995 resultados para Rand Park Flood Control Project (Cook County, Ill.)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Urbanization is a continuing phenomenon in all the world. Grasslands, forests, etc. are being continually changed to residential, commercial and industrial complexes, roads and streets, and so on. One of the side effects of urbanization with which engineers and planners must deal with, is the increase of peak flows and volumes of runoff from rainfall events. As a result, the urban drainage and flood control systems must be designed to accommodate the peak flows from a variety of storms that may occur. Usually the peak flow, after development, is required not to exceed what would have occurred from the same storm under conditions existing prior to development. In order to do this it is necessary to design detention storage to hold back runoff and to release it downstream at controlled rates. In the first part of the work have been developed various simplified formulations that can be adopted for the design of stormwater detention facilities. In order to obtain a simplified hydrograph were adopted two approaches: the kinematic routing technique and the linear reservoir schematization. For the two approaches have been also obtained other two formulations depending if the IDF (intensity-duration-frequency) curve is described with two or three parameters. Other formulations have been developed taking into account if the outlet have a constant discharge or it depends on the water level in the pond. All these formulations can be easily applied when are known the characteristics of the drainage system and maximum discharge that these is in the outlet and has been defined a Return Period which characterize the IDF curve. In this way the volume of the detention pond can be calculated. In the second part of the work have been analyzed the design of detention ponds adopting continuous simulation models. The drainage systems adopted for the simulations, performed with SWMM5, are fictitious systems characterized by different sizes, and different shapes of the catchments and with a rainfall historical time series of 16 years recorded in Bologna. This approach suffers from the fact that continuous record of rainfall is often not available and when it is, the cost of such modelling can be very expensive, and that the majority of design practitioners are not prepared to use continuous long term modelling in the design of stormwater detention facilities. In the third part of the work have been analyzed statistical and stochastic methodologies in order to define the volume of the detention pond. In particular have been adopted the results of the long term simulation, performed with SWMM, to obtain the data to apply statistic and stochastic formulation. All these methodologies have been compared and correction coefficient have been proposed on the basis of the statistic and stochastic form. In this way engineers which have to design a detention pond can apply a simplified procedure appropriately corrected with the proposed coefficient.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Der Beitrag stellt eine Kollaborationssoftware vor, die im Rahmen des AiF-Forschungsprojektes „KoDeMat“ entwickelt wurde. Der Fokus wird auf die Problemfelder der fehlenden Standardisierung und Anpassbarkeit im Bereich von fördertechnischen Anlagen gerichtet. Ziel ist, unter Zuhilfenahme von standardisierten, kollaborativen Engineeringprozessen, eine unternehmensübergreifende Planung, Realisierung und einen Umbau von komplexen dezentral gesteuerten Intralogistiksystemen sowie deren Betrieb effizient zu ermöglichen.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the impact of land title systems on property values. The predominant system in the U.S., the recording system, awards title to claimants over current possessors, whereas the Torrens registration system awards title to the current owner. In theory, the registration system maximizes property value, all else equal, but in practice, the systems differ depending on the risk of a claim and administrative costs. A natural experiment in Cook County, Illinois, where both systems have existed since 1897, allows a test of the theory. The results, based on commercial and industrial properties, reveal that parcels tend to self-select into the two systems based on the predictions of the theory.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Esta tesis realiza una contribución metodológica al problema de la gestión óptima de embalses hidroeléctricos durante eventos de avenidas, considerando un enfoque estocástico y multiobjetivo. Para ello se propone una metodología de evaluación de estrategias de laminación en un contexto probabilístico y multiobjetivo. Además se desarrolla un entorno dinámico de laminación en tiempo real con pronósticos que combina un modelo de optimización y algoritmos de simulación. Estas herramientas asisten a los gestores de las presas en la toma de decisión respecto de cuál es la operación más adecuada del embalse. Luego de una detallada revisión de la bibliografía, se observó que los trabajos en el ámbito de la gestión óptima de embalses en avenidas utilizan, en general, un número reducido de series de caudales o hidrogramas para caracterizar los posibles escenarios. Limitando el funcionamiento satisfactorio de un modelo determinado a situaciones hidrológicas similares. Por otra parte, la mayoría de estudios disponibles en este ámbito abordan el problema de la laminación en embalses multipropósito durante la temporada de avenidas, con varios meses de duración. Estas características difieren de la realidad de la gestión de embalses en España. Con los avances computacionales en materia de gestión de información en tiempo real, se observó una tendencia a la implementación de herramientas de operación en tiempo real con pronósticos para determinar la operación a corto plazo (involucrando el control de avenidas). La metodología de evaluación de estrategias propuesta en esta tesis se basa en determinar el comportamiento de éstas frente a un espectro de avenidas características de la solicitación hidrológica. Con ese fin, se combina un sistema de evaluación mediante indicadores y un entorno de generación estocástica de avenidas, obteniéndose un sistema implícitamente estocástico. El sistema de evaluación consta de tres etapas: caracterización, síntesis y comparación, a fin de poder manejar la compleja estructura de datos resultante y realizar la evaluación. En la primera etapa se definen variables de caracterización, vinculadas a los aspectos que se quieren evaluar (seguridad de la presa, control de inundaciones, generación de energía, etc.). Estas variables caracterizan el comportamiento del modelo para un aspecto y evento determinado. En la segunda etapa, la información de estas variables se sintetiza en un conjunto de indicadores, lo más reducido posible. Finalmente, la comparación se lleva a cabo a partir de la comparación de esos indicadores, bien sea mediante la agregación de dichos objetivos en un indicador único, o bien mediante la aplicación del criterio de dominancia de Pareto obteniéndose un conjunto de soluciones aptas. Esta metodología se aplicó para calibrar los parámetros de un modelo de optimización de embalse en laminación y su comparación con otra regla de operación, mediante el enfoque por agregación. Luego se amplió la metodología para evaluar y comparar reglas de operación existentes para el control de avenidas en embalses hidroeléctricos, utilizando el criterio de dominancia. La versatilidad de la metodología permite otras aplicaciones, tales como la determinación de niveles o volúmenes de seguridad, o la selección de las dimensiones del aliviadero entre varias alternativas. Por su parte, el entorno dinámico de laminación al presentar un enfoque combinado de optimización-simulación, permite aprovechar las ventajas de ambos tipos de modelos, facilitando la interacción con los operadores de las presas. Se mejoran los resultados respecto de los obtenidos con una regla de operación reactiva, aun cuando los pronósticos se desvían considerablemente del hidrograma real. Esto contribuye a reducir la tan mencionada brecha entre el desarrollo teórico y la aplicación práctica asociada a los modelos de gestión óptima de embalses. This thesis presents a methodological contribution to address the problem about how to operate a hydropower reservoir during floods in order to achieve an optimal management considering a multiobjective and stochastic approach. A methodology is proposed to assess the flood control strategies in a multiobjective and probabilistic framework. Additionally, a dynamic flood control environ was developed for real-time operation, including forecasts. This dynamic platform combines simulation and optimization models. These tools may assist to dam managers in the decision making process, regarding the most appropriate reservoir operation to be implemented. After a detailed review of the bibliography, it was observed that most of the existing studies in the sphere of flood control reservoir operation consider a reduce number of hydrographs to characterize the reservoir inflows. Consequently, the adequate functioning of a certain strategy may be limited to similar hydrologic scenarios. In the other hand, most of the works in this context tackle the problem of multipurpose flood control operation considering the entire flood season, lasting some months. These considerations differ from the real necessity in the Spanish context. The implementation of real-time reservoir operation is gaining popularity due to computational advances and improvements in real-time data management. The methodology proposed in this thesis for assessing the strategies is based on determining their behavior for a wide range of floods, which are representative of the hydrological forcing of the dam. An evaluation algorithm is combined with a stochastic flood generation system to obtain an implicit stochastic analysis framework. The evaluation system consists in three stages: characterizing, synthesizing and comparing, in order to handle the complex structure of results and, finally, conduct the evaluation process. In the first stage some characterization variables are defined. These variables should be related to the different aspects to be evaluated (such as dam safety, flood protection, hydropower, etc.). Each of these variables characterizes the behavior of a certain operating strategy for a given aspect and event. In the second stage this information is synthesized obtaining a reduced group of indicators or objective functions. Finally, the indicators are compared by means of an aggregated approach or by a dominance criterion approach. In the first case, a single optimum solution may be achieved. However in the second case, a set of good solutions is obtained. This methodology was applied for calibrating the parameters of a flood control model and to compare it with other operating policy, using an aggregated method. After that, the methodology was extent to assess and compared some existing hydropower reservoir flood control operation, considering the Pareto approach. The versatility of the method allows many other applications, such as determining the safety levels, defining the spillways characteristics, among others. The dynamic framework for flood control combines optimization and simulation models, exploiting the advantages of both techniques. This facilitates the interaction between dam operators and the model. Improvements are obtained applying this system when compared with a reactive operating policy, even if the forecasts deviate significantly from the observed hydrograph. This approach contributes to reduce the gap between the theoretical development in the field of reservoir management and its practical applications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El objetivo principal es desarrollar la metodología de opciones reales para evaluar la posible puesta en marcha de un proyecto minero. Para esto, el proyecto se divide en dos partes: En la primera parte, con carácter teórico se analizan las inversiones desde el punto de vista tradicional, comparando la problemática de estas valoraciones en ambientes de incertidumbre y flexibilidad operativa. Se analizan las opciones financieras y se comparan con las opciones reales, en cuanto a similitudes y problemáticas. Se desarrollan también los procesos estocásticos que afectan a las variables del proyecto de inversión. Se explican además, las metodologías para el cálculo de las opciones reales, incluido el cálculo de la volatilidad de las mismas. En una segunda parte, se estudia el yacimiento aurífero de Corcoesto, para el cual se realiza la simulación del plan de negocio según las características necesarias para la explotación, donde los ingresos se modelizan mediante un movimiento geométrico browniano para simular el comportamiento del precio de la onza de oro. Se elige un desarrollo de árboles binomiales para estimar el valor futuro del proyecto, a la vez que se establece un intervalo de precios de la opción para adquirir el proyecto minero. Este intervalo estará determinado por las incertidumbres del proyecto calculadas según las metodologías de Copeland y Antikarov, y Heraht y Park. Abstract This project is aimed mainly to develop real options theory to assess a mining project start-up. The project is divided in two documents: The first document with theorical content, investments are analyzed from the clasical point of view, comparing the advantages and disadvantages of this appraisal in high uncertainity and operational flexibility conditions. Financial options are analyzed and compared to real options, in both similarities and problematics. Stochastical process that affect the project variables are also developed. Methods for estimating real options value, including the methods for volatility estimation are commented. In the second document, the Corcoesto gold deposit has been studied. A bussines plan simulation has been maked according to the characteristics of the extraction, where incomes have been simulated with a geometrical Brownian movement to estimate the gold onze behaviour. The binomial tree method has been generated to study the future project value, as well as a range of option prices, for adquiring the mine project. This interval is determined by the project uncertainity calculated with the theories from Copeland and Antikarov and Herath and Park

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this chapter is to discuss the applicability of recently proposed knowledge modelling tools to the development of agent-based systems. The discussion is derived from the real world experience of a particular software tool called KSM (Knowledge Structure Manager). The chapter provides details about this tool and then proceeds to show in which forms the software may be used to support the development of agent-based systems. Two multiagent systems, one in the field of telecommunications management and the other one in the field of flood control, are described. Conclusions about these studies are presented, summarizing the main contributions that knowledge modelling tools can bring to the development of agent-based systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

By Frank E. Wing, superintendent.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cover title.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"September 1993."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Traffic Safety Administration, Office of Driver and Pedestrian Programs, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Traffic Safety Administration, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

National Highway Traffic Safety Administration, Washington, D.C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: No. 38.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Minnesota Commission on Alcohol Problems