931 resultados para RETURN
Resumo:
Is it profitable for an investor, from a risk-return perspective, to acquire a stake in a quoted company when a capital increase is announced? This paper analyses the return obtained from the investment in equity issues with cash contribution and pre-emptive rights, aimed at funding corporate activities: acquisitions, investments in new facilities and/or strengthening the balance sheet of the companies undertaking the equity issue. During the 16 years covered by the study, the results show a negative average excess risk-adjusted return of almost 5%, from the moment that the equity offer is announced until the completion of the preferential subscription period. To obtain this excess return, the difference between the nominal Internal Rate of Return (IRR) and the expected return, using the CAPM, is computed for each equity issue. The intention behind this method is to eliminate the effects of time and any other possible effect on the stock price during the period of the analysis.The results from this article are consistent with the Pecking Order theory for the Spanish Stock Market also six months after the preferential subscription period. However, there is a positive return after three months.
Resumo:
In this paper, the design and experimental characterization of a tunable microstrip bandpass filter based on liquid crystal technology are presented. A reshaped microstrip dual-mode filter structure has been used in order to improve the device performance. Specifically, the aim is to increase the pass-band return loss of the filter by narrowing the filter bandwidth. Simulations confirm the improvement of using this new structure, achieving a pass-band return loss increase of 1.5 dB at least. Because of the anisotropic properties of LC molecules, a filter central frequency shift from 4.688 GHz to 5.045 GHz, which means a relative tuning range of 7.3%, is measured when an external AC voltage from 0 Vrms to 15 Vrms is applied to the device.
Resumo:
A Return to Little Things includes three nonfiction pieces that revolve around the mistakes made by mothers and daughters. The collection investigates the idea that our lives are a sum total of the choices we have made. The essays directly address three specific situations that touch on the themes of motherhood, choices, and the human inclination to recall them with bitterness, and offer proof that time often allows us to move forward to forgiveness. Using humor and acceptance, the narrator is led through a labyrinth of emotions to come to peace with these choices. The stories serve as reminders that there are no mistakes, only lessons, and we must seek to understand them to live happy lives. This manuscript is a work in progress.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.
Resumo:
Lists books borrowed by many individuals, including Governor William Shirley, Colonel Brinley, General Brattle, Secretary Willard, Judge Danforth, Colonel Wendell, Thomas Oliver, Christ Bridge Marsh, and Francis Foxcroft. Entries include the author and title of the borrowed volumes.
Resumo:
Document concerns how certain lands around Casco Bay, York Co., Maine, were partitioned in accordance with an order of a writ.
Resumo:
LIDAR (LIght Detection And Ranging) first return elevation data of the Boston, Massachusetts region from MassGIS at 1-meter resolution. This LIDAR data was captured in Spring 2002. LIDAR first return data (which shows the highest ground features, e.g. tree canopy, buildings etc.) can be used to produce a digital terrain model of the Earth's surface. This dataset consists of 74 First Return DEM tiles. The tiles are 4km by 4km areas corresponding with the MassGIS orthoimage index. This data set was collected using 3Di's Digital Airborne Topographic Imaging System II (DATIS II). The area of coverage corresponds to the following MassGIS orthophoto quads covering the Boston region (MassGIS orthophoto quad ID: 229890, 229894, 229898, 229902, 233886, 233890, 233894, 233898, 233902, 233906, 233910, 237890, 237894, 237898, 237902, 237906, 237910, 241890, 241894, 241898, 241902, 245898, 245902). The geographic extent of this dataset is the same as that of the MassGIS dataset: Boston, Massachusetts Region 1:5,000 Color Ortho Imagery (1/2-meter Resolution), 2001 and was used to produce the MassGIS dataset: Boston, Massachusetts, 2-Dimensional Building Footprints with Roof Height Data (from LIDAR data), 2002 [see cross references].