973 resultados para Product planning
Resumo:
Chinese landscape architects are largely focused on objective practical solutions to environmental problems. In the West, theoretical landscape knowledge is largely conceptual and abstract. This research debated how Australian ecological concepts could or should be transposed to Chinese landscapes. This project responded to severe water and soil pollution issues in the estuarine and riparian zones of rivers flowing into Dongting Lake, in Yueyang City, Hunan Province. This work proposed a range of waterfront design innovations that challenged the notion of corridor as habitat, filter, barrier and conduit in a Chinese riparian context.
Resumo:
International practice-led design research in landscape architecture has identified water quality and water availability as two of the most important environmental issues in developing countries. China is particularly focused on improving water supplies for its rural and urban populations. However a significant gap in knowledge exists between urban planning and environmental engineering in China as to how to design Chinese public open spaces to reduce water pollution in urban rivers. This project responded to traditional zoning methods in Shijiazhuang City, Hebei Province, by proposing a range of water sensitive design innovations from lake construction to planting design to modify standardised engineering solutions in a Chinese context.
Resumo:
In many product categories of durable goods such as TV, PC, and DVD player, the largest component of sales is generated by consumers replacing existing units. Aggregate sales models proposed by diffusion of innovation researchers for the replacement component of sales have incorporated several different replacement distributions such as Rayleigh, Weibull, Truncated Normal and Gamma. Although these alternative replacement distributions have been tested using both time series sales data and individual-level actuarial “life-tables” of replacement ages, there is no census on which distributions are more appropriate to model replacement behaviour. In the current study we are motivated to develop a new “modified gamma” distribution by two reasons. First we recognise that replacements have two fundamentally different drivers – those forced by failure and early, discretionary replacements. The replacement distribution for each of these drivers is expected to be quite different. Second, we observed a poor fit of other distributions to out empirical data. We conducted a survey of 8,077 households to empirically examine models of replacement sales for six electronic consumer durables – TVs, VCRs, DVD players, digital cameras, personal and notebook computers. This data allows us to construct individual-level “life-tables” for replacement ages. We demonstrate the new modified gamma model fits the empirical data better than existing models for all six products using both a primary and a hold-out sample.
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
In today's technological age, fraud has become more complicated, and increasingly more difficult to detect, especially when it is collusive in nature. Different fraud surveys showed that the median loss from collusive fraud is much greater than fraud perpetrated by a single person. Despite its prevalence and potentially devastating effects, collusion is commonly overlooked as an organizational risk. Internal auditors often fail to proactively consider collusion in their fraud assessment and detection efforts. In this paper, we consider fraud scenarios with collusion. We present six potentially collusive fraudulent behaviors and show their detection process in an ERP system. We have enhanced our fraud detection framework to utilize aggregation of different sources of logs in order to detect communication and have further enhanced it to render it system-agnostic thus achieving portability and making it generally applicable to all ERP systems.
Resumo:
Construction 2020 is a national initiative undertaken by CRC for Construction Innovation to focus its ongoing leadership of the Australian property and construction industry in applied research and best contribute to the industry's national and international growth and competitiveness. It is the first major report on the long-term outlook for the industry since the late 1990s. The report identifies nine key themes for the future of the property and construction industry. These visions describe the major concerns of the industry and the improved future working environment favoured by its stakeholders. The first and clearest vision, agreed across the industry, is that environmentally sustainable construction the creation of buildings and infrastructure that minimise their impact on the natural environment is an area of huge potential. Here technologies like Construction Innovation's LCADesign can make a big difference. This is a calculator that works out automatically from 3D computer-aided design the environmental costs of materials in a building all at the push of a button. By working with industry, we'd expect to have a comprehensive set of eco-design tools for all stages of the construction life cycle, to minimise energy use, greenhouse and other forms of waste or pollution. Other significant areas of focus in the report include the development of nationally uniform codes of practice, new tools to evaluate design and product performance, comparisons with overseas industries, and a worldwide research network to ensure that Australian technology is at the cutting edge.
Resumo:
Community engagement with time poor and seemingly apathetic citizens continues to challenge local governments. Capturing the attention of a digitally literate community who are technology and socially savvy adds a new quality to this challenge. Community engagement is resource and time intensive, yet local governments have to manage on continually tightened budgets. The benefits of assisting citizens in taking ownership in making their community and city a better place to live in collaboration with planners and local governments are well established. This study investigates a new collaborative form of civic participation and engagement for urban planning that employs in-place digital augmentation. It enhances people’s experience of physical spaces with digital technologies that are directly accessible within that space, in particular through interaction with mobile phones and public displays. The study developed and deployed a system called Discussions in Space (DIS) in conjunction with a major urban planning project in Brisbane. Planners used the system to ask local residents planning-related questions via a public screen, and passers-by sent responses via SMS or Twitter onto the screen for others to read and reflect, hence encouraging in-situ, real-time, civic discourse. The low barrier of entry proved to be successful in engaging a wide range of residents who are generally not heard due to their lack of time or interest. The system also reflected positively on the local government for reaching out in this way. Challenges and implications of the short-texted and ephemeral nature of this medium were evaluated in two focus groups with urban planners. The paper concludes with an analysis of the planners’ feedback evaluating the merits of the data generated by the system to better engage with Australia’s new digital locals.
Resumo:
To obtain minimum time or minimum energy trajectories for robots it is necessary to employ planning methods which adequately consider the platform’s dynamic properties. A variety of sampling, graph-based or local receding-horizon optimisation methods have previously been proposed. These typically use simplified kino-dynamic models to avoid the significant computational burden of solving this problem in a high dimensional state-space. In this paper we investigate solutions from the class of pseudospectral optimisation methods which have grown in favour amongst the optimal control community in recent years. These methods have high computational efficiency and rapid convergence properties. We present a practical application of such an approach to the robot path planning problem to provide a trajectory considering the robot’s dynamic properties. We extend the existing literature by augmenting the path constraints with sensed obstacles rather than predefined analytical functions to enable real world application.
Resumo:
This report examines the involvement of manufacturers in value-adding through service-enhancement of product offerings. This focus has been prompted by: emphasis in the knowledge-economy literature on the increasing role played by services in economic growth; and recent analysis which suggests that the most dynamic sector of many economies is an integrated manufacturing-services sector (see Part One of this report). The report initially describes the emergence of an integrated manufacturing-services sector in the context of increasingly knowledge-based economic systems. Part Two reports on the results of a survey of manufacturers in the building and construction product system, investigating their involvement in service provision. Parts Three and Four present two case studies of exemplary manufacturers involved in adding value to their manufacturing operations through services offered on building and construction projects. The report examines manufacturers of materials, products, equipment and machinery used on building and construction projects. The two case study sections of the report, in part, focus on a major project undertaken by each of the manufacturers. This project element of activity is focussed on (as opposed to wholesale or retail supply), because this area of activity involves a broader array of service-enhancement mechanisms and more complex bundling of products and services.
Resumo:
This report examines the conditions surrounding the emergence and growth of innovative new firms in the building and construction product system. The focus on innovative new firms was prompted by diverse literatures which highlight the pivotal roles of innovation and new business activity in driving economic growth. 9 The literature concludes that the founders of new firms are likely to be innovative and that new firms are likely to promote industry innovation and efficiency. New businesses have also been found to have positive employment impacts and to grow faster than established firms.
Resumo:
This Preliminary Report has been prepared by researchers at The Australian Expert Group in Industry Studies (AEGIS) for the Commonwealth Department of Industry, Science and Resources. It is intended to provide a preliminary 'product system map' of the building and construction industries which defines the system, identifies the major segments, describes key industry players and institutions and provides the basis for exploring relationships, innovation and information flows within the industries. This Preliminary Report is the first of a series of five which will explore the building and construction product system in some depth. This first report does not present original research, although it does include some new interview data and analysis of a variety of written sources. This report is rather a reformulation of existing statistical and analytical material from a product system-based perspective. It is intended to provide the basis for subsequent studies by putting what is already known into an alternative framework and allowing us to see it through a new lens.
Resumo:
During 1999 the Department of Industry, Science and Resources (ISR) published 4 research reports it had commissioned from the Australian Expert Group in Industry Studies (AEGIS), a research centre of the University of Western Sydney, Macarthur. ISR will shortly publish the fifth and final report in this series. The five reports were commissioned by the Department, as part of the Building and Construction Action Agenda process, to investigate the dynamics and performance of the sector, particularly in relation its innovative capacity. Professor Jane Marceau, PVCR at the University of Western Sydney and Director of AEGIS, led the research team. Dr Karen Manley was the researcher and joint author on three of the five reports. This paper outlines the approach and key findings of each of the five reports. The reports examined 5 key elements of the ‘building and construction product system’. The term ‘product system’ reflects the very broad range of industries and players we consider to contribute to the performance of the building and construction industries. The term ‘product system’ also highlights our focus on the systemic qualities of the building and construction industries. We were most interested in the inter-relationships between key segments and players and how these impacted on the innovation potential of the product system. The ‘building and construction product system’ is hereafter referred to as ‘the industry’ for ease of presentation. All the reports are based, at least in part, on an interviewing or survey research phase which involved gathering data from public and private sector players nationally. The first report ‘maps’ the industry to identify and describe its key elements and the inter-relationships between them. The second report focuses specifically on the linkages between public-sector research organisations and firms in the industry. The third report examines the conditions surrounding the emergence of new businesses in the industry. The fourth report examines how manufacturing businesses are responding to customer demands for ‘total solutions’ to their building and construction needs, by providing various services to clients. The fifth report investigates the capacity of the industry to encourage and undertake energy efficient building design and construction.
Resumo:
Competitive markets are increasingly driving new initiatives for shorter cycle times resulting in increased overlapping of project phases. This, in turn, necessitates improving the interfaces between the different phases to be overlapped (integrated), thus allowing transfer of processes, information and knowledge from one individual or team to another. This transfer between phases, within and between projects, is one of the basic challenges to the philosophy of project management. To make the process transfer more transparent with minimal loss of momentum and project knowledge, this paper draws upon Total Quality Management (TQM) and Business Process Re-engineering (BPR) philosophies to develop a Best Practice Model for managing project phase integration. The paper presents the rationale behind the model development and outlines its two key parts; (1) Strategic Framework and (2) Implementation Plan. Key components of both the Strategic Framework and the Implementation Plan are presented and discussed.
Resumo:
In an era of rapidly changing economic, social and environmental conditions, urban and regional planning education must be resilient, innovative and able to deal with the complex political and socio-economic fabric of post-modern cities. As a consequence, urban and regional planning education plays a fundamental role in educating and forming planning practitioners that will be able to tackle such complexity. However, not many tertiary education institutions provide a trans-cultural engagement opportunity for students, where the need to internationalise planning education has been widely recognised worldwide. The aim of this paper is to communicate the findings of three overseas study trips (Kuala Lumpur-Malaysia, Daejeon-Korea, Istanbul and Gallipoli-Turkey) that students of Queensland University of Technology are taken to where these study trips trailed the provision of an innovative tertiary education experience of teaching regional planning in an international context. The findings of the pedagogic analyses of the study reveal that the exposure of students to different planning processes and practices give them a new outlook on what they knew from their own country and provide them with useful insights on international planning issues and cultural differences and barriers.
Resumo:
When an organisation becomes aware that one of its products may pose a safety risk to customers, it must take appropriate action as soon as possible or it can be held liable. The ability to automatically trace potentially dangerous goods through the supply chain would thus help organisations fulfill their legal obligations in a timely and effective manner. Furthermore, product recall legislation requires manufacturers to separately notify various government agencies, the health department and the public about recall incidents. This duplication of effort and paperwork can introduce errors and data inconsistencies. In this paper, we examine traceability and notification requirements in the product recall domain from two perspectives: the activities carried out during the manufacturing and recall processes and the data collected during the enactment of these processes. We then propose a workflow-based coordination framework to support these data and process requirements.