacuation scenarios based on a hypothetical 50 floor building with four staircases and a population of 7,840 agents. The analysis explores the relative merits of using up to 32 elevators (arranged in four banks) and various egress strategies to evacuate the entire building population. Findings from the investigation suggest that the most efficient evacuation strategy utilises a combination of elevators and stairs to empty the building and clear the upper half of the building in minimum time. Combined stair elevator evacuation times have been shown to be as much as 50% faster than stair only evacuation times.
Resumo:
La necesidad de contar con un mapa de base científica que cubriera todo el territorio español llevó al Estado a crear en paralelo varias Comisiones con cometidos geodésicos, topográficos y cartográficos durante la década de 1850. La labor simultánea de estas Comisiones se prolongó hasta 1859, cuando se aprobó la Ley de Medición del Territorio, que las fusionó en un único organismo. Este artículo analiza aspectos técnicos de los trabajos que realizaron estas Comisiones a partir de la información contenida en algunos documentos que custodia el Archivo Topográfico del IGN. Las conclusiones que se extraen son que estas Comisiones acometieron operaciones geodésicas que resultaron cruciales en el establecimiento ulterior de la red de triangulación peninsular, realizaron mediciones topográficas que fueron reutilizadas veinte años después en el levantamiento del Mapa Topográfico Nacional, e idearon las características catastrales que fueron adoptadas durante todo el siglo posterior para el Catastro de España.
Resumo:
This thesis is aimed to initiate implementing sustainable building construction in the kingdom of Bahrain, i.e. Building-Integration PhotoVoltaic (BIPV) or Wind Energy (BIWE). It highlights the main constrains that discourage such modern concept in building and construction. Three groups have been questioned using a questionnaire. These are the policy and decision makers, the leading consultants and the contractors. The main constrains of the dissemination of BIVP and BIWE, according to the policy and decision makers, are: lack of knowledge and awareness of the public in sustainable technology, low cost of electricity, low cost of gas and oil and difficulty in applying local environmental taxes. The consultants had attributed the constrains to ignorance of life cycle cost of PV and Wind turbines systems, lack of education and knowledge in sustainable design, political system, shortage of markets importing sustainable technologies and client worries in profitability and pay-back period. The contractors are found to be very enthusiastic and ready to take over any sustainable building project and prefer to have a construction manger to coordinate between the design and contracting team. Design and Build is found the favorable procurement method in Bahrain for conducting BIPV or BIWE projects.