865 resultados para Preventing maintenance


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1980, a Vanguard High Pressure Water Blaster capable of providing 10 gallons of water per minute at 2000 psi was purchased to evaluate water blasting as a crack cleaning method prior to crack filling on asphalt concrete pavements. Afer some iniital trials demonstrated its effectiveness of removing dirt, debris and vegetation, it was included in joint and crack maintenance research on Iowa 7 in Webster County. The objective of the research was to evaluate six crack preparation methods and seven "sealant" materials. The cleaning and sealing was performed in the spring of 1983. Visual evaluations of the performance were made in the fall of 1983 and spring of 1985. Compressed air and/or high pressure water did not adequately prepare cracks less than 3/8 inch wide. Routing or sawing was necessary to provide a sealant reservoir. The water blaster was more effective than compressed air in removing dirt, debris and vegetation but this did not yield significant improvement in sealant adhesion or longevity. Periodic crack filling is necessary on ACC surfaces throughout the remaining life of the pavement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: 1. design criteria and levels of maintenance 2. consistency in the use of standards among jurisdictions 3. consolidation of maintenance operations at one jurisdictional level and 4. jurisdictional authority for roads. The issues formed the background for Research Project HR-265.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of deicing salts in this part of the country is a necessity to remove ice from our bridges. The use of these salts has always been a problem since the chloride-ions penetrate the concrete and reach the steel and cause corrosion which eventually cause deterioration of both the steel and concrete. One method used to try to prevent this from happening was to apply a waterproof membrane to the concrete after it was placed. This method did help, but was not cost effective as the longevity of the membrane system was of relatively short duration. For this reason, this research project was initiated. After the original deck was placed a second layer of concrete about 1 1/2" thick was placed on top. Biennial evaluation of the decks included testing for delaminations and steel corrosion. Cores were also obtained for a chloride analysis. Testing and observations showed the two-layer bridge deck to be effective in preventing corrosion. Since the time this project was initiated, epoxy steel has been introduced and is a cost effective way to protect the steel from corrosion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The major problem with durability of asphalt cement concrete (ACC) overlays to rehabilitate jointed portland cement concrete (PCC) pavement comes from reflective cracking. The objective of this research was to evaluate the effectiveness of Glasgrid in regard to preventing reflection cracking. Glasgrid is a glass fiber mesh with 1/2 inch by 1 inch openings (Figure 1). Each strand is composed of many small glass fibers. After the grid is formed, it is coated with a polymer modified asphalt cement. In 1986, four experimental Glasgrid test sections were incorporated into Polk County project IR-35-2(191)67--12-77 on Interstate 35 from IA 5 to the west 1-80 interchange on the west edge of Des Moines, Single and double layers of Glasgrid were placed over transverse cracks and joints of the existing PCC pavement. The Glasgrid was placed on the PCC pavement for one section and between lifts of the ACC resurfacing on the other three sections. The four Glasgrid sections were compared to two sections without Glasgrid for four years. The sections were reviewed annually to determine how many cracks or joints had reflected through the resurfacing. Glasgrid placed on the PCC pavement was more effective at preventing reflection cracking than Glasgrid between lifts of AC resurfacing. In general, Glasgrid yielded a small reduction or retardation in the amount of reflection cracking, but not sufficient to justify additional expense for the use of Glasgrid.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most states, including Iowa, have a significant number of substandard bridges. This number will increase significantly unless some type of preventative maintenance is employed. Both the Iowa Department of Transportation and Iowa counties have successfully employed numerous maintenance, repair and rehabilitation (MR&R) strategies for correcting various types of deficiencies. However, successfully employed MR&R procedures are often not systematically documented or defined for those involved in bridge maintenance. This study addressed the need for a standard bridge MR&R manual for Iowa with emphasis for secondary road applications. As part of the study, bridge MR&R activities that are relevant to the state of Iowa have been systematically categorized into a manual, in a standardized format. Where pertinent, design guidelines have been presented. Material presented in this manual is divided into two major categories: 1) Repair and Rehabilitation of Bridge Superstructure Components, and 2) Repair and Rehabilitation of Bridge Substructure Components. There are multiple subcategories within both major categories that provide detailed information. Some of the detailed information includes step-by-step procedures for accomplishing MR&R activities, material specifications and detailed drawings where available. The source of information contained in the manual is public domain technical literature and information provided by Iowa County Engineers. A questionnaire was sent to all 99 counties in Iowa to solicit information and the research team personally solicited input from many Iowa counties as a follow-up to the questionnaire.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The large volume of traffic on the interstate system makes it difficult to make pavement repairs. The maintenance crew needs 4-5 hours to break out the concrete to be replaced and prepare the hole for placing new concrete. Because of this it is usually noon before the patch can be placed. Since it is desirable to remove the barricades before dark there are only 7-8 hours for the concrete to reach the required strength. There exists a need for a concrete that can reach the necessary strength (modulus of rupture = 500 psi) in 7-8 hours. The purpose of this study is to determine if type III cement and/or an accelerator can be used in an M-4 mix to yield a fast setting patch with very little shrinkage. It is recognized that calcium chloride is a corrosive material and may therefore have detrimental effects upon the reinforcing steel. The study of these effects, however, is beyond the scope of this investigation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The pathological formation of proteinaceous aggregates that accumulate into the brain cells of patients are hallmarks of neurodegenerative diseases such as Alzheimer's disease, amyotrophic lateral sclerosis and the heterogeneous group of polyglutamine (polyQ) diseases. In the polyQ diseases, the most upstream events of the pathogenic cascade are the misfolding and aggregation of proteins, such as huntingtin in Huntington's disease, that contain expanded stretch of glutamine residues above 35--‐40 repeats. This expanded polyQ stretch triggers the misfolding and aggregation of cytotoxic polyQ proteins in the neurons that cause cell death through different processes, like apoptosis, excessive inflammation, formation of free radicals, eventually leading to neuronal loss and neurodegeneration. This study focuses on the cellular network of chaperone proteins that can prevent protein aggregation by binding misfolding intermediates and may, as in the case of HSP70, actively unfold misfolded proteins into refoldable non--‐toxic ones (Hinault et al., 2010; Sharma et al., 2011). The chaperones can also collaborate with the proteasome to convert stable harmful proteins into harmless amino acids. Thus, the chaperone proteins that are the most important cellular factors of prevention and curing of protein misfolding, are negatively affected by aging (Morley et al., 2002) and fail to act properly in the neurons of aged persons, which eventually may lead to neurodegenerative pathologies. The general aim of this research was to identify least toxic drugs that can upregulate the expression of chaperone genes in cells suffering from polyQ--‐ mediated protein aggregation and degeneration. The specific aim of this study was to observe the effect of ten drugs on polyQ aggregation in a recombinant nematode Caenorhabditis elegans expressing a chimeric protein containing a sequence of 35 glutamines (Q35) fused to the green fluorescent protein in muscle cells, which causes an age--‐ and temperature--‐ dependent phenotype of accelerated paralysis. The drugs were selected after having proven their causing the overexpression of chaperone proteins in a previous wide screening of 2000 drugs on the moss plant Physcomitrella patens. The screening that we performed in this study was on these ten drugs. It suggested that piroxicam and anisindione were good reducers of polyglutamine disease mediated paralysis. A hypothesis can be made that they may act as good enhancers of the heat shock response, which causes the overexpression of many HSP chaperones and thus reduce motility impairment of polyQ disease expressing nematodes. Piroxicam was found to have the greatest effect on reducing polyQ35 proteins aggregates mediated paralysis in a dose--‐dependent manner but was also found to either have a toxic effect on wild type C.elegans, either to change its natural motility behavior, eventually reducing its motility in both cases. Chloroform should be preferred over DMSO as a drug solvent as it appears to be less toxic to C.elegans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the main problems of bridge maintenance in Iowa is the spalling and scaling of the decks. This problem stems from the continued use of deicing salts during the winter months. Since bridges will frost or freeze more often than roadways, the use of deicing salts on bridges is more frequent. The salt which is spread onto the bridge dissolves in water and permeates into the concrete deck. When the salt reaches the depth of the reinforcing steel and the concentration at that depth reaches the threshold concentration for corrosion (1.5 lbs./yd. 3 ), the steel will begin to oxidize. The oxidizing steel must then expand within the concrete. This expansion eventually forces undersurface fractures and spalls in the concrete. The spalling increases maintenance problems on bridges and in some cases has forced resurfacing after only a few years of service. There are two possible solutions to this problem. One solution is discontinuing the use of salts as the deicing agent on bridges and the other is preventing the salt from reaching or attacking the reinforcing steel. This report deals with one method which stops the salt from reaching the reinforcing steel. The method utilizes a waterproof membrane on the surface of a bridge deck. The waterproof membrane stops the water-salt solution from entering the concrete so the salt cannot reach the reinforcing steel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project involved the evaluation of several aggregates previously rated poor to excellent with respect to skid resistance and certain mix design parameters. An open graded asphalt friction course was evaluated using 4 comparably graded aggregates: quartzite, fine grained limestone, coarse limestone and lightweight expanded shale. The performance investigations involved the verification of observations of the quartzite test sections, evaluation of the effect of blending the superior quartzite with a typical coarse grained-textured limestone, and the evaluation of the limestone. The effects of traffic on the aggregates used in the test sections were studied, as well as the relationship between asphalt content levels and traffic with respect to performance. The bond of the open graded friction course mixture was also evaluated. The SN performance of all test sections after sixteen months of exposure was found to be satisfactory in that none of the material combinations had polished to the point where unacceptable SN levels developed. When material combinations were compared, significant differences were noted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An optimum allocation model has been utilized to examine the existing allocation of highway segments to maintenance garages in the Hamlin study area. The model has also been used to evaluate the financial effect of closing the garage at Hamlin. The examination of the study area shows that only three of 48 highway segments should be reallocated at an annual operational savings of approximately $1,400. The study concludes there would be an annual operational savings of approximately 128,700 if the garage at Hamlin were closed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the 1980-81 fiscal year, the Office of Transportation Research conducted a study to examine the existing locations of highway maintenance garages in a study area provided by the Office of Maintenance. The study successfully identified a model referred to as an "Optimum Allocation Model" for examining highway maintenance garage locations in a given area. This model can optimally assign highway segments to maintenance garages and can also be used to evaluate the financial impact of closing or relocating a highway maintenance garage utilizing the highway maintenance-related data currently available at the Iowa DOT. The present study employs the optimum allocation model to examine the existing highway maintenance garage locations in two selected areas in the southeastern and southwestern parts of the state. These areas were selected by the Office of Maintenance and are referred to as "Study Area No. 1" and "Study Area No. 2" in this study. These study areas are shown in Appendices 1 and 2, respectively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An optimum allocation model has been utilized to examine the existing allocation of highway segments to maintenance garages in the Tama and Blairstown study area. The model has also been used to evaluate the financial impact of closing the highway maintenance garages at Tama and Blairstown and building a new garage at the junction of U.S. 30 and Iowa 21. The examination of the study area shows that only 13 of 91 highway segments were reallocated under optimum procedures at an annual operational savings of approximately $13,200. The study concludes there would be an annual operational savings of approximately $48,200 if the garages at Tama and Blairstown were closed and a new garage was built at the junction of U.S. 30 and Iowa 21.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A linear programming model is used to optimally assign highway segments to highway maintenance garages using existing facilities. The model is also used to determine possible operational savings or losses associated with four alternatives for expanding, closing and/or relocating some of the garages in a study area. The study area contains 16 highway maintenance garages and 139 highway segments. The study recommends alternative No. 3 (close Tama and Blairstown garages and relocate new garage at Jct. U.S. 30 and Iowa 21) at an annual operational savings of approximately $16,250. These operational savings, however, are only the guidelines for decisionmakers and are subject to the required assumptions of the model used and limitations of the study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In June 2001, the Iowa Department of Transportation announced the imminent closure and disposal of selected highway maintenance facilities as part of cost-cutting measures mandated by the Iowa legislature, an action that was to be completed by July 31, 2001. The DOT recognized that some of these facilities might be "historical sites," which in the Iowa Code are defined as any district, site, building or structure listed on the National Register of Historic Places or identified as eligible for listing in the National Register by the State Historic Preservation Office. Section 303 of the Code requires state agencies to "enter into an agreement with the Department of Cultural Affairs [in which the SHPO is located] to ensure the proper management, maintenance and development of historical sites." The DOT saw this disposal action as an opportunity to compile information about its highway maintenance facilities that could be employed in development of a management program for historic highway maintenance facilities in the future. Subsequently, the DOT authorized a similar study of highway weigh stations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study is to provide recommendations relative to the location and construction needs for highway maintenance facilities within the state of Iowa. These recommendations were to be developed with consideration being given to the public's expectations and priorities for highway maintenance services. As a part of the study effort, a review was made of the methods used by other states to deliver highway maintenance services. To accomplish the study, Wilbur Smith Associates undertook a series of tasks. These efforts included gathering of data and information to characterize the various maintenance programs and the delivery of maintenance and operations services by the Department. We researched the delivery of highway maintenance services in other states. Interviews with Iowa DOT maintenance personnel were accomplished. A schedule of public hearings was developed and ten hearings were held. All the information was integrated and various analyses were made. From these analyses we drew conclusions and developed recommendations.